METRADO EMISOR ALCANTARILLADO 200 MM

This document provides details on the installation of a sewer system and wastewater treatment in Carampa, Peru. It includes 14 sections of sewer line to be installed, ranging from 13.42 meters to 80 meters in length. It lists the tasks needed including preliminary cleaning of the land, tracing and planning of the system, manual excavation of trenches for pipes, and backfilling with excavated material. The project aims to improve the water system and install sewage collection and wastewater treatment for the population center.

Uploaded by

GC Eliot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views10 pages

METRADO EMISOR ALCANTARILLADO 200 MM

This document provides details on the installation of a sewer system and wastewater treatment in Carampa, Peru. It includes 14 sections of sewer line to be installed, ranging from 13.42 meters to 80 meters in length. It lists the tasks needed including preliminary cleaning of the land, tracing and planning of the system, manual excavation of trenches for pipes, and backfilling with excavated material. The project aims to improve the water system and install sewage collection and wastewater treatment for the population center.

Uploaded by

GC Eliot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

METRADOS

PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho

Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
03.00 INSTALACION DE RED DE ALCANTARILLADO
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 1,310.78
TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 2.20 57.20
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 2.20 108.77
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 2.20 77.22
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 2.20 53.94
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 2.20 48.84
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 2.20 73.13
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 2.20 42.72
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 2.20 156.31
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 2.20 129.84
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 2.20 29.52
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 2.20 125.16
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 2.20 176.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 2.20 127.93
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 2.20 104.19

03.01.02 TRAZO, NIVELES Y REPLANTEO EMISOR m 595.81


TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 26.00
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 49.44
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 35.10
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 24.52
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 22.20
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 33.24
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 19.42
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 71.05
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 59.02
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 13.42
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 56.89
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 80.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 58.15
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 47.36

03.02 MOVIMIENTO DE TIERRAS

03.02.01 EXCAVACION MANUALDE ZANJA PARA TUBERIA TN M3 792.84

TRAMO 01 BZ32 @ BZ148 200 0.85 1.00 26.00 0.80 1.20 21.22

TRAMO 02 BZ148 @ BZ149 200 0.85 1.00 49.44 0.80 2.11 70.94

TRAMO 03 BZ149 @ BZ150 200 0.85 1.00 35.10 0.80 3.62 86.40

TRAMO 04 BZ150 @ BZ151 200 0.85 1.00 24.52 0.80 2.71 45.19

TRAMO 05 BZ151 @ BZ152 200 0.85 1.00 22.20 0.80 1.20 18.12

TRAMO 06 BZ153 @ BZ154 200 0.85 1.00 33.24 0.80 3.34 75.49

TRAMO 07 BZ154 @ BZ155 200 0.85 1.00 19.42 0.80 3.66 48.33

TRAMO 08 BZ155 @ BZ156 200 0.85 1.00 71.05 0.80 1.52 73.44

TRAMO 09 BZ156 @ BZ157 200 0.85 1.00 59.02 0.80 1.20 48.16

TRAMO 10 BZ157 @ BZ158 200 0.85 1.00 13.42 0.80 1.20 10.95

TRAMO 11 BZ157 @ BZ158 200 0.85 1.00 56.89 0.80 2.24 86.65

TRAMO 12 BZ158 @ BZ159 200 0.85 1.00 80.00 0.80 2.24 121.86

TRAMO 13 BZ159 @ BZ160 200 0.85 1.00 58.15 0.80 1.20 47.45

TRAMO 14 BZ160 @ BZ161 200 0.85 1.00 47.36 0.80 1.20 38.65

03.02.02 EXCAVACION MANUAL DE ZANJA PARA TUBERIA TSR M3 38.73


TRAMO 01 BZ32 @ BZ148 200 0.15 1.00 26.00 0.80 1.20 3.74
TRAMO 02 BZ148 @ BZ149 200 0.15 1.00 49.44 0.80 2.11 12.52
TRAMO 03 BZ149 @ BZ150 200 0.15 1.00 35.10 0.80 3.62 15.25
TRAMO 04 BZ150 @ BZ151 200 0.15 1.00 24.52 0.80 2.71 7.97
TRAMO 05 BZ151 @ BZ152 200 0.15 1.00 22.20 0.80 1.20 3.20
TRAMO 06 BZ153 @ BZ154 200 0.15 1.00 33.24 0.80 3.34 13.32
TRAMO 07 BZ154 @ BZ155 200 0.15 1.00 19.42 0.80 3.66 8.53
TRAMO 08 BZ155 @ BZ156 200 0.15 1.00 71.05 0.80 1.52 12.96
TRAMO 09 BZ156 @ BZ157 200 0.15 1.00 59.02 0.80 1.20 8.50
TRAMO 10 BZ157 @ BZ158 200 0.15 1.00 13.42 0.80 1.20 1.93
METRADOS

PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho

Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
TRAMO 11 BZ157 @ BZ158 200 0.15 1.00 56.89 0.80 2.24 15.29
TRAMO 12 BZ158 @ BZ159 200 0.15 1.00 80.00 0.80 2.24 21.50
03.02.03 TRAMO 13 BZ159 @ BZ160 200 0.15 1.00 58.15 0.80 1.20 8.37 6.82
TRAMO 14 BZ160 @ BZ161 200 0.15 1.00 47.36 0.80 1.20 6.82
03.02.04 ZARANDEADO DE MATERIAL PROCEDENTE DE EXCAVACION m3 373.10
TRAMO 01 BZ32 @ BZ148 200 0.40 1.00 26.00 0.80 1.20 9.98
TRAMO 02 BZ148 @ BZ149 200 0.40 1.00 49.44 0.80 2.11 33.38
TRAMO 03 BZ149 @ BZ150 200 0.40 1.00 35.10 0.80 3.62 40.66
TRAMO 04 BZ150 @ BZ151 200 0.40 1.00 24.52 0.80 2.71 21.26
TRAMO 05 BZ151 @ BZ152 200 0.40 1.00 22.20 0.80 1.20 8.52
TRAMO 06 BZ153 @ BZ154 200 0.40 1.00 33.24 0.80 3.34 35.53
TRAMO 07 BZ154 @ BZ155 200 0.40 1.00 19.42 0.80 3.66 22.74
TRAMO 08 BZ155 @ BZ156 200 0.40 1.00 71.05 0.80 1.52 34.56
TRAMO 09 BZ156 @ BZ157 200 0.40 1.00 59.02 0.80 1.20 22.66
TRAMO 10 BZ157 @ BZ158 200 0.40 1.00 13.42 0.80 1.20 5.15
TRAMO 11 BZ157 @ BZ158 200 0.40 1.00 56.89 0.80 2.24 40.78
TRAMO 12 BZ158 @ BZ159 200 0.40 1.00 80.00 0.80 2.24 57.34
TRAMO 13 BZ159 @ BZ160 200 0.40 1.00 58.15 0.80 1.20 22.33
TRAMO 14 BZ160 @ BZ161 200 0.40 1.00 47.36 0.80 1.20 18.19

03.02.05 TENDIDO DE CAMA DE APOYO E=10CM M 595.81


TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 26.00
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 49.44
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 35.10
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 24.52
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 22.20
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 33.24
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 19.42
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 71.05
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 59.02
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 13.42
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 56.89
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 80.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 58.15
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 47.36

03.02.06 RELLENO DE ZANJAS COMPACTADO CON MATERIAL PROPIO M3 559.65


TRAMO 01 BZ32 @ BZ148 200 0.60 1.00 26.00 0.80 1.20 14.98
TRAMO 02 BZ148 @ BZ149 200 0.60 1.00 49.44 0.80 2.11 50.07
TRAMO 03 BZ149 @ BZ150 200 0.60 1.00 35.10 0.80 3.62 60.99
TRAMO 04 BZ150 @ BZ151 200 0.60 1.00 24.52 0.80 2.71 31.90
TRAMO 05 BZ151 @ BZ152 200 0.60 1.00 22.20 0.80 1.20 12.79
TRAMO 06 BZ153 @ BZ154 200 0.60 1.00 33.24 0.80 3.34 53.29
TRAMO 07 BZ154 @ BZ155 200 0.60 1.00 19.42 0.80 3.66 34.12
TRAMO 08 BZ155 @ BZ156 200 0.60 1.00 71.05 0.80 1.52 51.84
TRAMO 09 BZ156 @ BZ157 200 0.60 1.00 59.02 0.80 1.20 34.00
TRAMO 10 BZ157 @ BZ158 200 0.60 1.00 13.42 0.80 1.20 7.73
TRAMO 11 BZ157 @ BZ158 200 0.60 1.00 56.89 0.80 2.24 61.17
TRAMO 12 BZ158 @ BZ159 200 0.60 1.00 80.00 0.80 2.24 86.02
TRAMO 13 BZ159 @ BZ160 200 0.60 1.00 58.15 0.80 1.20 33.49
TRAMO 14 BZ160 @ BZ161 200 0.60 1.00 47.36 0.80 1.20 27.28
03.02.07 ELIMINACION DEL MATERIAL EXCEDENTE CARGUIO MAQUINA (L=1KM M3 47.92
TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 AREA = 0.08 2.09
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 AREA = 0.08 3.98
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 AREA = 0.08 2.82
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 AREA = 0.08 1.97
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 AREA = 0.08 1.79
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 AREA = 0.08 2.67
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 AREA = 0.08 1.56
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 AREA = 0.08 5.71
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 AREA = 0.08 4.75
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 AREA = 0.08 1.08
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 AREA = 0.08 4.58
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 AREA = 0.08 6.43
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 AREA = 0.08 4.68
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 AREA = 0.08 3.81
03.03 SUMINISTRO Y MONTAJE DE TUBERIAS
03.03.01 TUBERIA PVC NORMA ISO 4435 Ø 200mm S-25 M 1.20 595.81
TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 26.00
METRADOS

PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho

Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 49.44
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 35.10
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 24.52
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 22.20
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 33.24
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 19.42
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 71.05
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 59.02
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 13.42
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 56.89
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 80.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 58.15
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 47.36
03.04 BUZONES DIAM.=1.20M C/TAPA FºFº
03.04.01 EXCAVACION DE ESTRUCTURAS M3 53.17

1.2 @ 1.50 H= 1.2 1.00 10.00 Area = 1.81 1.40 25.40

1.51 @ 2.00 H= 1.69 1.00 2.00 Area = 1.81 1.89 6.86

3.01 @ 4.00 H= 3.35 1.00 2.00 Area = 1.81 3.55 12.88

4.01 @ 5.00 H= 4.22 1.00 1.00 Area = 1.81 4.42 8.02

03.04.02 BUZON DE CONCRETO 210kg/cm2 und 18.92

1.2 @ 1.50 H= 1.2 1.00 10.00 Area = 1.81 1.40 25.40


menos H= 1.2 1.00 10.00 Area = 1.17 1.40 16.37
1.51 @ 2.00 H= 1.69 1.00 2.00 Area = 1.81 1.89 6.86
menos H= 1.69 1.00 2.00 Area = 1.17 1.89 4.42
3.01 @ 4.00 H= 3.35 1.00 2.00 Area = 1.81 3.55 12.88
menos H= 3.35 1.00 2.00 Area = 1.17 3.55 8.30
4.01 @ 5.00 H= 4.22 1.00 1.00 Area = 1.81 4.42 8.02
menos H= 4.22 1.00 1.00 Area = 1.17 4.42 5.17
03.04.07 ACERO FY= 4200 KG/CM2 kg 1,411.68
buzones Del metrado de acero 1,411.68 1,411.68

03.04.08 ELIMINACION DEL MATERIAL EXCEDENTE CARGUIO MAQUINA (L=1KM M3 69.12


Volumen excavado mas 30% esponjamiento 1.30 1.00 53.17 69.12

03.05 PRUEBA HIDRAULICA


03.05.01 PRUEBA HIDRAULICA + ESCORRENTIA DE TUB. 200MM M 595.81
Igual al entubado de 200mm 1.00 595.81 595.81
CANTIDAD DE ACERO EN BUZONES (SIN ACERO CONSIDERADO EN TECHO)

Para h = 1.20 @ 1.50 m


Acero para losa inferior N° Veces Ø 3/8" Ø 1/2" W(Kg/ml)
ml ml
1.40
2.00 1.70 1.02
1.26
6 4.00 1.56 1.02
0.87
2 4.00 1.17 1.02
Acero Vertical

0.20

1.15 15.00 1.55 1.02


2.90

0.20
Acero Horizontal

d=1.40 1.40 5.00 5.00 1.02

Escalinata

0.40 0.25 5.00 0.90 1.02


0.25
Total ==>

Para h = 2.0m
Acero para losa inferior N° Veces Ø 3/8" Ø 1/2" W(Kg/ml)
ml ml
1.40
2.00 1.70 1.02
1.26
6 4.00 1.56 1.02
0.87
2 4.00 1.17 1.02
Acero Vertical

0.20

1.95 15.00 2.35 1.02


0.20
Acero Horizontal

d=1.40 8.00 5.00 1.02

Escalinata

0.40 0.25 8.00 0.90 1.02


0.25
Total ==>

Para h = 3.01 @ 4.00 m


Acero para losa inferior N° Veces Ø 3/8" Ø 1/2" W(Kg/ml)
ml ml
1.40
2.00 1.70 1.02
1.26
6 4.00 1.56 1.02
0.87
2 4.00 1.17 1.02
Acero Vertical

0.20

3.35 15.00 3.75 1.02


2.90

0.20
Acero Horizontal

d=1.40 1.40 14.00 5.00 1.02

Escalinata

0.40 0.25 14.00 0.90 1.02


0.25
Total ==>

Para h = 4.01 @ 5.00 m


Acero para losa inferior N° Veces Ø 3/8" Ø 1/2" W(Kg/ml)
ml ml
1.40
2.00 1.70 1.02
1.26
6 4.00 1.56 1.02
0.87
2 4.00 1.17 1.02
Acero Vertical

0.20
0.20

4.22 15.00 4.62 1.02


2.90

0.20
Acero Horizontal

d=1.40 1.40 22.00 5.00 1.02

Escalinata

0.40 0.25 22.00 0.90 1.02


0.25
Total ==>
RADO EN TECHO)

W
Kg

3.47

6.36

4.77

23.72

25.50

4.59

68.41 Kg

TOTAL
H CANTIDAD ACERO POR BUZON KG
1.20 10.00 68.41
W 2.00 2.00 98.71
Kg 3.00 2.00 156.23
3.50 1.00 217.69
3.47 TOTAL 15.00 0.00
PROMEDIO POR BUZON
6.36

4.77

35.96
40.80

7.34

98.71 Kg

W
Kg

3.47

6.36

4.77

57.38

71.40

12.85

156.23 Kg

W
Kg

3.47

6.36

4.77
70.69

112.20

20.20

217.69 Kg
ACERO KG
684.11
197.41
312.47
217.69
1411.68
94.11