0% found this document useful (0 votes)
79 views1 page

LP Ucc Ted p1 DM ST SD BF Ga 0001 2 of 5 - 01

This document appears to be a key plan for a construction project showing three zones with different floor areas. It includes the floor areas in square meters for zones 1 through 3. General notes specify that all levels and dimensions are in millimeters and the cube compressive strength. Abbreviations for vertical and horizontal bars are also included.

Uploaded by

hamed A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

LP Ucc Ted p1 DM ST SD BF Ga 0001 2 of 5 - 01

This document appears to be a key plan for a construction project showing three zones with different floor areas. It includes the floor areas in square meters for zones 1 through 3. General notes specify that all levels and dimensions are in millimeters and the cube compressive strength. Abbreviations for vertical and horizontal bars are also included.

Uploaded by

hamed A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

N
27 28 29 30 31 32 33
ZONE-1 ZONE-2 ZONE-3

2225 7450 4450 6975 3350 9150


DN

4175
150 1000 GENERAL NOTES:
1. ALL LEVELS SHOWN INTHE DRAWINGS ARE QND LEVELS . ABBREVIATIONS:
2. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE MILIMETERS. VB-VERTICAL BAR
Comments:

150 1000
3. CUBE COMPRESSIVE STRENGTH: HB-HORIZONTAL BAR
1150
400 150

Fcu = 40Mpa fy = 500Mpa SB-STARTER BAR


C20
For levels coordinate with approved Arch and
A-13 Landscape shop dwgs
A-13 4. THE CLEAR COVER TO THE REINFORCEMENT INCLUDING LINKS
SHALL BE AS FOLLOWS.
FOUNDATION - 75 mm
IF-INNER FACE
OF-OUTER FACE

GROUND SLAB, BEAMS, COLUMNS & RC WALLS


650

EARTH FACE - 75 mm
For services coordinate with approved MEP services SLAB, BEAMS, COLUMN & RC WALLS
EXPOSED - 50 mm
650 400 1150
GROUND SLABS, BEAMS, SUSPENDED SLABS &
+6.05 TOF 2200 All discipline engineers shal sign co-ordination table BAND BEAMS INTERNAL
BEAMS, CAPPING BEAMS, COLUMNS &
- 40mm

prior to issue to site

5350
5350

RC WALLS INTERNAL - 40mm


RW-4

5. MINIMUM REINFORCEMENT LAP SPLICE FOR .


COLUMN, BEAM, SLAB, RAFT, OTHERS = 50xDia OF BAR, U.N.O
Contractor to make sure to provide IFC reference for 6. FOR ALL MEP OPENINGS REFER TO APPROVED MEP & BUILDERS WORK DRAWINGS.
7. FOR ANY ARCHT'L. OPENINGS REFER TO ARCHITECTURAL SHOP DRAWINGS.
missing door openings
SF-4

600mm
THK.

Certified for coordination with contract documents

Department Company Signature Date


KD 24/06/20
A-12 C19 A-12 Architectural

Structural

Electrical
RW-4

Mechanical
4275

4275
500 725
2925 600 200 1000
500

C19
1105 800 400 800
300 400

200 1000
02 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2203 BASEMENT WALLS / COLUMNS SET-OUTS ZONE-2
RW-3 C1 RW-3 C1 RW-3
3000

2000

A-11 A-11

400
02 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2202 BASEMENT WALLS / COLUMNS SET-OUTS ZONE-2
C25
600mm 600mm
+6.05 TOF
1000mm
+6.05 TOF 300 THK. SF-3 +6.05 TOF
THK.
03 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2151 FOUNDATION/BASEMENT TYP. SECTIONS & DETAILS

F30 THK. 1000 550 350


03 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2150 FOUNDATION/BASEMENT TYP. SECTIONS & DETAILS
1950
450x450x450 Dp. 03 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2103 FOUNDATION / BASEMENT LAYOUT - ZONE 3
3000 +6.05 TOF
300 600

7000
04 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2102 FOUNDATION / BASEMENT LAYOUT - ZONE 2
1000mm

RW-3
1500

CW1
350

THK.

6000
6000

03 LP-UCC-GHD-P1-DM-ST-IFC-1B-PL-2100 FOUNDATION / BASEMENT LAYOUT KEY PLAN


CW1 790 1400 F23 REFERENCE DESIGN DRAWINGS
+4.35 TOF 790
1000mm 150 1000 22000
CW1

CW1

CW1
4095
5295

5295

350mm THK.
FOR CONTINUATION REFER TO MATCHLINE "A-A"

THK.
F24 220 1100 +6.85 TOF

150 1000
650 400 1150
450x450x450 Dp. 560 CW1 600mm C20 01 ISSUED FOR APPROVAL 21MAY2020 SMH MB AM
RW-4 THK. RW-4
A-10 2200 560
A-10

2200
350mm 00 ISSUED FOR APPROVAL 26JUN2018 RAL ABD NF
CW1 THK.

425 1200
520 1630

1050
1400

225 1400
1625

REV: DESCRIPTION DATE DR'N CH'D AP'D


C19 SF-4
2125
DRWG. NO. SD-BF-GA-0001_1/5

375 4140
ISSUES/ REVISIONS

RW-4
2150 600
225

200 800
3500

3500
1300
8400 800
PROJECT:
+3.50 TOF
1625
1625

+6.05 TOF +6.05 TOF 1000mm


1125

550
THK.
DESIGN & BUILD - LUSAIL PALACES
300 250

1000
C19
800

800

800

C3 C3 C3 C3 C4 C5
400

A-9 A-9
550

C5 650 400 1150


3750

2400

RW-4
C4 300 500

1500
+6.85 TOF 3000 400
2125

2750 375 1250


1000 1400 CLIENT:
1575

1000mm +6.85 TOF

2450
2450

5200

+6.85 TOF

450 800 400 800 550


THK. 1575 1000 2075 400
F26 1000mm
3000

1500
1000mm

5450
THK. 950 1650 800

800 400 800


THK.

150

950
+6.85 TOF +6.85 TOF

150
RW-3
575
2000

3000

2000

2000

2000
A-8 350mm
A-8
235

1500 3000x3000x3000 Dp.


1675

THK.
400

1050
1100

250

250
C1 600mm 600mm
1375

C14 SF-3

1500
C9
400

THK. THK.

2000
600 CONSULTANT:
F17 SUMP 1350 4000 F30
1500

2250 1160 1500x1500x1500 Dp.


3000

3000
PIT 3000 800
625 F19
1500

2750
1900

SUMP
1000x1000 PIT 300 +6.85 TOF 500
1125 1125
400
1125

MANHOLE ( TYP.) 2000


F1 325 450 950 1000mm
450
465

400

THK.
1500

A-7 400 1500 400 A-7


350 300

350 300

350 300

350 300
485
750

2865 200 2300


450 450

450 450

450 450

450 450
C1 C3 4505 450 450 DESIGN & BUILD CONTRACTOR:
1500 350 P.O. BOX-201184, DOHA, QATAR.
+6.85 TOF

11000
3000

2030

3000
5250

3000

+6.85 TOF 25 TEL : +974 4429 2220


1500 750mm 1200 1000 FAX : +974 4429 2244
THK. 450 450
550 2500 550 2200
F18 350
F1 1650 1725
750

485
1500

A-6 350mm
THK. 400 1500 +6.85 TOF
350mm A-6 DESIGN CONSULTANT / AOR / EOR
845

1000

THK. 400 1500 400


1125

C1 C3 1500x1500x1500 Dp. 4000 470 1500x1500x1500 Dp.


600 50 1000mm P.O. BOX: 14352, DOHA, QATAR.
2255

400

300 500

400
625 2750 2625 THK. TEL : +974 4428 9444
550 550

3000
3000

400 2000 2000 800 FAX : +974 4444 6127


3725 3000

470 800 400 800 530


GHD Project No. 7511241
2000
1500

SUMP 300x300x350 Dp. SUMP

1330
1500
F30 C14
1375

1000mm PIT +6.85 TOF 600mm 600mm PIT

800 400 800


965 1425 1350 SF-3

970
170

170
THK.
745

THK. THK. INTERIOR DESIGN CONSULTANT:

3000
400

2000

2000

2000
A-5 A-5
550

150
650
575

575
425

1030
C1 P.O. BOX: 202267, DOHA, QATAR.

230

230
RW-3
5450

1500
C9 950 1650
250 +6.20 TOF

+6.85 TOF +6.85 TOF TEL : +974 4429 7997


3495

1300 FAX : +974 4429 7969


2450

2450
5200

650 1000mm 1000mm 1000mm 1000mm


2750

RW-4
195 450 450
1875

1875

THK. THK. THK. THK. 1000 3500

1420
2300 470 350 1500 400 300 500
+6.85 TOF +5.35 TOF +6.85 TOF
LANDSCAPE CONSULTANT:
3750

3750

3750
450

A-4 650 400 1150 A-4


300

400
1000

C3
1375

C3 C3 700 C5 C5 C3
700

C5 F19 400 1000 400 C19


2350

SUMP
F17
2300
1500

PIT SUMP
F26 1000 2700 1425 PIT RW-4
1100

1500x1000/1500
3500

3500
2150 600
400
225

x1500 Dp.
800 400 1000 425

400
100

450 SPECIALIST CONSULTANT:


2025

375 1250 1000 1875 1240 1100 1500 400


1625

1150 400 650

600mm SF-4 C19 C19 C19 SF-4


1400

200

300x300x400 Dp. +6.85 TOF THK.


2200

2200

1000 150

A-3 C23 A-3


400

3000

1500x1500x1500 Dp. RW-4 RW-4 RW-4 C20


600mm
200

1000mm RW-4 +6.85 TOF 140 2100


THK.
1700

THK.
1500

SUMP
2100x2800 SUB-CONTRACTOR:
700

1500x1500x1500 Dp. F30 DOOR OPENING


150 1000
400

1755 3000 1000 2000


1225

Contractor to provide IFC reference for the openings


5200

5200
400 RW-3

400 1735
275

1000mm or RFI no
600mm
800 400 800

SF-3 400
1550

THK. THK.
Door opening not found in IFC dwg
2000

C1 PACKAGE NO. AND NAME:


C1
3550

600mm 1300 400 RW-3


800 400 800

THK. +6.85 TOF +6.85 TOF


PACKAGE - 1
1000 275

275

A-2 C1
C1
1505 A-2 DAILY MAJLIS
RW-3 F30 +6.85 TOF
DRAWING TITLE
BASEMENT FLOOR FOUNDATION
GENERAL ARRANGEMENT PLAN
( ZONE 2 & 3 )
DR'N CH'D APP'D SCALE DATE DWG SIZE:

1 BASEMENT FLOOR - GENERAL ARRANGEMENT PLAN SMH MB AM AS SHOWN 21MAY2020 A1


The Trial Version 0001 SCALE 1:100
DRAWING NUMBER: SHT.NO: REV.NO:

LP-UCC TED-P1-DM-ST SD-BF-GA-0001 2/5 01


UCC0727-QA-FM-0003
REV.0

You might also like