P17 7XF02NAA Transformer Main 2 Protection Panel
P17 7XF02NAA Transformer Main 2 Protection Panel
C C
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
COVER SHEET
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F APPROVED: DATE: F
TABLE OF CONTENTS : =D01+R01/01 - =D01+R01/27
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F APPROVED: DATE: F
TABLE OF CONTENTS : =D01+R01/28 - =D01+R01/54
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
TABLE OF CONTENTS : =D01+R01/55 - =D01+R01/75
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
C C
Heater Circuit breaker
Coverter Capacitor
Conductor Line
Fiber optical port
Transmission
Test block
E Button E
Cut-in type FOR APPROVAL
OWNER:
Change over contact break NATIONAL GRID CORPORATION OF THE PHILLIPPINES
Test terminal NGCP Building, Power Center Complex,
before make Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
LEGEND
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
F APPROVED: DATE: F
FUNCTION NUMBER DESCRIPTION
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
- A NN - A NN - A NN N
Counting NO.
Bay serial NO. Panel serial NO. Founction code
21 distance relay
B >=400kV Q
Measuring panel 51 overcurrent relay
87 differential relay
B 86 lockout relay B
D >=220kV R
Protection panel ......
E >=110kV S
Local control panel
C J >=22kV X C
Interface panel
K >=10kV Y
Communication Panel
N >=1kV DR
Recording panel
D D
Mark Colour of wire Mark Colour of wire
: BR Brown
: GY Grey
F APPROVED: DATE: F
GENERAL DESIGNATION
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
7-01DS03NAA
M
OLD TOSHIBA
1000/900/800/600/500/400/300/200/100: 5A
4 NEW CT: CORE 1-2: METER 0.6B2.0
3 3000/2000/1000/800/500: 5A
7-01CT03NAA 2 CORE 1: METER 0.2 5VA CORE 3-4: RELAY C400
1 CORE 2-4: 5P20 200VA
M
NEW CT:
7-01DS05NAA 3000/2000/1000/800/500: 5A
B CORE 1: METER 0.2 5VA B
CORE 2-4: 5P20 200VA
7-01DS23NAA M
69kV CT SPECIFICATIONS:
ABB
7-01CT23NAA 3
1000/900/800/600/500/400/300/200/100: 5A
2
1 CORE 1: METER 0.3B2.0 5CT03(7XF01NAA)
CORE 2-3: RELAY C400 600/500/450/400/300/250/200/150/100:5A
7-01CB24NAA
CORE 1-2: C400
1 CORE 3-4: 0.6B2.0
7-01CT25NAA 2 ABB
3 1000/900/800/600/500/400/300/200/100: 5A
CORE 1: METER 0.3B2.0
CORE 2-3: RELAY C400 5CT03(7XF02NAA)
1200/800/500/300:5A
CORE 1: CL0.2, 60VA
CORE 2-3: 5P20, 60VA
7SA(7XF02NAA)
CT05(5LI1NAA-SRW)NAA
C 1
2000/1500/1000/500:5A C
7PD(7XF02NAA) 2
3
CORE 1-3: 5P20, 100VA
CORE 4: 0.2, 22.5VA
CT05(5LI1NAA-xxx)NAA, CT05(5LI1NAA-MLS)NAA
600/500/450/400/300/250/200/150/100:5A
CORE 1-2: C400
CORE 3-4: 0.6B2.0
800:5A M2Z-XP(7XF02NAA)
XLPE Cable CT
87T 50/51 50/51N
7XF02NAA 1200:5A CT
50MVA
138/69-13.8kV CT
400:5A
400:5A CT 87N 51G 67
D M 2DS(7XF02NAA) VT D
CT 59F 30 86T
1
BILLING VT 2
1
3 CT
BILLING CT2
MiCOM P645
1
2
3 MiCOM P645 32SF6M0B48M
3
2
1 Buccholz
1 2CB04(7XF02NAA)
w Wdg. Temp
5PD05(7XF02NAA)
2
3 o Oil Temp
5P20 50VA 4
1200:5A 5
Oil level
MCSG
P>Overpressure
5DS05(7XF02NAA) M STATION SERVICE
TRANSFORMER PRS-761
86
CYG PRS-789
E 5CB04(7XF02NAA) FOR APPROVAL E
1
P2
2 OWNER:
5CT03(7XF02NAA)3 5CT03(7XF02NAA) NATIONAL GRID CORPORATION OF THE PHILLIPPINES
4 P1 1200/800/500/300:5A NGCP Building, Power Center Complex,
CORE 1: CL0.2,60VA Quezon Avenue comer BIR Road,Diliman,Quezon City
5DS03(7XF02NAA) M CORE 2-3: 5P20,60VA BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
PROTECTIVE SINGLE LINE DIAGRAM
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
M2Z-XP(7XF02NAA) M2Z-XP(7XF02NAA)
0U 0U
-OF8702T
-OF8701T
-Q8702T
-Q8701T
-OFE01
-OF101
-QE01
-Q101
-OF26
-OF86
-Q26
-Q86
5U 5U -XB871T -XD Panel Note:
1. All labels in the panel shall use english.
-XB872T -XUH87T
-F87T -F87T
MiCOM P645 -B87 -XB261 MiCOM P645 2. The wires to be used for the CT&VT circuit shall be stranded and
-XIH87T color coded for each of the three phase namely:
B 10U 10U -XB262
A-red, B-yellow, C-blue, N-green, Grey-all the other circuit. B
-XIL87T
-F26 -F26 3. The Color Code Dof the Isolator Link is Shown as Follow:
-XB263 -XIT87T
PRS-761A PRS-761A Functional Link( Enable or Disable Functions):Yellow
-B26 Trip Control Isolator Link: Red
-XT1 -XM Spare Isolator Link: Camel
15U 15U
-XT2 -XSR87
-F86 -F86 4. Please add cable trenchs at the both sides of the panel rear.
Dimension of cable duct (minimum of 100mm X 100mm).
PRS-789 -B86 -XT3 PRS-789 -XSF87
2200mm
-XT4 -XSF86
20U 20U
C -XT5 -XA C
-TT01 -XT26 -XTH
FMS30
25U -TT02 25U
Device dimension
FMS30
MiCOM P645 483mm(W)*177mm(H)*240 mm(D)
PRS-761A 482.6mm(W)*177mm(H)*282 mm(D)
F APPROVED: DATE: F
PANEL LAYOUT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
800 800
800
A 615 A
FRONT
800
25.4
150
145
200
228.6 204 14
110
5
1.
R1
204
500
84.5 16
800
500
B B
CABLE GLANDS
PG-21 * 24
POLYCARBONATE GLASS PG-29 * 12
100
33 33 660
2175
1965
2200
2200
194
194
BOTTOM VIEW
REAR
C C
974
974
96
D D
145
FRONT VIEW SIDE VIEW REAR VIEW
F APPROVED: DATE: F
Note :1. Actual boring of holes to the provided removable/detachable TOP VIEW Wang Xiongping 2020.5.6
PANEL OVERVIEW
cable entry plate shall be done onsite in consideration. FRONT REVIEWED: DATE: Project Location: SCALE:
NAGAMIN SUBSTATION
Li Guihao 2020.4.30 1
2. The top panel louvers are provided with wire mesh & exhaust fan. DRAWN: DATE: DRAWING NO: SHEET NO. Rev Ind.:
Yi Zhiyu 2020.4.29 0408(IV) NAA 8125 R 004 10 of 75 V1.03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Wiring description
Phase (CT/VT)Diameter (mm2) Color
A 2.5 RED (RD)
B 2.5 YELLOW (YL)
B B
C 2.5 BLUE (BL)
N 2.5 GREEN (GR)
Others 1.5 GREY (GY)
1. The wire cros-section for CT and VT circuit is 2.5mm2 For other circuit is 1.5mm2.
2. Wiring color for relay panel: CT and VT Phase A: Red (RD) Phase B: Yellow (YL),
Phase C: Blue (BL), Phase N: Green (GR) and all other wiring are Grey (GY)
C C
D D
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
PANEL DETAILS
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
INITIATE 7-01CB24NAA BF
INITIATE 7-01CB04NAA BF
2CB04(7XF02NAA)TRIP COIL
5CB04(7XF02NAA)TRIP COIL 2
DEVICE PROTECTION FUNCTION DEVICE PROTECTION FUNCTION
CB TRIP COIL 1
CB TRIP COIL 2
B B
51G
D D
67
59F
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
TRIP MATRIX
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Serial
Device tag Quantity Designation Model No. Manufacturer Additional remarks
Number
F APPROVED: DATE: F
PARTS LIST
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Serial
Device tag Quantity Designation Model No. Manufacturer Additional remarks
Number
TRIP LV CB
26 -LC2605 1 RSH2.5-2E-BXRD Reliance RED
5CB04(7XF02NAA) COIL 1
TRIP LV CB
27 -LC2606 1 RSH2.5-2E-BXRD Reliance RED
5CB04(7XF02NAA) COIL 2
TRIP CB COIL 1
28 -LC2607 1 RSH2.5-2E-BXRD Reliance RED
SPARE
TRIP CB COIL 2
29 -LC2608 1 RSH2.5-2E-BXRD Reliance RED
B SPARE B
TRIP TV CB
30 -LC2609 1 RSH2.5-2E-BXRD Reliance RED
2CB04(7XF01NAA) COIL
31 -LC2610 1 SPARE RSH2.5-2E-BXRD Reliance RED
TRIP HV CB
32 -LC8701 1 RSH2.5-2E-BXRD Reliance RED
7-01CB24NAA COIL 2
TRIP HV CB
33 -LC8702 1 RSH2.5-2E-BXRD Reliance RED
7-01CB04NAA COIL 2
TRIP LV CB
34 -LC8703 1 RSH2.5-2E-BXRD Reliance RED
5CB04(7XF02NAA) COIL 2
35 -LC8704 1 SPARE RSH2.5-2E-BXRD Reliance RED
C TRIP TV CB C
36 -LC8705 1 RSH2.5-2E-BXRD Reliance RED
2CB04(7XF02NAA) COIL
37 -LK261 1 EBI MAINTENANCE RSH2.5-2E-BXYW Reliance YELLOW
F APPROVED: DATE: F
PARTS LIST
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Serial
Device tag Quantity Designation Model No. Manufacturer Additional remarks
Number
F APPROVED: DATE: F
PARTS LIST
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Serial
Device tag Quantity Designation Model No. Manufacturer Additional remarks
Number
D D
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
PARTS LIST
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Terminals
Terminal strip Terminal strip definition text Total Additional remarks
first last
number
-XA AC POWER 1 11 11
-XB262 = 1 30 30
B B
-XB263 -F26 TRIP RELAY REINITIATION INPUT 1 19 19
-XB872T = 1 16 16
-XD DC POWER 1 10 10
-XM COMMUNICATION 1 6 6
-XT2 = 1 25 25
-XT3 = 1 25 25
-XT4 = 1 6 6
-XT5 = 1 25 25
E FOR APPROVAL E
-XT26 -F26 BINARY OUTPUT 1 29 29
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
-XUH87T -F87T HV VOLTAGE ! 1 13 13 PHOENIX OTTA-6-T/SB-P/P CONTRACTOR: NEW NORTHEAST ELECTRIC GROUP
HIGH VOLTAGE SWITCHGEAR CO., LTD.
F APPROVED: DATE: F
TERMINAL-STRIP OVERVIEW : =D01+R01-XA - =D01+R01-XUH87T
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
A B C D E F G H J
F1 F6
F2 F7
IRIG-B12X
F3 F8
PH6
PH6
PH6
PH6
PH9
PH9
PH9
PH9
PH9
PH9
PH9
PH9
PH9
PH9
F4 F9 SK6
F5 F10
B B
MiCOM ALSTOM
C C
CYG PRS-761A NON-ELECTRICITY PROTECTION Repeat NC CPU NC BI/BO BI/BO BI/BO BI/BO NC NC Power
RUN 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
ON
31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 OFF
F1
D ESC
D
PH16
PH16
PH16
PH16
PH16
PH16
PH16
PH16
PH18
PH18
PH18
PH18
ENTER
F2
PH08
P19-P20 P15 P13-P14 P11-P12 P9-P10 P7-P8 P1-P2
WB771 WB722 WB776 WB776 WB776 WB776 WB762
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
DEVICE MODULE OVERVIEW 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A CYG PRS-789 A
PH16
PH16
PH16
PH16
B P11-P12 P9-P10 P8-P7 P6-P5 P4-P3 P2-P1 B
SPARE SPARE SPARE SPARE WB771F WB771F
C C
D D
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
DEVICE MODULE OVERVIEW 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-F87T DEVICE POWER -F86 DEVICE POWER -F26 DEVICE POWER DC POWER SUPERVISION
DC PANEL
DC125V
DC+
(DC INPUT FROM
B 125V DC SYSTEM EXISTING MDB) B
DC-
XD 1 7 2 8 3 9 4 10
13
-KA1
3 1 3 1 3 1
/36.2:C 14
/37.5:D
-Q8701T -Q86 -Q26 /36.4:F
2PC3-DC I> I> S202M-C6DC I> I> 2PC3-DC I> I> /36.5:F
-F871 DC POWER MCB -F86 DC POWER MCB -F26 DC POWER MCB
C 4 2 4 2 4 2
55.34.9.125.0094+94.74 C
AUXILIARY RELAY
-XB261 1 13
-F26BI+ / 39.1:B
-F26BI- / 39.1:E
-F87TBI+ / 29.1:A
32.1:A 32.1:F -XB261 2 14
-F87TBI- / 29.1:E F86BI+ F86BI-
-XB871T 1 15
D POW(+) POW(-) D
-F87T 02 01 -F26
-J /56.1:A
/53.2:A
POW(+) POW(-)
01 02
U -P7 -P9 -P11 -P13
-P2 01 16 01 16 01 16 01 16
POW(+) POW(-) POW(+) POW(-) POW(+) POW(-) POW(+) POW(-)
U
03
GND
GND
1 GROUND COPPER BAR
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
DC POWER SUPPLY
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
LIGHTING
AC POWER SUPERVISION
230V AC POWER
60Hz
13
-XA 1 4 2 5 3 6
AC 230V L AC 230V L
3 1
-Q101
C 2PC16-AC I> I> C
AC MCB
4 2
AC230V-L AC-L / 22.1:B
1 3
-XA 7 10 9 8 11
D -E01 L L D
/61.2:D 01 02
1 -P1
-SKG
LIMIT SWITCH 2 U
03
GND
L
1
GND
GND
-LAMP
E LED
FOR APPROVAL E
LIGHT 2 L GND L
N OWNER:
PDU NATIONAL GRID CORPORATION OF THE PHILLIPPINES
P111-16X25-6A GND1 NGCP Building, Power Center Complex,
PDU BRIDGING POWER & PROGRESS
Quezon Avenue comer BIR Road,Diliman,Quezon City
F APPROVED: DATE: F
AC POWER SUPPLY 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
AC-L / 21.5:D
B B
-XTH 6
XTH 7 -XTH 8 -XTH 9
C C
XTH 2 3 4 5
FAN1
-M1
L M L
1~
XTH 12 XTH 13 14 10 11
TX204A.230
-THC
D /64.1:C L L
D
TEM./HUM. CONTROLER
13 L L 15
14 16 Heating+ Dehumidiy+ Fan+ L
1 3 5 L
GND
-XTH 15 16
GND HM2
HM1 HG140-250
2 4 6 HG140-250 HEATER 2 L FAN2
U Heating- Dehumidify- Fan- HEATER 1 L
-M2
GND
GND L M L
7 12 31 32 33 34 35 36 37 38
1~
NC NC NC NC NC NC NC NC NC NC
TX204A.230
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
F APPROVED: DATE: F
AC POWER SUPPLY 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Time synchronization
(IRIG-B/1588)
B B
SAS 1 SAS 2 PMS
-XM 1 2 3
GND
SHIELDING LAYER
Shielding cable
-E01 1 3 5 7
/61.2:D
C C
GPS+ GPS-
2 4 6 8
D Ethernet cable D
-F87T
/53.2:A
GPS+ GPS- GND RS485- RS485+ 3 5 7 9 14 13
-B -A -J
1 2 16 17 18
4 6 8 10 15
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
-XM = COMMUNICATION BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
COMMUNICATION CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Time synchronization
(IRIG-B/1588)
B -XM 4 5 6 B
GND
C C
D D
-F26
/56.1:A
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
COMMUNICATION CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
HV VT
7PD(7XF01NAA)
115:66.4 VL-G
CORE 2
A -TT02 A
/65.1:C -P1
Test block
Uha Uhb Un 14 16 18 20
Uhc
13 15 17 19
-XUH87T 1 2 3 4
-P2
14 16 18 20
Ua Ub Uc Un
B B
13 15 17 19
1 3 5 7
-P3
-Q8702T 14 16 18 20
4PC1-AC I> I> I> I>
HV VOLTAGE MCB
2 4 6 8
-XUH87T 10 11 12 13 13 15 17 19
C C
13 15 17 19 13 15 17 19 13 15 17 19
Ua Ub Uc Ua Ub
D D
-F87T
-F87T /53.2:A
6 8 10 6 8 10 12 14
/53.2:A -E -E -E -C -C -C -C -C
2 UHa 4 UHb 2 UHc 4 Uab
-C -E
5 7 9 5 7 9 11 13
1 UHn 3 UHn 1 UHn 3 Uab'
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
Ua Ub Uc Un NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
-XUH87T 5 6 7 BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T HV VOLTAGE CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
7-01CB04NAA 7-01CB24NAA
7-01CT03NAA 7-01CT25NAA HV NEUTRAL POINT CT
1200/1000/900/800/600/ CORE 2: 400:5
3000/2000/1000/800/500:5A
A CORE 4: 5P20 200VA 500/400/300/200/100: 5A A
CORE 3: RELAY C400
Ih1n
Ih1a Ih1b Ih1c Ih2a Ih2b Ih2c
Ih0
-XIH87T 1 2 3 4 -XIH87T 15 16 17 18
-XIH87T 29 31
Ia Ib Ic Ia Ib Ic
B B
I0 I0'
-XIH87T 7 6 5 -XIH87T 21 20 19
C 3 1 7 5 11 9 3 1 7 5 11 9 3 1 7 5 11 9 C
D D
-XIH87T 30
E TR TR E
FOR APPROVAL
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T HV CURRENT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
5CB04(7XF02NAA)
5CT03(7XF02NAA)
COIL 3:
A CORE 2-3: 5P20,60VA A
1200/800/500/300: 5A
Iln
Ila Ilb Ilc
-XIL87T 1 2 3 4
Ia Ib Ic
B B
-XIL87T 7 6 5
-TT02 -P1
/65.1:C
4 2 8 6 12 10
Test block
C C
3 1 7 5 11 9
-F87T -F87T
/53.2:A -E 24 Ia1 26 Ib1 28 Ic1
/53.2:A -E 18 Ia1 20 Ib1 22 Ic1
D D
E TR E
FOR APPROVAL
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T LV CURRENT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
TERTIARY CB CT
2CB04(7XF02NAA)
A A
-XIT87T 1 2 3 8
B Ia Ib Ic In B
-XIT87T 5 6 7
3 1 7 5 11 9 3 1 7 5 11 9
-F87T
/53.2:A
D D
-E 12 Ia1 14 Ib1 16 Ic1
Ia Ib Ic
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T TERTIARY CURRENT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SPARE 7
SPARE 1
SPARE 2
SPARE 3
SPARE 4
SPARE 5
SPARE 6
RESET
TEST
-F87TBI+ / 20.2:D XB871T 2 3 4 5 6 7 8 9 10
-F87TBI+ / 31.1:B
B B
1 1 1 1 1 1 1
C C
-XB872T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
-F87T
/53.2:A -D -F
OPT01 OPTO02 OPTO03 OPTO04 OPTO05 OPTO06 OPTO07 OPTO08 OPTO09 OPTO10 OPTO11 OPTO12 OPTO13 OPTO14 OPTO15 OPTO16
2 4 6 8 10 12 14 16 2 4 6 8 10 12 14 16
D D
OPTO01 COM OPTO02 COM OPTO03 COM OPTO04 COM OPTO05 COM OPTO06 COM OPTO07 COM OPTO08 COM OPTO09 COM OPTO10 COM OPTO11 COM OPTO12 COM OPTO13 COM OPTO14 COM OPTO15 COM OPTO16 COM
1 3 5 7 9 11 13 15 1 3 5 7 9 11 13 15
17 18
17 18
F APPROVED: DATE: F
F87T BINARY INPUT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
5CB04(7XF02NAA)
2CB04(7XF02NAA)
7-01CB24NAA
7-01CB04NAA
TO HV CB
TO HV CB
TO LV CB
A A
TO TV CB
SPARE
TRIP CB COIL 2
TRIP CB COIL 2
TRIP CB COIL 2
HV SIDE CBF
TRIP CB COIL
INITIATE
HV TIE CBF
INITIATE
SPARE
SPARE
SPARE
SPARE
B B
C C
-F87T
/53.2:A
-H -H -G -G -G -G -G -G
7 9 11 14 13 17 1 3 5 7 9 11 14 13
RL4 RL5 RL6 RL7 RL8 RL9 RL10 RL11 RL12 RL13 RL14 RL15
8 10 12 15 16 18 2 4 6 8 10 12 15 16
2
2
2 2 2
2 2 2
2 2
-LC8703 -LC8705
D -LC8701 -LS8702 -LS8703 -LC8704 -LS8704 -LS8705 D
-LS8701 -LC8702 RSH2.5-2E-BXRD
RSH2.5-2E-BXRD 1
RSH2.5-2E-BXRD RSH2.5-2E-BXRD 1 RSH2.5-2E-BXRD
RSH2.5-2E-BXRD 1 RSH2.5-2E-BXRD RSH2.5-2E-BXRD 1 RED 1 RSH2.5-2E-BXRD 1
RSH2.5-2E-BXRD 1 RED 1
RED 1 1 RED TRIP LV CB RED RED RED RED
RED RED INITIATE HV CB SPARE TRIP TV CB SPARE
TRIP HV CB INITIATE HV CB TRIP HV CB 5CB04(7XF02NAA) COIL 2 SPARE SPARE
7-01CB24NAA COIL 2 7-01CB04NAA BFR RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD
7-01CB24NAA BFR 7-01CB04NAA COIL 2 2CB04(7XF02NAA) COIL
RSH2.5-2E-BXRD RSH2.5-2E-BXRD
RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD
-XT1 = -F87T BINARY OUTPUT -XT2 = -F87T BINARY OUTPUT -XT3 = -F87T BINARY OUTPUT NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T BINARY OUTPUT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Relay Fail
B B
-XB871T 11 12
-F87TBI+ / 29.8:A
C C
-F87T
/53.2:A -J -B
11 13
WD
12 16
D D
13
-K871
/36.2:D 14
/37.5:C
/31.6:F
/31.6:F
E FOR APPROVAL E
OWNER:
-XB871T 25 26 NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
-F87TBI- / 29.8:E BRIDGING POWER & PROGRESS
Quezon Avenue comer BIR Road,Diliman,Quezon City
F APPROVED: DATE: F
AUXILIARY RELAY FOR SIGNAL CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
INITIATE LOCKOUT
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
A A
CB CLOSING
TO BLOCK
RESET
-F86BI+ / 33.1:B
-XT1 6
-F86BI+ / 20.4:D
-XT1 18 21
LOCKOUT HV CB- LOCKOUT HV CB+
7-01CB24NAA
-XT2 7 -XT1 7 8 9
-F87T-H
45.2:B
TRIP1+ 1 1
B 33.2:B
RL1 OPEN
113 RESET1+ B
-LC861
BCU
33.2:B
33.2:B RL1
RSH2.5-2E-BXRD
114 2
TRIP1- -B86 RED
2 RL1 COM /34.2:B RESET1- TRIP BAY 01
/35.2:B 33.2:B
7-01CB24NAA
-XT2 11
45.2:E
-XT1 11 13 14
-XT1 12
C C
-F86
-F86
/60.1:A
-P2 /60.1:A -P2 1ZJ1-2+ 1ZJ2-2+ 1ZJ1-1+ 1ZJ2-1+ 1ZJ3-1+
03 07 01 05 09
15 13 14
Set B
Set A
Reset
D 1ZJ1 1ZJ3 D
1ZJ2 04 08 02 06 10
1ZJ1-2- 1ZJ2-2- 1ZJ1-1- 1ZJ2-1- 1ZJ3-1-
16
DC-
-XT1 19 23 24 25
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F86 LOCKOUT CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
INITIATE LOCKOUT
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
A A
CB CLOSING
TO BLOCK
RESET
7-01CB04NAA
LOCKOUT HV CB+
45.3:B
-XT2 8 9 10
7-01CB04NAA
1
TRIP1+ RESET1+
B 32.1:B -LC862 B
BCU
32.3:B
RSH2.5-2E-BXRD
32.1:B 2
45.3:E
RED
TRIP1- RESET1- TRIP BAY 02
32.3:B
-XT2 12 13 14
-F86 -F86
/60.1:A -P1 /60.1:A -P1 2ZJ1-2+ 2ZJ2-2+ 2ZJ1-1+ 2ZJ2-1+ 2ZJ3-1+
03 07 01 05 09
15 13 14
Set D
Set C
Reset
C C
2ZJ1 2ZJ3
2ZJ2 04 08 02 06 10
2ZJ1-2- 2ZJ2-2- 2ZJ1-1- 2ZJ2-1- 2ZJ3-1-
D D
16
DC-
-XT2 19 23 24 25
F APPROVED: DATE: F
F86 LOCKOUT CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
INITIATE LOCKOUT
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
A A
CB CLOSING
TO BLOCK
RESET
-F86BI+ / 33.3:B -F86BI+ / 35.1:B
-XT3 6
5CB04(7XF02NAA)5CB04(7XF02NAA)
LOCKOUT LV CB- LOCKOUT LV CB+
-XT3 7 8 9
-XT3 17 21
45.5:B
-F87T-H
3 RL1 OPEN
123 RESET2+ 1
B B
BCU
RL2 124 -LC863
-B86 RSH2.5-2E-BXRD
/32.2:B RESET2- RED
2
4 RL1 COM
Reset button TRIP BAY 03
45.5:E
-XT3 11
-XT3 12 13 14
-F86 -F86
C
/60.1:A -P4 /60.1:A -P4 1ZJ1-2+ 1ZJ2-2+ 1ZJ1-1+ 1ZJ2-1+ 1ZJ3-1+ C
03 07 01 05 09
15 13 Set B
14
Set A
Reset
1ZJ1 1ZJ3
D 1ZJ2 D
04 08 02 06 10
1ZJ1-2- 1ZJ2-2- 1ZJ1-1- 1ZJ2-1- 1ZJ3-1-
16
DC-
-XT3 19 23 24 25
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
-F86BI- / 33.3:E -F86BI- / 35.1:E BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F86 LOCKOUT CIRCUIT 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
INITIATE LOCKOUT
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
A A
CB CLOSING
TO BLOCK
RESET
-F86BI+ / 34.3:A -F86BI+ /
-XT5 6
-XT5 18 21
2CB04(7XF02NAA)
LOCKOUT TV CB+
-XT5 7 8 9
2CB04(7XF02NAA)
-F87T-H
LOCKOUT TV CB-
BCU
-B86 1
45.8:E
RL3
B 214 B
/32.2:B -LC865
Reset button RSH2.5-2E-BXRD
6 RL1 COM 2
RED
-XT5 11 TRIP BAY 05
-XT5 12 13 14
-F86 -F86
/60.1:A -P3 /60.1:A -P3 2ZJ1-2+ 2ZJ2-2+ 2ZJ1-1+ 2ZJ2-1+ 2ZJ3-1+
03 07 01 05 09
15 13 14
Set D
Set C
Reset
C C
2ZJ1 2ZJ3
2ZJ2 04 08 02 06 10
2ZJ1-2- 2ZJ2-2- 2ZJ1-1- 2ZJ2-1- 2ZJ3-1-
D D
16
DC-
-XT5 19 23 24 25
RSH2.5-2E-BXRD 2
RSH2.5-2E-BXRD 2 CONTRACTOR: NEW NORTHEAST ELECTRIC GROUP
RED RED HIGH VOLTAGE SWITCHGEAR CO., LTD.
TRIP BAY 04 TRIP BAY 06
(SPARE) (SPARE) PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
& MINDANAO SUBSTATION UPGRADING PROJECT,
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) P17 7XF02NAA Transformer Main 2 Protection Panel
F APPROVED: DATE: F
F86 LOCKOUT CIRCUIT 4
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
VT Fail (primary)
-F87T MCB OFF
AC MCB OFF
DC Fail
AC Fail
B B
XSR87 3 4 5 6 7 8
C -XSR87 2 C
2
1 5 11 11 11
-LP01 -KA1 -OF8701T -OF86 -OF101
RSH2.5-2E-BXRD 1 /20.6:C /37.6:D 12 /37.7:D 12 /37.7:D 12
RED 9
SAS SIGNAL
RSH2.5-2E-BXRD 1 5 1 5 11 11 11
-K871 -KA2 -OF8702T -OF26 -OFE01
/31.1:D /21.7:B /37.6:C 12 /37.7:D 12 /37.8:D 12
9 9
-XSR87 1
D D
XSR87 10 11 12 13 14 15 16 17 18
SCADA+
E
SAS E
FOR APPROVAL
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T SIGNAL CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Secondary Overcurrent
Primary Overcurrent
VT Fail (primary)
Differential Trip
DC Fail
AC Fail
B B
XSF / 38.1:B
XSF87 3 4 5 6 7 8 9 10 11 12
C -K871 C
2 6 /31.1:D 2 6 -KA2 21
/21.7:B -OF8702T
-XSF87 2 10 10 /36.3:D 22
-F87T
/53.2:A
-G -B -B -B -B -B -B -B -B 21 21 21
2 3
17 1 5 7 9 11 14 17 -OF26 -OF101 -OFE01
-LP02 RL18
/36.4:D 22 /36.4:C 22 /36.5:D 22
RSH2.5-2E-BXRD 1
RL16 RL17 RL19 RL20 RL21 RL22 RL23 RL24
RED 2 6 -KA1 21
21
SAS SIGNAL 4 /20.6:C -OF8701T
RSH2.5-2E-BXRD
18 2 6 8 10 12 15 18 /36.3:C 22 -OF86
10 /36.3:C 22
D -XSF87 1 D
XSF87 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ER+
NDME
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T SIGNAL CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Healthy indicator
Healthy indicator
Healthy indicator
Healthy indicator
XSF / 37.8:C
B B
-XSF86 1 2 3 4 5 6
-F86
/60.1:A -P2 11
1ZJ3-2+ -P1 11
2ZJ3-2+ -P4 11
1ZJ3-2+ -P3 11
2ZJ3-2+
C C
12 12 12 12
1ZJ3-2- 2ZJ3-2- 1ZJ3-2- 2ZJ3-2-
D D
-XSF86 8 9 10 11 12 13
EVENT RECORDER
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
-XSF86 = -F86 SIGNAL TERMINAL PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
& MINDANAO SUBSTATION UPGRADING PROJECT,
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) P17 7XF02NAA Transformer Main 2 Protection Panel
F APPROVED: DATE: F
F86 SIGNAL CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EBI maintenance
A A
RESET
BI01
BI02
BI03
BI06
BI07
BI08
-F26BI+ / 20.5:C -F26BI+ / 43.1:B
-XB261 3 4 5
B B
-XB262 1
40.1:B
-F26NEI+
1
23
-B26 -LK261
LA130-22D-10-G RSH2.5-2E-BXYW
RESET BUTTON 24 2
YELLOW
EBI MAINTENANCE
C C
-F26
/56.1:A -P1 -P2
03 07 09 10 11 12 13 14 15
-F26
/56.1:A
-P1 -P2
KI01+ KI02+ KI03+ RESET / 40.4:E KI05+ KI06+ KI07+ KI08+ KI09+ KI10+ KI11+ KI12+ KI13+
09 10 11 KI04+ 13 14 15 16 04 05 06 07 08
12
D D
-P2
16
KI_COM
F APPROVED: DATE: F
F26 BINARY INPUT CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
C C
-XB262 11 12 13 14 15
-F26 -P7
/56.1:A
03 04 05 06 07
MR11 MR12 MR15
MR13 MR14
D D
R R R R R
39.3:D
J31 J32 J33 J34 J35
RESET
41.1:E
E F26BI- FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 BINARY INPUT CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MR20
MR22
MR23
MR24
MR25
MR21
-F26NEI+ / 40.8:B
-XB262 5 6 7 8
-F26NEI+ / 42.1:B
B B
-XB262
16 17 18 19 20 21 22 23 24 25
C C
-F26
/56.1:A
-P9 -P11
03 04 05 06 07 03 04 05 06 07
MR16 MR17 MR20 MR21 MR22
MR18 MR19 MR23 MR24 MR25
R R R R R R R R R R
D D
CJ41 C42 CJ43 CJ44 CJ45 CJ51 CJ52 CJ53 CJ54 CJ55
41.8:D 41.4:D
J41 J42 J43 J44 J45 J51 J52 J53 J54 J55
RESET RESET
XJ51
XJ41 XJ42 XJ43 XJ44 XJ45 XJ52 XJ53 XJ54 XJ55
40.2:E 42.1:E
F26BI- F26BI-
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 BINARY INPUT CIRCUIT 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
MR26
MR27
MR28
MR29
MR30
-F26NEI+ / 41.8:B
B -XB262 9 B
-F26NEI+ /
C C
-XB262
26 27 28 29 30
-F26
/56.1:A
-P13
03 04 05 06 07
MR26 MR27 MR30
MR28 MR29
D D
R R R R R
F APPROVED: DATE: F
F26 BINARY INPUT CIRCUIT 4
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MR11
MR12
MR13
MR14
MR15
MR20
MR21
MR22
MR23
MR24
MR25
B B
CJ31 CJ32 CJ33 CJ34 CJ35 CJ41 CJ42 CJ43 CJ44 CJ45 CJ51 CJ52 CJ53 CJ54 CJ55
10 11 12 13 14 10 11 12 13 14 10 11 12 13 14
-XB263 1 2 3 4 5 6 7 8 9 10
2 2 2 2
D D
-LK2601 -LK2602 -LK2603 -LK2604
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
YELLOW YELLOW YELLOW YELLOW
BUCCHOLZ MAIN TANK TRIP BUCCHOLZ OLTC TRIP WINDING TEMPERATURE TRIP OIL TEMPERATURE TRIP
E FOR APPROVAL E
-F26RI+ / 44.1:E
XB263 13 14 15 16 OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
XB263 XB263 XB263 NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
-XB263 = -F26 TRIP RELAY REINITIATION INPUT PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
& MINDANAO SUBSTATION UPGRADING PROJECT,
2 2 2 2 2 2 STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
-LK2605 -LK2606 -LK2607 -LK2608 -LK2609 -LK2610 CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW 1
RSH2.5-2E-BXYW Sp19.MSRP1.Mt-0408(IV) P17 7XF02NAA Transformer Main 2 Protection Panel
YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW
F SPARE SPARE SPARE SPARE SPARE SPARE APPROVED: DATE: F
F26 TRIP RELAY REINITIATION CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
MR26
MR27
MR28
MR29
MR30
B B
-F26BI+ / 43.8:B -F26BI+ /
10
XB261
-F26 -P13
/56.1:A
Com
09 02 08 15
C C
CJ61 CJ62 CJ63 CJ64 CJ65
10 11 12 13 14
D D
E 17 FOR APPROVAL E
XB263 OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
-F26RI+ / 43.6:E -F26RI+ / 45.1:C NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 TRIP RELAY REINITIATION CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
TRIP HV CB COIL 2
TRIP HV CB COIL 1
TRIP HV CB COIL 2
TRIP LV CB COIL 1
TRIP LV CB COIL 2
5CB04(7XF02NAA)
5CB04(7XF02NAA)
2CB04(7XF02NAA)
TRIP TV CB COIL
7-01CB24NAA
7-01CB24NAA
7-01CB04NAA
7-01CB04NAA
Trip COIL 1
Trip COIL 2
SPARE
SPARE
B B
-F26RI+ / 44.5:E18 19
-XB263
XT26 1 2 3 4 5 6 7 8 9 10 11 12 13 14
-F26
C /56.1:A C
ACJ BCJ 01 03 05 07 09 11 13 01 03 05 07 09 11 13
R R 02 04 06 08 10 12 14 02 04 06 08 10 12 14
ACJ1-2 ACJ2-2 ACJ3-2 ACJ4-2 ACJ5-2 ACJ6-2 ACJ7-2 BCJ1-2 BCJ2-2 BCJ3-2 BCJ4-2 BCJ5-2 BCJ6-2 BCJ7-2
16 16
Com A Com B
D D
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
-LC2601 -LC2602 -LC2603 -LC2604 -LC2605 -LC2606 -LC2607 -LC2608 -LC2609
RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD RSH2.5-2E-BXRD
RED RED RED RED RED RED RED RED RED
TRIP HV CB TRIP HV CB TRIP HV CB TRIP HV CB TRIP LV CB TRIP LV CB TRIP CB COIL 1 TRIP CB COIL 2 TRIP TV CB
7-01CB24NAA COIL 1 7-01CB24NAA COIL 2 7-01CB04NAA COIL 1 7-01CB04NAA COIL 2 5CB04(7XF02NAA) COIL 1 5CB04(7XF02NAA) COIL 2 SPARE SPARE 2CB04(7XF01NAA) COIL
XT26 16 17 18 19 20 21 22 23 24 25 26 27 28 29
XB261 19 20 2CB04(7XF02NAA)
SPARE LOCKOUT TV CB-
F26BI- / 39.6:E F26BI- / LOCKOUT LV CB+
35.1:B
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
7-01CB24NAA 7-01CB04NAA 5CB04(7XF02NAA) Quezon Avenue comer BIR Road,Diliman,Quezon City
2 BRIDGING POWER & PROGRESS
LOCKOUT HV CB- LOCKOUT HV CB- LOCKOUT LV CB-
32.1:B 33.1:B 34.1:B CONTRACTOR: NEW NORTHEAST ELECTRIC GROUP
HIGH VOLTAGE SWITCHGEAR CO., LTD.
1
-XT26 = -F26 -LC2610
BINARY OUTPUT PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
RSH2.5-2E-BXRD STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
RED & MINDANAO SUBSTATION UPGRADING PROJECT,
SPARE STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) P17 7XF02NAA Transformer Main 2 Protection Panel
F APPROVED: DATE: F
F26 BINARY OUTPUT CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MR20
MR21
MR22
MR23
MR24
MR25
-XSA26 3 4 5
XSA26+ / 47.2:B
B B
2 XJ11 XJ12 XJ13 XJ14 XJ15 XJ41 XJ42 XJ43 XJ44 XJ45 XJ71 XJ72 XJ73 XJ74 XJ75
-LP03
02 03 04 05 06 02 03 04 05 06 02 03 04 05 06
RSH2.5-2E-BXRD 1
RED
F26 SIGNAL
RSH2.5-2E-BXRD
C C
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 CENTRAL SIGNAL CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Run abnormal
Selfcheck
MR26
MR27
MR28
MR29
MR30
XSA26+ / 46.7:B
-XSA26 6 7 8
B B
-F26
/56.1:A -P14 -P1
Com Com 1
01 01
02 03 04 05 06 02 04
C C
-XSA26 25 26 27 28 29 30 31
D D
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 CENTRAL SIGNAL CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MR20
MR21
MR22
MR23
MR24
MR25
-XSR26 1 2 -XSR26 3
XSR26+ / 49.2:B
B B
-F26 -P8 -P10 -P12
/56.1:A
Com Com
Com
07 07 07
J31 J32 J33 J34 J35 J41 J42 J43 J44 J45 J51 J52 J53 J54 J55
08 09 10 11 12
08 09 10 11 12 08 09 10 11 12
C C
D D
SCADA
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 REMOTE SIGNAL CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Run abnormal
Selfcheck
MR26
MR27
MR28
MR29
MR30
XSR26+ / 48.7:B
-XSR26 4 5 6
B B
08 09 10 11 12 06 08
C C
-XSR26 23 24 25 26 27 28 29
D D
SCADA
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 REMOTE SIGNAL CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MR20
MR21
MR22
MR23
MR24
MR25
-XSF26 3 4 5
XSF26+ / 51.2:B
B B
J31 J32 J33 J34 J35 J41 J42 J43 J44 J45 J51 J52 J53 J54 J55
2
14 15 16 17 18 14 15 16 17 18 14 15 16 17 18
-LP04
RSH2.5-2E-BXRD 1
RED
F26 SIGNAL
RSH2.5-2E-BXRD
C C
EVENT RECORDER
E FOR APPROVAL E
1 1 1 1 1
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
-LP05 -LP06 -LP07 -LP08 -LP09 NGCP Building, Power Center Complex,
RSH2.5-2E-CC 2
RSH2.5-2E-CC 2
RSH2.5-2E-CC 2
RSH2.5-2E-CC 2
RSH2.5-2E-CC 2 Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
CAMEL CAMEL CAMEL CAMEL CAMEL
SPARE SPARE SPARE SPARE SPARE CONTRACTOR: NEW NORTHEAST ELECTRIC GROUP
HIGH VOLTAGE SWITCHGEAR CO., LTD.
F APPROVED: DATE: F
F26 RECORDING SIGNAL CIRCUIT 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
MR26
MR27
MR28
MR29
MR30
XSF26+ / 50.7:B
-XSF26 6 7
B B
-F26 -P14
/56.1:A
Com
13
14 15 16 17 18
C C
D D
-XSF26 25 26 27 28 29
EVENT RECORDER
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 RECORDING SIGNAL CIRCUIT 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
-XTH 27 28 29
-SS1
Sensor 1
C C
-THC
/64.1:C
TEM./HUM. CONTROLER 5V+ DATA SCK GND 5V+ DATA SCK GND T+ T- H+ H- 485B 485A
Break Over OFF
9 10 11 17 18 19 20 21 22 23 24 25 26 27 28 29 30
D D
8
COM
E -XTH 24-XTH 25
FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
TEM./HUM. CONTROLER CIRCUIT
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F87T
/20.2:D
/23.1:D =D01+R01-F87T-A =D01+R01-F87T-B =D01+R01-F87T-C
A /25.2:D A
/25.5:D & BR GPS+ 1 /23.3:B 1 /37.2:C
2.5 RD UHn 1 /25.2:E
/26.1:D -XM:1 -XSF87:4 -XUH87T:5
/26.4:D 2 /23.3:B 2 /37.2:E 2 /25.2:C
/26.6:D & BL GPS- -XM:2 -XSF87:15
2.5 RD UHa -TT01-P1:13
/27.1:D
/27.4:D 3 /37.3:C 3 /25.3:E
-XSF87:5
2.5 YL UHn -XUH87T:6
/28.1:D
/29.1:D 4 /37.2:E
2.5 YL UHb 4 /25.3:C
/30.1:C -XSF87:16 -TT01-P1:15
/31.1:C 5 /37.3:C 5
/37.1:C -XSF87:5
/54.1:A
/55.1:A 6 /37.3:E 6
-XSF87:17
7 /37.3:C 7
MiCOM P645 -XSF87:6
TR PROTECTION RELAY 8 /37.3:E 8
B -XSF87:18 B
9 /37.3:C 9
-XSF87:6
10 /37.3:E 10
-XSF87:19
11 /37.4:C 11
-XSF87:7
12 /37.4:E 12
-XSF87:20
13 13
14 /37.4:C 14
-XSF87:7
15 /37.4:E 15 /26.6:E
-XSF87:21
2.5 GR In -XIH87T:30
16 16 /26.6:C
C 2.5 GR IL -TT01-P3:3 C
17 17 /26.4:D
2.5 RD Ia1' -XIH87T:23
18 18 /26.4:C
2.5 RD Ia1 -TT01-P2:3
19 /26.4:D
2.5 YL Ib1' -XIH87T:24
20 /26.4:C
2.5 YL Ib1 -TT01-P2:7
21 /26.5:D
2.5 BL Ic1' -XIH87T:25
22 /26.5:C
2.5 BL Ic1 -TT01-P2:11
23 /26.2:D
2.5 RD Ia1' -XIH87T:9
24 /26.2:C
D 2.5 RD Ia1 -TT01-P1:3 D
25 /26.2:D
2.5 YL Ib1' -XIH87T:10
26 /26.2:C
2.5 YL Ib1 -TT01-P1:7
Notes Device shell must be connected with earth bar reliably
27 /26.3:D
2.5 BL Ic1' -XIH87T:11
28 /26.3:C
2.5 BL Ic1 -TT01-P1:11
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T DEVICE WIRING DIAGRAM 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F87T
/53.2:A =D01+R01-F87T-D =D01+R01-F87T-E =D01+R01-F87T-F
P645
A 1 /29.1:E 1 /25.3:E 1 /29.5:E A
OPTO01 COM -XB871T:17
2.5 BL UHn -XUH87T:7
OPTO09 COM -XB871T:21
2 /29.1:C 2 /25.3:C 2 /29.5:C
OPT01 -XB872T:1
2.5 BL UHc -TT01-P1:17
OPTO09 -XB872T:9
3 /29.1:E 3 /25.5:C 3 /29.5:E
OPTO02 COM -XB871T:17
2.5 YL Uab' -TT01-P2:15
OPTO10 COM -XB871T:21
4 /29.1:C 4 /25.4:C 4 /29.5:C
OPTO02 -XB872T:2
2.5 RD Uab -TT01-P2:13
OPTO10 -XB872T:10
5 /29.2:E 5 5 /29.6:E
OPTO03 COM -XB871T:18
OPTO11 COM -XB871T:22
6 /29.2:C 6 6 /29.6:C
OPTO03 -XB872T:3
OPTO11 -XB872T:11
7 /29.2:E 7 7 /29.6:E
OPTO04 COM -XB871T:18
OPTO12 COM -XB871T:22
B 8 /29.2:C 8 8 /29.6:C B
OPTO04 -XB872T:4
OPTO12 -XB872T:12
9 /29.3:E 9 9 /29.7:E
OPTO05 COM -XB871T:19
OPTO13 COM -XB871T:23
10 /29.3:C 10 10 /29.7:C
OPTO05 -XB872T:5
OPTO13 -XB872T:13
11 /29.3:E 11 /28.2:C 11 /29.7:E
OPTO06 COM -XB871T:19
2.5 RD Ia1' -TT02-P2:1
OPTO14 COM -XB871T:23
12 /29.3:C 12 /28.2:C 12 /29.7:C
OPTO06 -XB872T:6
2.5 RD Ia1 -TT02-P2:3
OPTO14 -XB872T:14
13 /29.4:E 13 /28.2:C 13 /29.8:E
OPTO07 COM -XB871T:20
2.5 YL Ib1' -TT02-P2:5
OPTO15 COM -XB871T:24
14 /29.4:C 14 /28.2:C 14 /29.7:C
OPTO07 -XB872T:7
2.5 YL Ib1 -TT02-P2:7
OPTO15 -XB872T:15
C 15 /29.4:E 15 /28.3:C 15 /29.8:E
C
OPTO08 COM -XB871T:20
2.5 BL Ic1' -TT02-P2:9
OPTO16 COM -XB871T:24
16 /29.4:C 16 /28.3:C 16 /29.8:C
OPTO08 -XB872T:8
2.5 BL Ic1 -TT02-P2:11
OPTO16 -XB872T:16
17 17 17
Ia1'
18 18 18
Ia1
19
Ib1'
20
Ib1
21
Ic1'
D Ic1 22 D
23 /27.2:D
2.5 RD Ia1' -XIL87T:9
24 /27.2:C
2.5 RD Ia1 -TT02-P1:3
25 /27.2:D
2.5 YL Ib1' -XIL87T:10
26 /27.2:C
2.5 YL Ib1 -TT02-P1:7
27 /27.3:D
2.5 BL Ic1' -XIL87T:11
28 /27.3:C
2.5 BL Ic1 -TT02-P1:11
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F87T DEVICE WIRING DIAGRAM 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F87T
/53.2:A =D01+R01-F87T-G =D01+R01-F87T-H =D01+R01-F87T-J
MICOM P645
A 1 /30.5:B 1 /32.2:B 01 /20.2:D A
-XT3:2
RL1 OPEN -XT1:7
1.5 GY POW(-) -XB871T:15
2 /30.5:D 2 /32.2:B 02 /20.2:D
-LS8703:2
RL1 COM -XT1:11
1.5 GY POW(+) -XB871T:1
3 /30.5:B 3 /34.2:B 3
-XT4:1
RL1 OPEN -XT3:7
4 /30.5:D 4 /34.2:B 4
-LC8704:2
RL1 COM -XT3:11
5 /30.6:B 5 /35.2:B 5
-XT4:2
RL1 OPEN -XT5:7
6 /30.6:D 6 /35.2:B 6
-LS8704:2
RL1 COM -XT5:11
7 /30.6:B 7 /30.1:B 7
-XT5:1 -XT1:1
B 8 /30.6:D 8 /30.1:D 8 B
-LC8705:2 -LC8701:2
9 /30.7:B 9 /30.2:B 9
-XT5:2 -XT1:2
10 /30.7:D 10 /30.2:D 10
-LS8705:2 -LS8701:2
11 11 /30.3:B 11 /31.1:B
-XT2:1 -XB871T:11
12 12 /30.3:D 12 /31.1:D
-LC8702:2 -K871:13
13 13 13
14 14 /30.3:B 14
-XT2:2
C 15 15 /30.3:D 15
C
-LS8702:2
16 16 16
GND
17 /37.2:C 17 /30.4:B 17
-XSF87:3 -XT3:1
RS485-
18 /37.2:E 18 /30.4:D 18
-XSF87:14 -LC8703:2
RS485+
A B C D E F G H J
D D
1 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2
3 4 3 4 3 4 3 4 3 4 3 4 3 4 3 4
5 6 5 6
5 6 5 6 5 6 5 6 5 6 5 6
7 8 7 8
7 8 7 8 7 8 7 8 7 8 7 8
9 10 9 10
9 10 11 12 9 10 11 12 9 10 9 10 9 10 9 10
11 12 13 14 11 12 13 14 11 12 11 12 11 12 11 12
15 16 15 16
13 14 13 14 13 14 13 14 13 14 13 14
17 18 17 18
E FOR APPROVAL E
15 16 19 20 15 16 19 20 15 16 15 16 15 16 15 16
OWNER:
17 18 21 22 17 18 21 22 17 18 17 18 17 18 17 18 NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
23 24 23 24 BRIDGING POWER & PROGRESS
Quezon Avenue comer BIR Road,Diliman,Quezon City
F APPROVED: DATE: F
F87T DEVICE WIRING DIAGRAM 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F26
/20.4:D
A /24.1:D A
/39.1:D =D01+R01-F26-P2 =D01+R01-F26-P1
/39.6:C
/40.1:D
01 /20.5:D 01 /47.5:B
/41.1:C 1.5 GY POW(+) -XB261:2
Com 1 -XSA26:7
/42.1:D
/43.1:C
/20.6:D 02 /47.4:D
/44.1:C 1.5 GY
-F26-P7:01
Run abnormal -XSA26:30
/45.1:C
/46.1:B
02 /20.5:D 03
/47.2:B 1.5 GY POW(-) -XB261:14
/48.1:B
/49.2:B
/20.6:D 04 /47.5:D
/50.1:B 1.5 GY
-F26-P7:16
Selfcheck -XSA26:31
/51.2:B
/57.1:A
03 /20.5:E 05 /49.4:B
/58.1:A GND -F26-GND:1
Com 2 -XSR26:5
/59.1:A
B 04 06 /49.4:D B
KI09+ Run abnormal -XSR26:28
PRS-761A
05 07
NON-ELECTRICITY PROTECTION KI10+
06 08 /49.4:D
KI11+ Selfcheck -XSR26:29
07 09
KI12+ KI01+
08 10
KI13+ KI02+
09 11
KI03+
C 10 12 /39.3:C
C
KI04+ -B26:24
11 13 /39.3:B
KI05+ -LK261:2
12 14
KI06+
13 15
KI07+
14 16
KI08+
15
16 /39.2:E
1.5 GY KI_COM -XB261:16
D D
E FOR APPROVAL E
Notes Device shell must be connected with earth bar reliably
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 DEVICE WIRING DIAGRAM 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A -F26 A
/56.1:A
PRS-761A
=D01+R01-F26-P10 =D01+R01-F26-P9 =D01+R01-F26-P8 =D01+R01-F26-P7
D MR20 18 /50.5:D
1.5 GY /20.7:D
MR15 18 /50.3:D
1.5 GY /20.7:D
D
-XSF26:19 -F26-P11:16 -XSF26:14 -F26-P9:16
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 DEVICE WIRING DIAGRAM 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A -F26 A
/56.1:A
PRS-761A
C 11 /49.3:D 11 11 /48.7:D 10 C
MR29 -XSR26:26
MR27 MR24 -XSR26:21
MR21
12 /49.3:D 12 12 /48.7:D 11
MR30 -XSR26:27
MR28 MR25 -XSR26:22
MR22
13 /51.3:B 13 13 /50.6:B 12
Com -XSF26:6
MR29 Com -XSF26:5
MR23
14 /51.2:D 14 14 /50.6:D 13
MR26 -XSF26:25
MR30 MR21 -XSF26:20
MR24
15 /51.2:D 15 15 /50.6:D 14
MR27 -XSF26:26
MR22 -XSF26:21
MR25
16 /51.3:D 16 /20.7:D 16 /50.6:D 15
MR28 -XSF26:27
1.5 GY POW(-) -F26-P11:16
MR23 -XSF26:22
17 /51.3:D 17 /50.7:D 16 /20.7:D
MR29 -XSF26:28
MR24 -XSF26:23
1.5 GY POW(-) -F26-P9:16
D D
18 /51.3:D 18 /50.7:D /20.8:D
MR30 -XSF26:29
MR25 -XSF26:24
1.5 GY
-F26-P13:16
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 DEVICE WIRING DIAGRAM 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-F26
/56.1:A
PRS-761A
=D01+R01-F26-P20 =D01+R01-F26-P19
01 /45.5:C 01 /45.2:C
BCJ1-1 -XT26:8
ACJ1-1 -XT26:1
02 /45.5:D 02 /45.2:E
BCJ1-2 -LC2605:2
ACJ1-2 -XT26:16
03 /45.6:C 03 /45.2:C
BCJ2-1 -XT26:9
ACJ2-1 -XT26:2
04 /45.6:D 04 /45.2:D
BCJ2-2 ACJ2-2
B -LC2606:2 -LC2601:2 B
05 /45.6:C 05 /45.3:C
BCJ3-1 -XT26:10
ACJ3-1 -XT26:3
06 /45.6:E 06 /45.3:D
BCJ3-2 -XT26:25
ACJ3-2 -LC2602:2
07 /45.7:C 07 /45.3:C
BCJ4-1 -XT26:11
ACJ4-1 -XT26:4
08 /45.7:D 08 /45.3:E
BCJ4-2 -LC2607:2
ACJ4-2 -XT26:19
09 /45.7:C 09 /45.4:C
BCJ5-1 -XT26:12
ACJ5-1 -XT26:5
10 /45.7:D 10 /45.4:D
BCJ5-2 -LC2608:2
ACJ5-2 -LC2603:2
=D01+R01-F26-P15
C C
11 /45.8:C 11 /45.4:C 01
BCJ6-1 -XT26:13
ACJ6-1 -XT26:6
+5V
12 /45.8:E 12 /45.4:D 02
BCJ6-2 -XT26:28
ACJ6-2 -LC2604:2
CGND
13 /45.8:C 13 /45.5:C 03 /24.4:B
BCJ7-1 -XT26:14
ACJ7-1 -XT26:7
GPS+ -XM:4
14 /45.8:D 14 /45.5:E 04 /24.4:B
BCJ7-2 -LC2609:2
ACJ7-2 -XT26:22
GPS- -XM:5
15 /45.1:C 15 /45.1:C 05
RI B -XB263:19
RI A -XB263:18
CGND
16 /45.1:E 16 /45.1:E 06
Com B -XB261:20
Com A -XB261:20
RXD
D TXD 07 D
08
CGND
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F26 DEVICE WIRING DIAGRAM 4
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F86
/32.1:C
/32.4:C
A /33.1:B A
/33.4:B
/34.1:C
/34.4:C
/35.1:B =D01+R01-F86-P4 =D01+R01-F86-P3 =D01+R01-F86-P2 =D01+R01-F86-P1
/35.5:B
/38.1:C 01 /34.6:B 01 /35.6:B 01 /32.6:B 01 /33.6:B
1ZJ1-1+ -LC863:2
2ZJ1-1+ -LC865:2
1ZJ1-1+ -LC861:2
2ZJ1-1+ -LC862:2
PRS-789
LOCKOUT RELAY /34.6:C /35.6:C /32.6:C /33.6:C
-F86-P4:05 -F86-P3:05 -F86-P2:05 -F86-P1:05
02 /34.6:E 02 /35.6:D 02 /32.6:E 02 /33.6:D
1ZJ1-1- -XT3:23
2ZJ1-1- -XT5:23
1ZJ1-1- -XT1:23
2ZJ1-1- -XT2:23
03 /34.5:B 03 /35.5:B 03 /32.5:B 03 /33.5:B
1ZJ1-2+ -XT3:17
2ZJ1-2+ -XT5:18
1ZJ1-2+ -XT1:18
2ZJ1-2+ -XT2:17
E FOR APPROVAL E
Notes OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
Device shell must be connected with earth bar reliably BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
F86 DEVICE WIRING DIAGRAM 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
F
E
D
C
B
A
RESET BUTTON
-B87
/29.8:C /29.8:A
24
23
-XB872T:16 -XB871T:10 AC MCB
/29.8:C
GY 1.5 mm²
24
23
-QE01
1
1
/21.6:D /21.6:B
2
-E01-P1:01 1 -XA:2
RESET BUTTON
2.5 GY /21.6:C GY 2.5 mm²
I>
2
1
-B26 /21.6:D /21.6:B
I>
4
3
4
3
24
23
/39.3:C
GY 1.5 mm²
24
23
AUXILIARY CONTACT
-OFE01
RESET BUTTON /36.5:E /36.5:C
12
11
-XSR87:18 -XSR87:8
12
11
-B86
/36.5:D
/32.2:B /32.2:B
/37.8:E /37.8:C
2
2
-XT1:14 -XT1:9
114
113
22
21
-XSF87:30 -XSF87:12
22
21
GY 1.5 mm²
/37.8:D
/33.2:B /33.2:B
114
113
-XT2:14 -XT2:10
GY 1.5 mm²
/34.2:C /34.2:B AC MCB
ETHERNET SWITCH
S5130S-10P-EI
/23.1:C
/21.5:D
-E01
-XT3:14 -XT3:9
124
123
-Q101
/34.2:B
GY 1.5 mm²
124
123
/21.3:D /21.2:B
/35.2:B /35.2:B
2
1
-XT5:14 -XT5:9
-XA:7 -XA:4
4
214
213
/21.2:C
2.5
2.5
/35.2:B
GY 1.5 mm²
I>
2
1
214
213
/21.3:D /21.2:B
I>
4
3
4
3
-XA:10 -XA:1
CL
GY
GY
2.5 GY GY 2.5 mm²
LIGHT
3
3
L
L
/21.3:D /21.3:D
GND
2
1
-OF101
N
L
2
1
-XA:10 -SKG:2
/21.3:E
-XSR87:17 -XSR87:7
12
11
/36.4:C
=D01+R01-E01-P1
/37.7:E /37.7:C
03
02
01
22
21
-XSF87:29 -XSF87:11
22
21
/37.7:D
LIMIT SWITCH
-SKG
GND1
/21.6:E
/21.6:C
/21.6:C
/21.3:E /21.3:D
-QE01:4
-QE01:2
2
1
4
4
2
1
2
1
4
3
4
3
-XB261:1 -XD:3
L
GY 2.5 mm²
L
/21.4:D
L
-XA:11
GY 2.5 mm²
GND
AUXILIARY CONTACT
/21.4:E
L
GND -OF26
GND
/36.4:E /36.4:C
12
11
-XSR87:16 -XSR87:7
12
11
/36.4:D
/37.7:E /37.7:C
5
5
HEATER 2
22
21
-XSF87:28 -XSF87:11
22
21
/37.7:D
-HM2
FAN2 /22.6:D
L
-XTH:13
-M2
/22.6:D
GY 2.5 mm²
/22.7:D
/22.7:B
-F86 DC POWER MCB
L
L
L
L
-XTH:15 -XTH:8
/22.7:E
GY 2.5 mm²
GND
L
L
1~
/22.8:D
/22.6:D /32.2:F /20.4:B
L
2
1
GY 2.5 mm²
/20.4:C
2
1
/32.2:A /20.4:B
I>
4
3
4
3
-XT1:6 -XD:2
1.5 GY GY 1.5 mm²
6
6
FAN1 HEATER 1
GY 2.5 mm²
/22.7:D
GY 2.5 mm²
12
11
-XSR87:15 -XSR87:6
12
11
L
L
/22.6:B
1~
/36.3:C
/22.8:B
L
L
L
GY 2.5 mm²
GY 2.5 mm²
22
21
-XSF87:27 -XSF87:10
22
21
/22.6:E
/37.7:D
-GND
GND
OWNER:
DRAWN:
REVIEWED:
APPROVED:
CONTRACTOR:
CONTRACT NO:
PROJECT NAME:
HV VOLTAGE MCB
Li Guihao
Wang Xiongping
Yi Zhiyu
7
7
/25.2:B
/25.3:B /25.3:C
Sp19.MSRP1.Mt-0408(IV)
2020.5.6
I>
2
1
2020.4.29
2020.4.30
3
4
2
1
I>
4
3
4
3
4
3
6
5
5
6
-XUH87T:3 -XUH87T:12
I>
8
7
-XUH87T:13 -XUH87T:4
0408(IV) NAA 8125 R 004
/36.3:E /36.2:C
FOR APPROVAL
12
11
-XSR87:13 -XSR87:5
8
8
12
11
AUXILIARY CONTACT
/36.3:C
-XSF87:25 -XSF87:9
1
/36.3:E /36.3:C
22
21
SCALE:
/37.6:D
SHEET NO.
12
11
-XSR87:14 -XSR87:6
12
11
61 of 75
MINDANAO SUBSTATION REHABILITATION PROJECT,
/37.6:E /37.6:C
P17 7XF02NAA Transformer Main 2 Protection Panel
22
21
-XSF87:26 -XSF87:10
22
21
V1.03
Rev Ind.:
F
E
D
C
B
A
F
E
D
C
B
A
1
1
2
2
TRIP LV CB
TRIP HV CB MAIN 2 ENABLE 87T 5CB04(7XF02NAA) COIL 2
2
1
2
1
-XB872T:7 -XB871T:5
/30.4:D
2
1
-F26-P19:10 -XT26:20
2
1
/29.4:B GY 1.5 mm²
/45.4:D
1. The -LC861~-LC866、-LC8701~-LC8705、-LS8701~-LS8705、
TRIP HV CB TEST TRIP HV CB
7-01CB24NAA COIL 2 7-01CB04NAA COIL 2
2
1
2
1
2
1
2
1
2
1
2
1
3
3
/45.3:D
/29.7:B
/30.3:D
GY 1.5 mm²
2
1
2
1
2
1
2
1
2
1
2
1
/45.2:D
/30.7:D
/30.1:D
4
4
2
1
2
1
2
1
/29.7:B
/30.6:D
/35.6:E
GY 1.5 mm²
/29.6:B
/30.5:D
/35.6:B
GY 1.5 mm²
5
5
2
1
-F87T-H:15 -XT2:5
2
1
2
1
-XB872T:11 -XB871T:7
2
1
/30.3:D
/35.6:E
/29.6:B
GY 1.5 mm²
2
1
-XB872T:10 -XB871T:6
2
1
/30.2:D
/34.6:B
/29.5:B
GY 1.5 mm²
6
6
TRIP TV CB
TRIP BAY 02
MAIN 2 ENABLE 50/51N 2CB04(7XF02NAA) COIL
2
1
-XB872T:9 -XB871T:6
/30.6:D
/33.6:B
2
1
/29.5:B
GY 1.5 mm²
-LC8704 -LC861
CONTRACTOR:
-LK873
CONTRACT NO:
/29.4:C /29.4:A
Li Guihao
Wang Xiongping
Yi Zhiyu
2
1
2
1
2
1
2
1
2
1
-XB872T:8 -XB871T:5
/30.5:D
/32.6:B
2
1
/29.4:B
GY 1.5 mm²
BRIDGING POWER & PROGRESS
DATE:
DATE:
DATE:
Sp19.MSRP1.Mt-0408(IV)
2020.5.6
2020.4.29
2020.4.30
DRAWING NO:
Project Location:
8
8
1
SCALE:
SHEET NO.
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
Quezon Avenue comer BIR Road,Diliman,Quezon City
62 of 75
MINDANAO SUBSTATION REHABILITATION PROJECT,
V1.03
Rev Ind.:
F
E
D
C
B
A
1 2 3 4 5 6 7 8
-XB263:13
-XB261:4
-XT26:29
-XT26:27
-XT26:26
-XT26:24
-XT26:23
-XT26:21
A A
/43.2:E
/39.4:B
/45.8:E
/45.7:E
/45.7:E
/45.6:E
/45.5:E
/45.4:E
BUCCHOLZ MAIN TANK TRIP
5CB04(7XF02NAA) COIL 2
5CB04(7XF02NAA) COIL 1
1 1 1 1 1 1 1 1 1
2CB04(7XF01NAA) COIL
7-01CB04NAA COIL 2
EBI MAINTENANCE
TRIP CB COIL 2
TRIP CB COIL 1
/43.3:D /39.3:B /45.6:E /45.8:D /45.7:D /45.7:D /45.6:D /45.5:D /45.4:D
-LK2601
-LC2610
-LC2609
-LC2608
-LC2607
-LC2606
-LC2605
-LC2604
-LK261
TRIP TV CB
TRIP LV CB
TRIP LV CB
TRIP HV CB
2 1 1 1 1 1 1 1 1
SPARE
SPARE
SPARE
1 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
/43.3:D
-XB263:1
/39.3:D
-F26-P1:13
/45.8:D
-F26-P20:14
/45.7:D
-F26-P20:10
/45.7:D
-F26-P20:08
/45.6:D
-F26-P20:04
/45.5:D
-F26-P20:02
/45.4:D
-F26-P19:12
B B
-XB263:15
-XB263:14
-XB263:14
/43.6:E
/43.4:E
/43.4:E
WINDING TEMPERATURE TRIP
1 1 1 1 1 1 1 1 1
-LK2609
-LK2608
/43.4:F /43.4:F /43.3:F /43.5:D /43.4:D /43.4:D
-LK2607
-LK2606
-LK2605
-LK2604
-LK2603
-LK2602
2 2 2
2 2 2 2 2 2
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
1 1 1
1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
/43.5:D
-XB263:4
/43.4:D
-XB263:3
/43.4:D
-XB263:2
-XSA26:1
-XSF87:1
-XSF26:1
-XSR87:1
/46.1:D
/37.1:D
/50.1:D
/36.1:D
D D
1 1 1 1 1
1 1 1
1 /50.3:E /46.1:C /37.1:D
/50.1:C /36.1:C
F26 SIGNAL
SAS SIGNAL
/50.4:E /50.4:E
-LP05
-LP03
-LP02
F26 SIGNAL
SAS SIGNAL
/50.5:E 1 1 1
-LP04
-LP01
/50.6:E 1 1
SPARE
-LP07
-LP06
1 1
-LP08
1
SPARE
SPARE
-LP09
1
SPARE
SPARE
2 2 2
2 2
2 2
2
2
2 2 2 2 2
2 2 2
2
/46.1:B
-XSA26:2
/37.1:C
-XSF87:2
/50.1:B
-XSF26:2
/36.1:C
-XSR87:2
E The isolator link shall be color coded as bellow: E
FOR APPROVAL
OWNER:
1. The -LC861~-LC866、-LC8701~-LC8705、-LS8701~-LS8705、 NATIONAL GRID CORPORATION OF THE PHILLIPPINES
-LC2601~-LC2610 shall be color coded with red NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
ACCESSORIES WIRING DIAGRAM 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
B B
C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 C
-THC
/22.2:D
-THC:18
-THC:19
-THC:20
-THC:17
/52.3:C
/52.4:C
/52.4:C
/52.3:C
/52.1:C
THS-Y-DI
TEM./HUM. CONTROLLER
Sensor 1
-SS1
-SS1:YELLOW
-SS1:ORANGE
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
-SS1:GREEN
-SS1:BLUE
BLUE GREEN ORANGE YELLOW
-XTH:12
-XTH:13
-XTH:14
-XTH:24
-XTH:27
-XTH:28
-XTH:29
-THC:14
-THC:13
-THC:16
-THC:15
-XTH:18
-XTH:19
-XTH:21
-XTH:22
-XTH:3
-XTH:4
-XTH:4
-XTH:2
-XTH:6
/22.3:C
/22.6:D
/22.4:C
/22.6:D
/22.4:C
/22.7:D
/52.2:E
/52.2:B
/52.2:B
/52.2:B
/22.2:D
/22.2:C
/22.2:D
/22.2:D
/22.2:B
/22.2:D
/52.3:B
/52.3:B
/52.4:B
/52.4:B
/52.6:B
/52.7:B
/52.7:B
/52.7:B
GY
GY
GY
GY
GY
GY
GY
GY
GY
GY
GY
GY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
TEM./HUM. CONTROLLER
/22.3:D /22.3:D /22.4:D /22.2:E /52.2:D /22.2:E /22.2:D /22.2:D /52.3:C /52.3:C /52.4:C /52.4:C /52.5:C /52.5:C /52.5:C /52.6:C /52.6:C /52.7:C /52.7:C /52.7:C /52.8:C /52.8:C /22.2:E /22.2:E /22.3:E /22.3:E /22.3:E /22.3:E /22.3:E /22.3:E
-THC
2
Heating-
4
Dehumidify-
6
Fan-
7 8
COM
12 13 U 15 U 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
ACCESSORIES WIRING DIAGRAM 4
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-TT01
/25.2:C
-XIH87T:12
-F87T-C:24
-XIH87T:13
-F87T-C:26
-XIH87T:14
-F87T-C:28
-XIH87T:26
-F87T-C:18
-XIH87T:27
-F87T-C:20
-XIH87T:28
-F87T-C:22
-XIH87T:30
-F87T-C:16
/26.1:B
-F87T-C:2
-F87T-C:4
-F87T-E:2
-XUH87T:5
-F87T-E:4
-F87T-E:3
FMS30
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
TEST BLOCK
/26.2:F
/26.2:D
/26.2:F
/26.2:D
/26.3:F
/26.3:D
/25.2:D
/25.3:D
/25.3:D
/25.2:E
/26.4:F
/26.4:D
/26.4:F
/26.4:D
/26.5:F
/26.5:D
/25.4:D
/25.4:E
/26.6:E
/26.6:D
RD
RD
YL
YL
BL
BL
RD
YL
BL
GR
RD
RD
YL
YL
BL
BL
RD
YL
GR
GR
1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19
/26.2:C /26.2:C /26.2:C /26.2:C /26.3:C /26.3:C /25.2:C /25.3:C /25.3:C /25.3:C /26.4:C /26.4:C /26.5:C /26.4:C /26.5:C /26.5:C /25.4:C /25.5:C /25.5:C /25.5:C /26.7:C /26.6:C /26.7:C /26.7:C /26.8:C /26.7:C /25.6:C /25.6:C /25.6:C /25.7:C
-TT01-P1
-TT01-P2
-TT01-P3
2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20
B B
1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19
2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20
RD
RD
YL
YL
BL
BL
RD
YL
BL
GR
RD
RD
YL
YL
BL
BL
RD
YL
GR
GR
/26.2:B
-XIH87T:7
/26.2:B
-XIH87T:1
/26.2:B
-XIH87T:6
/26.2:B
-XIH87T:2
/26.3:B
-XIH87T:5
/26.3:B
-XIH87T:3
/25.2:C
-XUH87T:10
/25.3:C
-XUH87T:11
/25.3:C
-XUH87T:12
/25.3:C
-XUH87T:13
/26.4:B
-XIH87T:21
/26.4:B
-XIH87T:15
/26.5:B
-XIH87T:20
/26.4:B
-XIH87T:16
/26.5:B
-XIH87T:19
/26.5:B
-XIH87T:17
/25.2:C
-TT01-P1:14
/25.3:C
-TT01-P1:16
/26.7:B
-XIH87T:31
/26.6:B
-XIH87T:29
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
C -TT02 C
/25.5:A
-XIL87T:12
-F87T-E:24
-XIL87T:13
-F87T-E:26
-XIL87T:14
-F87T-E:28
-F87T-E:11
-F87T-E:12
-F87T-E:13
-F87T-E:14
-F87T-E:15
-F87T-E:16
/27.1:C
/28.1:C
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
2.5 mm²
FMS30
TEST BLOCK
/27.2:F
/27.2:D
/27.2:F
/27.2:D
/27.3:F
/27.3:D
/28.2:D
/28.2:D
/28.2:D
/28.2:D
/28.3:D
/28.3:D
RD
RD
YL
YL
BL
BL
RD
RD
YL
YL
BL
BL
1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19
/28.4:C /28.3:C /28.4:C /28.4:C /28.5:C /28.4:C /25.6:C /25.6:C /25.7:C /25.7:C
-TT02-P3
/27.2:C /27.2:C /27.2:C /27.2:C /27.3:C /27.3:C /25.6:A /25.6:A /25.7:A /25.7:A /28.2:C /28.2:C /28.2:C /28.2:C /28.3:C /28.3:C /25.6:B /25.6:B /25.7:B /25.7:B
-TT02-P1
-TT02-P2
2 4 6 8 10 12 14 16 18 20
2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20
1 3 5 7 9 11 13 15 17 19
1 3 5 7 9 11 13 15 17 19 1 3 5 7 9 11 13 15 17 19
D 2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12 14 16 18 20 D
RD
RD
YL
YL
BL
BL
RD
RD
YL
YL
BL
BL
/27.2:B
-XIL87T:7
/27.2:B
-XIL87T:1
/27.2:B
-XIL87T:6
/27.2:B
-XIL87T:2
/27.3:B
-XIL87T:5
/27.3:B
-XIL87T:3
/28.2:B
-XIT87T:5
/28.2:B
-XIT87T:1
/28.2:B
-XIT87T:6
/28.2:B
-XIT87T:2
/28.3:B
-XIT87T:7
/28.3:B
-XIT87T:3
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
ACCESSORIES WIRING DIAGRAM 5
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XSR87:5
-XSF87:9
-XB871T:25
2.5 mm²
-XSR87:3
-XSF87:8
-XSR87:4
-XSF87:8
1.5 mm²
-XA:5
/21.6:B
/36.2:C
/37.5:C
-XD:4
/31.2:E
/36.2:C
/37.5:C
/20.6:B
/36.2:C
/37.5:C
GY
GY
13 1 5 2 6 3 7 4 8
AUXILIARY RELAY
14 1 5 2 6 3 7 4 8 13 1 5 2 6 3 7 4 8 /21.7:B /36.2:D /37.5:C /36.6:F /36.6:F
AUXILIARY RELAY
AUXILIARY RELAY
13 1 5 2 6 3 7 4 8
-KA2
/31.1:D /36.2:D /37.5:C /31.6:F /31.6:F /20.6:C /36.2:C /37.5:D /36.4:F /36.5:F
-K871
13 1 5 2 6 3 7 4 8 13 1 5 2 6 3 7 4 8
-KA1
14 9 10 11 12
14 9 10 11 12 14 9 10 11 12
14 9 10 11 12
B 13 9 10 11 12 14 9 10 11 12 B
GY
/21.6:B
-XA:2
/36.2:E
-XSR87:12
/37.5:E
-XSF87:24
GY
/31.1:D
-F87T-J:12
/36.2:E
-XSR87:10
/37.5:E
-XSF87:22
/20.6:B
-XD:10
/36.2:E
-XSR87:11
/37.5:E
-XSF87:23
2.5
1.5
C C
D D
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
ACCESSORIES WIRING DIAGRAM 6
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
RIGHT-SIDE TERMINAL BLOCK 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
9 -KA2:2 9 -OF8701T:21
-OF8702T:21 10 -OF86:21
-OF26:21 11 -OF101:21
-OFE01:21 12 -XSF86:1
XM COMMUNICATION
13
INSIDE JUMPER EXTERNAL
-F87T-G:18 14
-F87T-A:1 1
-F87T-B:2 15
C -F87T-A:2 2 C
-F87T-B:4 16
SHIELDING LAYER 3 GND1
-F87T-B:6 17
-F26-P15:03 4
-F87T-B:8 18
-F26-P15:04 5
-F87T-B:10 19
SHIELDING LAYER 6 GND1
-F87T-B:12 20
-F87T-B:15 21
XSR87 -F87T REMOTE SIGNAL
-K871:10 22
INSIDE JUMPER EXTERNAL
-KA1:10 23
D -LP01:1 1 D
-KA2:10 24
-LP01:2 2
-OF8701T:22 25
-K871:1 3
-OF8702T:22 26
-KA1:1 4
-OF86:22 27
-KA2:1 5 -OF8701T:11
-OF26:22 28
-OF8702T:11 6 -OF86:11
-OF101:22 29
-OF26:11 7 -OF101:11
-OFE01:11 8
E FOR APPROVAL E
9
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
-K871:9 10 NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
-KA1:9 11 BRIDGING POWER & PROGRESS
F
-OF26:12 16 APPROVED: DATE: F
RIGHT-SIDE TERMINAL BLOCK 2
Wang Xiongping 2020.5.6
-OF101:12 17
REVIEWED: DATE: Project Location: SCALE:
NAGAMIN SUBSTATION
-OFE01:12 18 Li Guihao 2020.4.30 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
5 5
6 -XA:11 6 -THC:16
7 -HM1:L 7
B B
-F86-P2:12 8 -HM2:L 8
-F86-P1:12 9 -M1:L 9
-F86-P4:12 10 -M2:L 10
-F86-P3:12 11 11
12 -HM1:L 12 -THC:2
13 -HM2:L 13 -THC:4
-THC:6 14 -M1:L
-M2:L 15
C C
16
XA AC POWER 17
INSIDE JUMPER -THC:25 18
EXTERNAL
-Q101:3 1 -THC:26 19
-KA2:14 2 -QE01:1 20
3 -THC:27 21
-Q101:1 4 -THC:28 22
-KA2:13 5 -QE01:3 23
D D
6 -THC:8 24
-SKG:1 7 -Q101:2 25
-XTH:1 8 -PDU:L 26
9 -THC:9 27
-LAMP:2 10 -Q101:4 -THC:10 28
-XTH:6 11 -PDU:L -THC:11 29
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
RIGHT-SIDE TERMINAL BLOCK 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
XB871T -F87T BINARY INPUT XB872T -F87T BINARY INPUT XB261 -F26 BINARY INPUT
A EXTERNAL JUMPER INSIDE A
EXTERNAL JUMPER INSIDE EXTERNAL JUMPER INSIDE
-F87T-J:02 1 -Q8701T:4 1 -F87T-D:2 1 -Q26:4
2 2 -F87T-D:4 2 -F26-P2:01
3 3 -F87T-D:6 3 -B26:23
4 4 -F87T-D:8 4 -LK261:1
14 14 -F87T-F:12 14 -F26-P2:02
-F87T-D:3 17 -F87T-D:1 17
-F87T-D:7 18 -F87T-D:5 18
-F87T-D:11 19 -F87T-D:9 19
-F87T-D:15 20 -F87T-D:13 -F26-P19:16 20 -F26-P20:16
-F87T-F:3 21 -F87T-F:1
-F87T-F:7 22 -F87T-F:5
-F87T-F:11 23 -F87T-F:9
D D
-F87T-F:15 24 -F87T-F:13
25 -K871:14
26
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
LEFT-SIDE TERMINAL BLOCK 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B 8 5 8 -XT26:1 B
9 6 -B86:113 9 -XT2:8
10 7 10
11 -F26-P7:03 8 -F87T-H:2 11 -XT2:11
13 -F26-P7:05 10 13 -F86-P2:13
14 -F26-P7:06 11 14 -B86:114
15 -F26-P7:07 12 15
C 16 -F26-P9:03 13 -LK2601:1 -F86-P2:16 16 -Q86:2 C
17 -F26-P9:04 -LK2603:1 14 -LK2602:1 17
18 -F26-P9:05 15 -LK2604:1 18 -F86-P2:03
19 -F26-P9:06 16 19 -F86-P2:04
20 -F26-P9:07 17 20
21 -F26-P11:03 18 -F26-P19:15 21 -LC861:1
22 -F26-P11:04 19 -F26-P20:15 22
23 -F26-P11:05 23 -F86-P2:02
D 24 -F26-P11:06 24 -F86-P2:06 D
25 -F26-P11:07 25 -F86-P2:10
26 -F26-P13:03
27 -F26-P13:04
28 -F26-P13:05
29 -F26-P13:06
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
LEFT-SIDE TERMINAL BLOCK 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
XT2 -F87T BINARY OUTPUT XT3 -F87T BINARY OUTPUT XT4 -F87T BINARY OUTPUT
EXTERNAL JUMPER INSIDE EXTERNAL JUMPER INSIDE EXTERNAL JUMPER INSIDE
3 3 -LC8703:1 3 -LC8704:1
5 -LS8702:1 5 5
6 6 -XT2:10 6
B B
7 -XT1:7 -F87T-H:3 7 -XT26:7
-XT26:4 8 -XT1:9 8
9 -B86:123 9 -XT5:6
-B86:113 10 -XT3:6 10
11 -XT1:11 11 -F87T-H:4
13 -F86-P1:13 13 -F86-P4:13
C 14 -B86:114 14 -B86:124 C
15 15
-F86-P1:16 16 -F86-P2:16 16
17 -F86-P1:03 17 -F86-P4:03
18 18
19 -F86-P1:04 19 -F86-P4:04
20 20
21 -LC862:1 21 -LC863:1
D 22 22 D
23 -F86-P1:02 23 -F86-P4:02
24 -F86-P1:06 24 -F86-P4:06
25 -F86-P1:10 25 -F86-P4:10
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
LEFT-SIDE TERMINAL BLOCK 3
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2 -F87T-G:9 2 -F26-P19:03
3 -LC8705:1 3 -F26-P19:05
5 5 -F26-P19:09
6 -XT3:9 6 -F26-P19:11
9 -B86:213 9 -F26-P20:03
10 10 -F26-P20:05
11 -F87T-H:6 11 -F26-P20:07
14 -B86:214 14 -F26-P20:13
C 15 15 C
17 17 -LC2601:1
18 -F86-P3:03 18 -LC2602:1
20 20 -LC2603:1
21 -LC865:1 21 -LC2604:1
22 -XT3:12 22 -F26-P19:14
D 23 -F86-P3:02 23 -LC2605:1 D
24 -F86-P3:06 24 -LC2606:1
25 -F86-P3:10 25 -F26-P20:06
26 -LC2607:1
27 -LC2608:1
-XT5:12 28 -F26-P20:12
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
LEFT-SIDE TERMINAL BLOCK 4
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F APPROVED: DATE: F
TRANSVERSE TERMINAL BLOCK 1
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B 7 B
-F26-P8:08 8
-F26-P8:09 9
-F26-P8:10 10
-F26-P8:11 11
-F26-P8:12 12
-F26-P10:08 13
-F26-P10:09 14
C -F26-P10:10 15 C
-F26-P10:11 16
-F26-P10:12 17
-F26-P12:08 18
-F26-P12:09 19
-F26-P12:10 20
-F26-P12:11 21
-F26-P12:12 22
D -F26-P14:08 23 D
-F26-P14:09 24
-F26-P14:10 25
-F26-P14:11 26
-F26-P14:12 27
-F26-P1:06 28
E FOR APPROVAL E
OWNER:
NATIONAL GRID CORPORATION OF THE PHILLIPPINES
NGCP Building, Power Center Complex,
Quezon Avenue comer BIR Road,Diliman,Quezon City
BRIDGING POWER & PROGRESS
F APPROVED: DATE: F
TRANSVERSE TERMINAL BLOCK 2
Wang Xiongping 2020.5.6
1 2 3 4 5 6 7 8