0% found this document useful (0 votes)
61 views2 pages

Assignment CSTHVAC701 LU 2

This document contains an assignment on heat, ventilation and air conditioning (HVAC) systems for a construction technology module. It includes 8 multiple choice and calculation questions that assess understanding of HVAC concepts like ventilation types, duct velocity and material, air flow equations, fresh air volume requirements, maximum air change rates, duct pressure loss calculations, and mechanical fan performance data with changes in speed. Students are asked to answer the questions and show working for calculations, with the assignment due for submission on a specified date and time.

Uploaded by

Wilfharry billy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views2 pages

Assignment CSTHVAC701 LU 2

This document contains an assignment on heat, ventilation and air conditioning (HVAC) systems for a construction technology module. It includes 8 multiple choice and calculation questions that assess understanding of HVAC concepts like ventilation types, duct velocity and material, air flow equations, fresh air volume requirements, maximum air change rates, duct pressure loss calculations, and mechanical fan performance data with changes in speed. Students are asked to answer the questions and show working for calculations, with the assignment due for submission on a specified date and time.

Uploaded by

Wilfharry billy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Department name: CIVIL ENGINEERING

Option/Trade: CONSTRUCTION TECHNOLOGY


Module name: HEAT, VENTILATION AND AIR CONDITIONING
Code: CSTHVAC701
ASSIGNMENT ON LU 2 /20 Marks y3 All

1. Which kind of ventilation is easier to control? /1 Mark


a) Natural b)mechanical c)displacement d)mixing
2. A duct is said to be a low velocity duct if the velocity of air in the duct is up to
/1 Mark
(a) 600 m/min (b) 800 m/min (c) 1200 m/min (d) 1600
m/min
3. The duct is made of /1 Mark
(a) galvanised iron (b) aluminium (c) fiberglass (d) any one of these

4. The rate of flow through an opening due to the wind blowing on the wall containing it
is given by the expression /2 Marks
a) Q = KV/A b) Q = KA/V c) Q = AV/K d) Q = KAV
5. The volume of fresh air required for the removal of body odor is influenced by the air space per
person, the volume decreases as the air space per person increases. /2 Marks
a. True
b. False
6. The maximum rate of air change is __________ /2 Marks
a) 30 per min b) 30 per hour c) 60 per min d) 60 per hour
7. a) A duct of 650 mm diameter and 15 m long carries 144m 3/ minute of air at
20°C. Find the pressure loss in the duct by using the friction chart. /3 Marks

b) Calculate A 10 m long ventilation duct is required to provide air at 0.10 m3/sec at a


pressure drop of 0.15 mm wg and check that the calculated diameter correlates with the
given flow rate (Q) . /3 Marks
8. A mechanical ventilation system has the following fan characteristics: /5 Marks
Discharge (Q1) = 10 m3/s
Pressure (P1) = 500 Pa
Power (W1) = 5 kW
Speed (N1) = 2000 rpm
If the fan speed is increased to 2000 rpm, calculate the revised performance data and
fan efficiency.

N.B: To be submitted on Monday 08/05/2023, at 8:00 Am

You might also like