0% found this document useful (0 votes)
72 views

OEE Templet

Uploaded by

ashutoshpal21
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

OEE Templet

Uploaded by

ashutoshpal21
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

CALCULATING OEE WORKSHEET

Overall Equipment Effectiveness


Line / Cell :
Process : OEE
Machine :
Date :
81.2%
OEE DATA
Shift Length (Minutes) : 480
Number of Shift(s) : 3
Short Breaks per Shift (Minutes) : Each (Minutes) : 10 Nb : 2 Total : 20
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 1 Total : 30
Down Time (Minutes) : 30
Ideal Rate : (Pieces/Hour) : 1500 (Pieces/Minute) : 25
Total Pieces Produced per Shift : 9000
Rejected Pieces per Shift : 270

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 1290
Operating Time (Minutes) : 1200
Good Pieces per Shift : 8730

OEE FACTORS CALCULATION


Availability 93.0% 90.0%
Performance 90.0% 95.0%
Quality 97.0% 99.9%
Overall OEE 81.2% 85.4%

120%
Calculated Factor World Class

100%

80%

60%

40%

20%

0%
Availability Performance Quality Overall OEE
Rate
000000File : 667148345.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
20%

0%
Availability Performance Quality Overall OEE
Rate