0% found this document useful (0 votes)
54 views2 pages

WBS Week 2

The document outlines the work breakdown structure (WBS) for a drone delivery project between Wilmont's Pharmacy and Drone Tech. The project aims to develop and test a drone delivery system for pharmaceutical products. Key activities include initiating the project by developing plans and engaging stakeholders, planning elements such as packaging design and training, procuring drones and packaging materials, delivering project milestones like integrating IT systems and customer notifications, conducting deliveries and gathering feedback, and finally reviewing and closing the project.

Uploaded by

Derek FitzGerald
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views2 pages

WBS Week 2

The document outlines the work breakdown structure (WBS) for a drone delivery project between Wilmont's Pharmacy and Drone Tech. The project aims to develop and test a drone delivery system for pharmaceutical products. Key activities include initiating the project by developing plans and engaging stakeholders, planning elements such as packaging design and training, procuring drones and packaging materials, delivering project milestones like integrating IT systems and customer notifications, conducting deliveries and gathering feedback, and finally reviewing and closing the project.

Uploaded by

Derek FitzGerald
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WBS for Drone Tech project for delivery of Wilmont’s Pharmacy products

Project: Wilmont’s Pharmacy / Drone Tech drone delivery system test.

Work Breakdown Structure WBS Dictionary


(WBS)
Rev 1.0 Date 19 Mar 23 Rev 1.0 Date 19 Mar 23

WBS Activity

1.0 Develop drone delivery Overall project


system for pharmaceutical
products.
1.1 Initiating
1.1.1 Develop Scope and Plan Prepare the Statement of Work, Project Cost Estimate, Schedule and other
Baseline Documents
1.1.2 Engage stakeholders Engage with all stakeholders; develop a Stakeholder Register to
determine level of communication with each stakeholder. Determine
scope of project with stakeholders.
1.1.3 Agree project terms Develop formal legal terms of cooperation between Wilmont’s and
Drone Tech. Agree dates for project review meetings.
1.1.4 Finance Initial budget set by the project sponsor; to be reviewed, if needs be,
as the project progresses.
1.1.5 Personnel Personnel assigned to the project to be notified and their roles and
responsibilities defined.

1.2 Planning
1.2.1 Design Specialised delivery packaging and release system to be designed.
1.2.2 Training Training requirements for Walmont’s personnel to be established and
a suitable programme designed.
1.2.3 Scheduling Project timeline to be set. It is constrained by the possibility of poor
weather if it over runs.
1.2.4 IT and Security Both companies’ IT teams to plan for secure exchange of customer
information.
1.2.5 Review Items 1.2.1 to 1.2.4 to be monitored and reviewed on completion
before the delivery phase.
1.2.6 Risk Management Likelihood and severity of risks to the project to be determined;
subject to continuous review at all stages of the project.

1.3 Procurement
1.3.1 Aircraft procurement Four new drones to be procured.
1.3.2 Packaging Materials for the new delivery packaging and release clamps to be
procured
1.4 Project Deliverables
1.4.1 IT systems Wilmont’s and Drone Tech’s IT systems to be securely integrated in
order to take customer orders
1.4.2 Training Training carried out for Wilmont’s personnel; feedback to be gathered
from trainees as to the effectiveness of training.
1.4.3 Packaging Packaging system to be manufactured and tested.
1.4.3 Drone preparation Drones to be painted and packaging release system fitted and tested.
1.4.4 Customer notification Selected customers in the test area to be invited (by Walmont’s) to
use the new drone delivery system when it’s available.
1.4.5 Quality All aspects of the project to be monitored for compliance with project
specifications and opportunities for improvement.
1.4.6 Customer Deliveries Delivery flights to commence no later than 30 November. Customer
feedback to be gathered for continuous improvement efforts.

1.5 Project close


1.5.1 Review project Review customer satisfaction, practicality of operating drone
deliveries and adherence to budget and schedule with a view to
deciding whether to expand deliveries or stop when the project is
complete.
1.5.2 Drone re-role Depending on the outcome of 1.5.1 (above), either keep the drones in
Walmont’s livery or repaint them as Drone Tech aircraft.
1.5.3 Documentation All project documentation to be archived for quality audit and future
reference purposes.