A school with a mezzanine area is to be built at the site shown in the attached contour plan
(Figure 1). The school is a ground floor + mezzanine. The ground floor level will be
constructed at a level of +3.5 m. The column plan is shown in Figure 2. The column loads
and dimensions are shown in Table 1. The structural design has the following performance
criteria:
1- Maximum settlement = 25 mm
2- Maximum differential settlement along axis B-B’ is 5 mm.
Five exploratory borings have been drilled to a depth of 20.0 m. in order to determine the
subsurface conditions. The boreholes are attached showing the results of the field
investigation conducted (SPT, etc). Based on the above, the following to be completed:
1. Develop cross-section along axes B-B to indicate the soil profiles beneath the
proposed building after completing the filling process. The profiles should include
the existing and proposed grades, the proposed building, strata boundaries and the
groundwater table. Do not use an exaggerated vertical scale.
2. Propose appropriate foundation level.
3. Calculate bearing capacity.
4. Calculate maximum settlement.
5. Calculate Maximum Differential settlement.
6. Design the foundations for this factory.
7. Draw the Foundation plan
8. Draw Reinforcement Details
Table 1 Column loads and dimensions.
column LL (kN) DL (kN) Dimensions (mm)
C1 180 320 300 x 300
C2 340 520 300x500
C3 400 600 300x500
C4 300 500 300x350
C5 500 750 300x700
C6 350 500 300x400
BH4
BH1
2.4 m
14m
BH2
BH3
1.6 m
1.9 m
BH5
1.8 m
2.1 m
24 m
C6 C5 C5 14 m
B B
’
C4 C3 C3 C2 C1
C C
6 6 6 6 ’
m m m
5 4 3 2 1