MD1-0-T-030-05-00073 - ITP For Under Ground Piping PDF
MD1-0-T-030-05-00073 - ITP For Under Ground Piping PDF
PROJECT :
CONSULTANT :
CONTRACTOR :
H.O.HONG Jul.04.2012
CHECKED BY DATE
INSPECTION & TEST PLAN
FOR UNDER GROUND PIPING OF GRP
H.O.HONG Jul.04.2012
APPROVED BY DATE PROJECT NUMBER DOCUMENT NUMBER REV.
TABLE OF CONTENTS
6.0 BACKFILLING
7.0 ATTACHMENT
# 1 INSPECTION REPORT FOR UNDER GROUND PIPE
# 2 LAMINATION JOINT FOR GRP
# 3 PRESSURE TEST REPORT
# 4 LAMINATION JOINT INSPECTION RECORD
# 5 CHECK LIST BEFORE HYDROSTATIC AND PNEUMATIC
TEST
HYUNDAI ENG. & CONST. CO., LTD.
DISCIPLINE : Piping
ITP No. ITP-P-101
INSPECTION & TEST PLAN DESCRIPTION OF WORK :
Rev. No. 0
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT PAGE 1 OF 1
Under Ground Piping of GRP
DATE Sep. 18. 2012
5 Backfilling ITP-P-101-01 W W S
As per Design DWG.
1) Backfilling Material
2) Backfilling
1 Material Verification
Excavation of Trench
2
- Depth and Width
Bedding
3 - Preparation of bedding
- No Underground Water
GRP Piping
6 Backfilling
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
1 Material Verification
7 Others
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-P-101-03
HYUNDAI ENG. & CONST. CO., LTD.
Line No : System :
SIGN
DATE
SYSTEM:
5 Others
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :