Temporary Structures Hazard Guide
Temporary Structures Hazard Guide
0
LPA Guidelines
LPA Guide
Disclaimer ................................................................................................................................ 2
1. Overview ................................................................................................................................. 3
1.1 Definitions............................................................................................................................... 3
1.1.1 Temporary Structures ......................................................................................................... 3
1.1.2 Further information for reference ....................................................................................... 4
2. Key Considerations – Temporary Structures .............................................................................. 5
2.1 Design and Planning ............................................................................................................... 5
3. General Guide – Temporary Structures ..................................................................................... 7
3.1 Responsibilities ....................................................................................................................... 7
3.1.1 Training and competence ................................................................................................... 8
3.2 Consultation, co-operation and co-ordination ...................................................................... 8
3.3 Design and Planning ............................................................................................................... 9
3.3.3 Engineering .......................................................................................................................... 9
3.4 Event Delivery ....................................................................................................................... 10
3.5 Review................................................................................................................................... 10
3.6 Documentation and records ................................................................................................. 11
4. Suggested Control Measures ................................................................................................. 12
4.1 Sets and scenery ................................................................................................................... 12
4.2 Temporary stages / mobile stage / temporary seating and spectator stands ..................... 12
4.3 Ground support structures / scaffolding – a high risk work license activity ........................ 12
4.4 Exhibition stands / concession stands / ‘popups’ / smaller structures ................................ 13
4.5 Marquees / inflatables.......................................................................................................... 13
4.6 Rigging at outdoor events..................................................................................................... 14
4.7 Fire safety ............................................................................................................................. 14
5. Legislation and Further Guidance ........................................................................................... 15
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Disclaimer
In legislative terms, the requirements of the Work Health and Safety Act 2011 (the WHS Act) and
Work Health and Safety Regulations (the WHS Regulations) are mandatory. In contrast, a guide is
designed to assist obligation holders to comply with the requirements of an act or regulation. The
information contained in the LPA guides is not mandatory, has no legal status and may not apply in
all work situations.
Obligation holders still have a duty to assess the risks in each work situation and take all reasonable
steps to eliminate or minimise the risks that are specific to each work activity.
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
1. Overview
This guide provides information to assist in managing risks associated with temporary structures
used in live entertainment and events. Information in this guide is based on the Work Health and
Safety Act 2011 (WHS Act) and Work Health and Safety Regulations 2011 (WHS Regulations), which
are operational in all states except Victoria and WA, where adoption of the legislation is not yet
enacted (as at Jan 2018).
It is recommended that this information is referenced during the planning and delivery of events to assist
in identifying hazards, assessing risks and determining appropriate control measures to eliminate and or
minimise these risks, so far as reasonably practicable.
This guide does not replace the need to implement risk management strategies, undertake research
or seek specialist advice.
Each worker and person conducting a business or undertaking (PCBU) has a responsibility to
understand their obligations under WHS legislation. Codes of practice and Australian and
international standards provide approved guidance on how to meet work health and safety
obligations.
1.1 Definition
The main risks associated specifically with temporary structures are collapse or structural failure due
to:
This Temporary Structures Safety Guide provides practical information and suggested control
measures for:
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
• Outdoor rigging
• Stages and risers
• Fire safety
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Key information about identified hazards and action taken or required to control risks should be
recorded and transferred from the design phase to those involved in later stages of the lifecycle.
Communicating this information to other duty holders will make them aware of any residual risks
and minimise the likelihood of safety features incorporated into the design being altered or removed
by those engaged in subsequent work on or around the building or structure.
From Section 22
Designers must give adequate information to each person who is provided with the design in order
to give effect to it concerning:
The designer must also, so far as is reasonably practicable, provide this information to any person
who carries out activities in relation to the structure if requested.
The safety report applies to designs of structures that have unusual or atypical features which
present hazards and risks during the construction phase that are unique to the particular design.
• Any hazardous materials or structural features and the designer’s assessment of the risk of
injury or illness to construction workers arising from those hazards
• The action the designer has taken to control those risks, for example changes to the design. The
information requirements under the WHS Act may be incorporated into the safety report
prepared under the WHS Regulations.
The client must provide a copy of the safety report to the principal contractor.
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Additional training and induction to site-specific and job-specific safe work methods may be
required.
Licenses are required for activities deemed as high risk work – see relevant WHS legislation for
details and ensure that all staff undertaking tasks requiring licenses, are indeed holding the
appropriate training documentation.
Additional regulations may be imposed by the local authorities and/or the event insurer, such as
being required to use a registered builder of temporary structures. The City of Sydney and the City of
Melbourne requirements at the following web site are a good example of what may be required
http://www.cityofsydney.nsw.gov.au/development/building-and-construction-
approvals/temporary-structures
http://www.melbourne.vic.gov.au/building-and-development/planning-and-building-
services/building-safety-amenity/pages/temporary-siting-approvals.aspx
PCBUs should use the information in this guide to consult with workers including event staff to
determine the hazards and risks specific to temporary structures planned for your event and how to
best eliminate or minimise these risks using the hierarchy of controls.
Consultation should start as early as possible, before decisions are made, and continue through the
duration of the event through both the dismantling of the structure and any rehabilitation of the
site.
Consider the other parties who will need to be involved in the consultation process in the early
planning stages of the event and determine what information needs to be shared and discussed and
who need to be consulted in the development of the risk assessment and SWMS.
During an event, PCBUs are required to consult, cooperate and coordinate with other PCBUs such as
the venue or site management, production companies, event organisers or promoters, catering
providers, security, subject matter experts such as structural engineers or safety officers, local
authorities or governments, rigging companies, performers, suppliers of plant or equipment,
designers, workers, unions etc. Evidence of this consultation may be required in the event of an
incident or investigation so records do need to be kept.
If employees are represented by health and safety representatives, the consultation must involve
those representatives.
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Areas to address during consultation may include items such as inductions, schedules, floor plans,
set designs, site specific requirements, risk assessments, SWMS, hazards and control measures,
legislative requirements, licences, plant movement, traffic management, exclusion zones, key
contacts, emergency procedures, permits to work.
Opportunities for consultation may include toolbox talks, event briefings, site inspections,
stakeholder meetings, post event reviews, working groups or forums.
Scheduling safety as both the first and last items on a meeting agenda ensures the best coverage of
issues. Items from previous discussions are covered first and any new items raised at the meeting
are then discussed at the end.
There are 2 stages to the design and installation of a temporary structure, both of which require
specific sign offs.
At the design stage, all the aspects of the design need to be brought together and all the parties
need to be in agreement as to both the engineering and operational aspects of the design. The risk
assessments on the use of the design as well as the engineering aspects of the materials used and
the actual physical design will need to be signed off as suitable by all parties ensuing no surprises at
the time of installation and use.
Installation of the structure will need certification each time the structure is erected. This might be a
one-off event but may also require certifications for each town on a tour (i.e. circus set ups) from
relevant engineers and/or local authorities.
3.3.3 Engineering
The structural adequacy of every temporary structure needs to be considered. This could be
assessing the manufacturer’s specifications or engaging an engineer to assess the structural
adequacy of a custom temporary structure.
Designers of structures are often not engineers, but designers, contractors and PCBUs should
determine during the design phase when an engineer and/or appropriate expert should be engaged.
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Engineering certification for temporary structures will define the duration the structure will be
erected for. Engineering for a 1 week structure in summer will certainly be different for a structure
designed for 12 months of use through all 4 seasons.
Adverse weather, especially wind, plays a large part in the design capability and structural adequacy
of a temporary structure. A full range of procedures and policies will need to be in place to cope with
the structure’s ability to cope with various weather conditions. These need to be in place should a
freak weather event threaten the structure with conditions that exceed the designed parameters.
Any temporary structure that covers more than 50m2 ground area and any stage, tent or marquee
that has an unsupported span greater than 8m should be regarded as a large structure and it is best
practice to have this structure’s design engineered. Structures that are hired or have already been
built previously should have an engineering certificate available when it is supplied and any new
design should be engineered from concept through design to construction. It is best practice to have
the design and completed temporary structure engineered where:
• Consultation with relevant PCBUs and workers as well as any public around the site
• Site-specific inductions
• Equipment inspections and/or maintenance
• Work permits or engineering certificate requirements
• Implementation and monitoring controls identified in risk assessments or SWMS
• Compliance to legislative requirements
• Review, consultation and adjustment of control measures as required on site
• Incident reporting and management
• Sign off and handover procedures
3.5 Review
After an event, the following criteria should be reviewed in consultation with relevant parties:
10
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Any of the above documents could be requested to be sighted by another PCBU for verification or
clarification and should be available at all times. Site safety folders are recommended with originals
in a secondary location.
Some WHS documents and records need to be retained for a specific period of time – see relevant
WHS legislation for details.
11
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Where adverse weather or other environmental elements potentially require the full or partial
dismantling of the structure, the effect of additional scenic elements on the dismantling must be
considered. While the overall structure may have been assessed at the design stage, the internal
structure must also be included in the risk assessment. This is especially relevant where the internal
structure is designed/operated by a secondary PCBU or contractor from the external structure
supplier; both must work together to ensure all risks are eliminated or reduced to a practicable
minimum.
4.2 Temporary stages/ mobile stage/ temporary seating and spectator stands
A temporary stage can be as simple as indoor rostra for speeches, a platform for a display or
performance, an outdoor stage. As a general rule any stage or platform designed for general,
unspecified use should have a 7.5kPa capacity (approximately 750kg/m2). This is generally used for
rental and venue owned multi-purpose units where the actual usage is not specified from project to
project. This figure is used by the majority of the European manufacturers of temporary/portable
stage units where specific standards exist for these items. A temporary stage designed and built for a
specific purpose will be subject to a design risk assessment to ensure it is adequate for the event and
truly ‘fit for purpose’.
A mobile stage is a stage that is attached to or is moved by a vehicle or truck. Often the stage is
detached from the vehicle once in place. Mobile stages can also be a ‘float’ or form part of a street
parade. A mobile stage will often have a fixed roof, which is erected once the stage is in place. A
mobile stage should be erected following manufacturers design specification and signed off by a
competent person each time it is erected.
Temporary seating needs to comply with National Construction Code/BCA regulations for Open
Spectator stands (grandstands), which requires a minimum carrying capacity. Temporary seating is
often erected on uneven and unstable ground that is subject to movement during the installation of
the seating. A competent person should assess the ground loading capability and the whole
structure needs to be engineered around what support is available. This may require a geo-tech
assessment as to the suitability of the terrain.
‘The model Work Health and Safety (WHS) Regulations list the work
that requires a high risk work licence. High risk work includes
scaffolding, dogging and rigging work. It also involves using cranes,
forklifts, reach stackers, boilers and boom-type elevating work
12
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
platforms. In most instances if you carry out high risk work you will
need a licence to undertake that type of work.’
This covers what we normally refer to as ground support structures, which ranges from items such
as spectator stands, stage platforms, LED screen and speaker and lighting supports through to grand
stages with associated roof and internal theatrical rigging.
All the many variations and additions to a design need to be carefully considered as they will affect
the manufacturer’s design specification. If these elements were not allowed for in the initial design,
new engineering calculations will need to be made.
Scaffolding built in accordance with AS/NZS 1576 does not necessarily need to be engineered if
signed off by the scaffolding company, however scaffolding used for events is widely used for many
purposes outside of manufacturer’s design specification and these modifications, no matter how
small, should be engineered.
Outdoor staging and temporary structures are often built using a combination of different
manufacturers propriety products, the custom nature of the structure needs to be assessed.
As a general rule any ground support structure or scaffolding where the risk of fall is over 4m in
height and/or covers a floor area of more than 50m2 should be engineered. It is also important to
note that the Code of Practice for Managing the Risk of Falls at the Workplace states that: ‘the
scaffold and its supporting structure is inspected by a competent person before use, after any
incident that could affect its stability (such as a severe storm), after any repairs, and at least every 30
days’
The PCBU, contractors and floor setup staff must ensure the layout of exhibition stands remains
consistent with the planned layout and that access and egress are maintained at all times, especially
at setup and take down time were the venue can be very busy.
Special consideration needs to be taken when planning a stand that has any type of overhead cover
as it will catch heat from below and block fire services from above. Access and egress to a stand and
positioning of emergency equipment needs to be considered at the planning stage to ensure
compliance with local regulations.
4.5 Marquees/inflatables
Generally marquees or tents over 100m2 and seating stands for more than 20 persons are
recognised as temporary structures and may require building certification for each erection. Local
legislation must be investigated and complied with.
All inflatables require engineering certification that specifies ballast requirements, weather
monitoring, evacuation requirements and ‘firestop’ certification.
13
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
NOTE – Inflatable jumping castles, rides or similar amusement structures are regulated under State
Work Health and Safety Acts and are to comply with the Australian Standard AS 3533 Amusement
rides and devices Part Two – Operation and Maintenance.
Contingency plans should be developed for weather considerations and rescheduling or cancellation
as required. This may include rapid dismantling techniques, emergency evacuation plans, site
lockout requirements and emergency services access.
The senior production manager and rigger on such an event must both have the authority and the
resolve to halt works, evacuate structures and ensure design parameters are strictly adhered to.
Communications between the senior rigger, the production manager and the safety team must
ensure the above requirements are met and are able to be enacted.
14
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018
LPA Guide
Identification of safety good practice in the construction and deconstruction of temporary demount-
able structures
http://www.hse.gov.uk/event-safety/tds-report.htm
The Purple Guide to Health, Safety and Welfare at Music and Other Events has been drawn up by the
Events Industry Forum in consultation with the UK events industry, including representatives from
regional and national Government. http://www.thepurpleguide.co.uk/
Safe Work Australia Safe Design of Structures Code of Practice. July 2012
ANSI E1.21-2013
http://webstore.ansi.org/RecordDetail.aspx?sku=ANSI+E1.21-2013
15
Safety Guidelines for the Live Entertainment and Events Industries – liveperformance.com.au
Temporary Structures Hazard Guide
Date: February 2018