B. Tech Final Year Project Report
B. Tech Final Year Project Report
BACHELOR OF TECHNOLOGY
in
CIVIL ENGINEERING DEPARTMENT
by
B. KUMAR
(Reg. No.: 2014701001)
Under Supervision of
Mr. XYZ, ASSISSTANT PROFESSOR
Government Engineering College Aurangabad
CERTIFICATE
This is to certify that the “B. Tech Final Year Project Report” has been submitted by B. KUMAR
(Reg. No.: 2014701001), related to work done by him during Seventh Semester as per BIHAR
ENGINEERING UNIVERSITY Curriculum of his Bachelor of Technology Course, during 2022 –
2023 academic year, in partial fulfillment of the requirements for the award of the degree of
BACHELOR OF TECHNOLOGY in CIVIL ENGINEERING.
iii
ACKNOWLEDGEMENT
First I would like to thank my Project Guide Mr.XYZ, Asst. Professor, Dept. of
Civil Engineering, GEC Aurangabad for providing guidance in all the possible ways.
I also would like all the people that worked along with me in this project with
their patience and openness they created an enjoyable working environment.
It is indeed with a great sense of pleasure and immense sense of gratitude that I
acknowledge the help of these individuals.
I am highly indebted to HOD Prof. RAKESH KUMAR SINHA and all the
faculties, for the facilities provided to accomplish this internship.
I would like to thank all Civil Engineering Department faculties for their
constructive criticism throughout my internship.
I am extremely great full to my department staff members and friends who helped
me in successful completion of this internship.
B KUMAR
(20101147001)
iv
ABSTRACT
v
INDEX
1.1 Sub-introduction...............................................................................................2
2. Literature Review.....................................................................................................3
3. Theory......................................................................................................................4
4. Training Equipment..................................................................................................5
5. Training Activities…..................................................................................................10
6. Screenshots...................................................................................................................11
7. Conclusion....................................................................................................................16
8. Bibilography..................................................................................................................17
vi
vii
1.INTRODUCTION
1
2. CHAPTER
2
3. CHAPTER
3
4. CHAPTER
4.1
4
5. CHAPTER
5
6.SCREENSHOTS
6
7.CONCLUSION
7
8.BIBLOGRAPHY
The following books are referred during the analysis and execution phase of the project
1. MS SHETTY
2.
WEBLINKS:
1. SUBRAMANYAM