Checklist For VDF

This checklist provides instructions for constructing a vacuum dewatered floor at a manufacturing plant. It outlines steps to check for [1] proper preparation of the work area before pouring concrete, [2] correct procedures during the concrete pour and vacuum dewatering process, and [3] required curing and finishing steps after the pour is complete. The checklist helps ensure high quality construction by having inspectors verify items like cleanliness, formwork rigidity, reinforcement, concrete slump, vibration, finishing, and curing.

Uploaded by

Gabriel Gabe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views1 page

Checklist For VDF

This checklist provides instructions for constructing a vacuum dewatered floor at a manufacturing plant. It outlines steps to check for [1] proper preparation of the work area before pouring concrete, [2] correct procedures during the concrete pour and vacuum dewatering process, and [3] required curing and finishing steps after the pour is complete. The checklist helps ensure high quality construction by having inspectors verify items like cleanliness, formwork rigidity, reinforcement, concrete slump, vibration, finishing, and curing.

Uploaded by

Gabriel Gabe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECKLIST FOR VDF FLOORING

Site CONSTRUCTION OF GENERAL CIVIL WORKS AT 4GW MANUFACTURING PLANT,GANGAIKONDAN

Client M/s TP SOLAR COMPANY LIMITED

PMC M/s TATA CONSULTING ENGINEERING LIMITED

Contractor M/s TATA PROJECTS LIMITED

Block/Element

Location/Grid

Date

Refer to the approved work method statement and relevant drawings

S.No. Description YES NO NA Date TPL TPS/TCE REMARKS

A Prior to the Vacuum Dewatered Flooring

1 Check for location of construction and Panel Sizes as per approved Pour plan

2 Check for cleanliness of area to be concreted.

3 Check for the stability and rigidity of Formwork and Supports?

4 Check for rigidity, alignment,level,sealing of formwork joints

5 Check for reinforcement if any

6 Check for MEP clearance

7 Check for provision of Slope for Drain

8 Mode of concrete proposed

9 Quantity of concrete poured

10 Starting time of concreting

11 Grade of Concrete

B During Vacuum Dewatered Flooring

1 Whether concreting is being done at alternate bays

2 Check for slump of the concrete being poured. Is it as specified? (write in mm)

3 Ensure proper vibration & compaction of concrete by using Surface Vibrator?

4 Ensure top level of concrete surface ? (write TOC)

5 Check for placing & spreading of filter layer. Is it OK ?

6 Check for vacuum dewatering.

7 Check for application of Surface Hardner as per approved make.

8 Check for Power float finish.

C After Vacuum Dewatered Flooring

1 Check for curing arrangements (7 days)

2 Check for groove cutting

3 Check for surface finish

4 Check for finished level of concrete

5 Check for sealing of joints with approved Sealant

Name& Sign: TPL EXECUTION ENGINEER SIGNATURE OF FQE TPS/TCE


Format No.08.03.05-FMT-C-SCW-CL-001-R00