This document provides an inspection and test plan for underground piping of glass reinforced plastic (GRP) at the Two x 500MW Mong Duong 1 Thermal Power Plant project. The plan outlines five key inspection points: 1) material verification, 2) excavation of the trench, 3) installation of the GRP piping, 4) pressure testing, and 5) backfilling. Attachments include inspection report forms, requirements for laminating GRP joints, a pressure test report format, and a checklist for hydrostatic and pneumatic testing.

Uploaded by

Tran Khuynh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
183 views8 pages

MD1-0-T-030-05-00073 - ITP For Under Ground Piping PDF

This document provides an inspection and test plan for underground piping of glass reinforced plastic (GRP) at the Two x 500MW Mong Duong 1 Thermal Power Plant project. The plan outlines five key inspection points: 1) material verification, 2) excavation of the trench, 3) installation of the GRP piping, 4) pressure testing, and 5) backfilling. Attachments include inspection report forms, requirements for laminating GRP joints, a pressure test report format, and a checklist for hydrostatic and pneumatic testing.

Uploaded by

Tran Khuynh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

FOR CONSTRUCTION

0 Sep.18. 2012 Issue for Construction H.O.HONG H.O.HONG M.G.KIM


B Aug.10. 2012 Issue for Approval H.O.HONG H.O.HONG M.G.KIM
A Jul.04. 2012 Issue for Approval H.O.HONG H.O.HONG M.G.KIM
REV. DATE DESCRIPTION DSGN CHKD APPD

PROJECT :

TWO(2) x 500 MW MONG DUONG 1 THERMAL POWER PLANT


EMPLOYER :

CONSULTANT :

CONTRACTOR :

DESIGNED BY DATE TITLE :

H.O.HONG Jul.04.2012
CHECKED BY DATE
INSPECTION & TEST PLAN
FOR UNDER GROUND PIPING OF GRP
H.O.HONG Jul.04.2012
APPROVED BY DATE PROJECT NUMBER DOCUMENT NUMBER REV.

M.G.KIM Jul.04.2012 ADB/MD1-TPIP/EPC150911 MD1-0-T-030-05-00073 0


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT
INSPECTION AND TEST PLAN FOR UNDER GROUND PIPING OF GRP REV. 0

TABLE OF CONTENTS

1.0 MATERIAL VERIFICATION

2.0 EXCAVATION OF TRENCH

3.0 GRP PIPING

4.0 PRESSURE TEST

6.0 BACKFILLING

7.0 ATTACHMENT
# 1 INSPECTION REPORT FOR UNDER GROUND PIPE
# 2 LAMINATION JOINT FOR GRP
# 3 PRESSURE TEST REPORT
# 4 LAMINATION JOINT INSPECTION RECORD
# 5 CHECK LIST BEFORE HYDROSTATIC AND PNEUMATIC
TEST
HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Piping
ITP No. ITP-P-101
INSPECTION & TEST PLAN DESCRIPTION OF WORK :
Rev. No. 0
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT PAGE 1 OF 1
Under Ground Piping of GRP
DATE Sep. 18. 2012

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

1 Material Verification Material Spec. ITP-P-101-01 W R R

2 Excavation of Trench As per Design DWG. ITP-P101-01 W W S


- Excavation Depth
- Bedding(Material & Thickness)

3 GRP Piping As per Design DWG. W W S


1) Lowering the pipe in the trench Manufacturer’s Instruction ITP-P-101-01
2) Joint Visual Inspection AWWA M45 ITP-P-101-02/04
- Lamination Joint
- Flange Joint
3) Deflection Check
- Measurement

4 Pressure Test Hydro Pressure = 1.5ⅹ ITP-P-101-03/05 H H W


1) Pneumatic Test
Design Pressure
2) Hydrostatic Test

5 Backfilling ITP-P-101-01 W W S
As per Design DWG.
1) Backfilling Material
2) Backfilling

LEGEND H : HOLD POINT PREPARED BY REVIEWED BY APPROVED BY


W : WITNESS POINT
R : DOC. REVIEW H. O. HONG H. O. HONG M. G. KIM
S : SURVEILLANCE HDEC QA/QC HDEC QA/QC HDEC QA/QC
HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR UNDER GROUND PIPE


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

ISO DWG. NO.: SYSTEM :

P&ID NO. : LINE NO.:

NO. CHECK ITEM RESULT REMARK

1 Material Verification

Excavation of Trench
2
- Depth and Width

Bedding
3 - Preparation of bedding
- No Underground Water

GRP Piping

- Lowering the pipe in the Trench/ Alignment


4
- Visual Inspection for Joint Assembly

- Deflection Check & Leveling of Pipe

5 Pressure Test(Hydrostatic Test or Pneumatic Test)

6 Backfilling

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-P-101-01


HYUNDAI ENG. & CONST. CO., LTD.

LAMINATION JOINT FOR GRP


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

ISO DWG. NO.: SYSTEM :

P&ID NO. : LINE NO.:

NO. CHECK ITEM RESULT REMARK

1 Material Verification

2 Correct Dimension, Location and Orientation

Cleaning & Edge Preparation check before Lamination


3
work

4 Lamination on the GRP

5 Curing Time to be Elapsed

6 Final Visual Inspection

7 Others

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-P-101-02


HYUNDAI ENG. & CONST. CO., LTD.

PRESSURE TEST REPORT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

PACKAGE NO. : ISO DWG NO.:

P&ID NO.: LINE NO.:

SYSTEM: DATE OF TEST :

TYPE OF TEST : DESIGN PRESSURE / TEMP :


□ HYDROSTATIC □ PNEUMATIC □ OTHERS REQUIRED TEST PRESSURE :

TEST MEDIUM / TEMP : ACTUAL TEST PRESSURE :

PRESSURE GAUGE SERIAL NO.:

PRESSURE HOLDING TIME : MIN., START : FINISH :

SKETCH OF TEST BOUNDARIES :

RESULT : ACCEPT REJECT

REMARK :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :
FORM NO. ITP-P-101-03
HYUNDAI ENG. & CONST. CO., LTD.

LAMINATION JOINT INSPECTION RECORD


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

ISO Drawing No : Rev. No : P&ID No :

Line No : System :

Dia. Thick Lamination Barcol hardness test


Joint No.
(㎜)
Laminator. Visual REMARK
ness Date Accept Reject

SUBCONTRACTOR CONTRACTOR EMPLOYER

SIGN

DATE

FORM NO. ITP-P-101-04


HYUNDAI ENG. & CONST. CO., LTD.

CHECK LIST BEFORE HYDROSTATIC AND PNEUMATIC TEST


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

TEST PACKAGE NO.: ISO DWG NO.:

P&ID NO.: LINE NO.:

SYSTEM:

NO. CHECK ITEM RESULT REMARK

Construction is completed according the Design


1
Requirements.

System Restraints such as Thrust Restraints, other


2 Supports and Anchors are in Place and Properly Cured
with no Deflects

3 Pipe Deflection within Requirement Limits

Pressure G auge for Hydro Testing should be Calibrated


4
for use

5 Others

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-P-101-05