0% found this document useful (0 votes)
155 views

Change Request Form

This standard change request form is used to request modifications to an existing project. It collects information about the project, requested changes, their potential impacts, and schedule/resource requirements. A decision maker will then approve, reject, defer, or approve with modifications the requested changes and provide justifications.

Uploaded by

James
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views

Change Request Form

This standard change request form is used to request modifications to an existing project. It collects information about the project, requested changes, their potential impacts, and schedule/resource requirements. A decision maker will then approve, reject, defer, or approve with modifications the requested changes and provide justifications.

Uploaded by

James
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Standard Change Request Form

Project Name Reference Number


Project Manager Date Requested
Requestor Date Required

Change Request Details

1.
2.
3.

Impact Analysis
Work products to be modified Version number
1.
2.
3.

State foreseen impact of the suggested changes.

Schedule Impact & Scope of Work

Deliverables Description Effort Date Resource


Hours Required Required
1.
2.
3.

Based on the impact, state the projected timing consequences of making the requested change. List the tasks and work
effort in man hours or man days.

Decision

Approved Rejected
Approved with modifications Deferred

Justifications