First Appeal RTI
First Appeal RTI
Aggrieved by the information furnished, which are not correct and quite
contrary to the physical features.
2) PIO & Deputy Commissioner has not answer the Sl.No 2 in which the
appellant request for date of allotment of H.No:13-6-27/A Kulsumpura,
karwan hyderabad but it is no where mentioned in the order.
3) PIO & Deputy Commissioner has not answer the Sl.No.3 and given the
reason as Manual record not traced. if the records are not maintained by the
GHMC authorities properly than who is responsible for this act. and it's not the
mere excuse to refuse the information sought by the appellant.
4) PIO & Deputy Commissioner has not answer the Sl.No.4 and not even
mention the reason of not providing the details of Building permission given to
H.No.13-6-27/A.
(vi) Grounds for the prayer or relief : Against the false information
furnished by the PIO quite
contrary to the real facts and
not answer the Sl.No.2 to 4
(vii) Verification by the appellant; and:
I verify that the above information are true and correct to the best of my
knowledge and belief. Hence verified.
Appellant.
(Afzaluddin Faroqui)
3
(viii) any other information which the Commission may deem necessary for
deciding the appeal.
Copy enclosed
1. Order copy Dated 17-03-2023 Lr.No./RTI/TC13/GHMC/2023 from the
office of the PIO & Deputy comissioner Circle No.13, Karwan, GHMC,
Hyderabad.
2. RTI application Dated 22-02-2023 by Afzaluddin Faroqui
4
TO,
THE FIRST APPELLATE AUTHORITY,
PUBLIC INFORMATION OFFICER &
DEPUTY COMMISSIONER, CIRCLE NO.13,
KARWAN,HYDERABAD,
ZONAL COMMISSIONER, KHAIRTABAD,
HYDERABAD,GHMC .
(vii) Grounds for the prayer or relief: : Against the GHMC for non
providing the information
sought by the appellant under
RTI Act.
I verify that the above information are true and correct to the best of my
knowledge and belief. Hence verified.
Appellant.
(Afzaluddin Faroqui)
6
(ix) any other information which the Commission may deem necessary for
deciding the appeal.
The appellant has requested for the information related to the complaint
No COMPT377 & COMPT378 Dated 07-01-2023 and complaint refrence
No.660722 registered date 09-01-2023 against the illegal encroachment on
Government land and road. The application under RTI Act 2005 made on 22-
02-2023 to take an appropriate legal action against the encroachers and GHMC
officials. The GHMC has not furnish the detail only to protect the encroachers
and corrupt officials of GHMC. The appeal is filed within (30) days from the
date of completing the 30 days of Application. The requisite fee by way of
Court fee stamp of Rs.10/- is enclosed.
TO,
THE FIRST APPELLATE AUTHORITY,
PUBLIC INFORMATION OFFICER &
DEPUTY COMMISSIONER, CIRCLE NO.13,
KARWAN,HYDERABAD,
ZONAL COMMISSIONER, KHAIRTABAD,
HYDERABAD,GHMC .
(vii) Grounds for the prayer or relief: : Against the GHMC for non
providing the information
sought by the appellant under
RTI Act.
I verify that the above information are true and correct to the best of my
knowledge and belief. Hence verified.
Appellant.
(Afzaluddin Faroqui)
(ix) any other information which the Commission may deem necessary for
deciding the appeal.
Copy enclosed
1. RTI application Dated 22-02-2023 by Afzaluddin Faroqui related to
H.No.13-6-27/1, kulsumpura village, karwan, Hyderabad.
9
TO,
THE FIRST APPELLATE AUTHORITY,
PUBLIC INFORMATION OFFICER,
STATE PUBLIC INFORMATION OFFICE,
TELANGANA STATE WAQF BOARD,
RAZZACK MANZIL, OPP: PUBLIC GARDENS,
HYDERABAD-500001
1) In fact the PIO has not provided the details and action taken report against
the complaint registered dated 22-10-2023 by Afzaluddin Faroqui. The waqf
land of Masjid E Kalan(Masjid E kulsumpura) is under encroachment by
unsocial elements by creating the forged registered documents. the notices has
10
been issued to the encroachers but no action has been taken against them by
seeing this opportunity some more land grabber has created the registered
documents by showing masjid e kalan land as their private land. complainant
requested the waqf board to take an action against them but till date no action
is taken against the encroacher.
2) The appellant request for Site map, Survey report , Extent and sketch
map of Masjid E Kalan ( Masjid E Kulsumpura). The PIO has not provided the
details of the same.
4) The appellant request for the details of approval given for construction
under the land of mosque but the PIO has not provided the details of the same.
many construction works are underway in the land of mosque and many
tenants are demolishing the kamans of mosque and doing new construction
which reduces the beauty and charm of the mosque . it is an heritage of india
and telangana. it is an responsibility of the waqf board to protect such illegal
constructions on the land of mosque
(vii) Grounds for the prayer or relief: : Against the Waqf Board for non
providing the information sought
by the appellant under RTI Act.
I verify that the above information are true and correct to the best of my
knowledge and belief. Hence verified.
Appellant.
(Afzaluddin Faroqui)
(ix) any other information which the Commission may deem necessary for
deciding the appeal.
The appellant has requested for the information related to the complaint
registered Dated 22-10-2022 by Afzaluddin Faroqui and Masjid e kalan Sketch
map, Extent, and other details such as allocation of funds for the development
of the mosque to protect the heritage monument from the encroachment and
any other demolition by the illegal occupants who occupied the land of Masjid.
The appeal is filed within (30) days from the date of completing the 30 days of
Application. The requisite fee by way of Court fee stamp of Rs.10/- is
enclosed.
Copy enclosed
1.Complaint copy of Complaint Dated 22-10-2022 by Afzaluddin faroqui.
2. RTI application Dated 22-02-2023 by Afzaluddin Faroqui
12
TO,
THE FIRST APPELLATE AUTHORITY,
THE PUBLIC INFORMATION OFFICER,
DEPARTMENT OF HERITAGE TELANGANA,
GUNFOUNDRY, HYDERABAD. .
Aggrieved by the information furnished, which are not correct and quite
contrary to the physical features.
on the complaint the site and noticed staff has given the false
registered, that the construction information regarding the
Date:05-01-2023 of house has been distance of construction
by Afzaluddin carried out at a Hence the photos of
Farooqui. distance of 80 meters construction is attached
from Kulsum Begum
Mosque.
2. Please provide the See enclosed The sketch map attached
details of Kulsum documents (site map, along with the reply is
Begum Mosque extent of land) new one. Kindly provide
such as site map, the map of 1985 or the
Survey report, earlier one which is in the
Extent and sketch record of the Department
map
3. Please provide the The Department has Till date no development
details of allocated an amount work is done with the
allocation of of Rs. 3.00 Crores for amount of Heritage of
development the works at Kulsum telangana still mosque is
funds and works Begum Mosque such in depilated condition. if
related to Kulsum as (1) Restoration of any funds is released or
Begum Mosque Minars, (2) Water tender is called for the
tightening works to development work kindly
the roof, (3) Internal share the details of
and external lime contractor/Tender and
plastering works (4) amount release for the
Restoration of stucco work
works etc.
4. Please provide the The Department has There are lot of
details of approval not given permission construction done on the
given for for construction land of mosque by
construction under the land of demolishing the kamans
under the land of Kulsum Begum (Archs) of the masjid and
Kulsum Begum Mosque, Water well shown in the
Mosque. sketch map is fill with the
debris of kamans (Archs).
for refrence the site
photgraphs is attached
5. Please provide the No Remarks The staff has not taken
details and report any action on the illegal
if action is not constructions on the land
14
(vi) Grounds for the prayer or relief : Against the false information
furnished by the PIO quite
contrary to the real facts
(vii) Verification by the appellant; and:
I verify that the above information are true and correct to the best of my
knowledge and belief. Hence verified.
Appellant.
(Afzaluddin Faroqui)
(viii) any other information which the Commission may deem necessary for
deciding the appeal.
15
Copy enclosed
1. Order copy Dated 17-03-2023 Lr.No./RTI/TC13/GHMC/2023 from the
office of the PIO & Deputy comissioner Circle No.13, Karwan, GHMC,
Hyderabad.
2. RTI application Dated 22-02-2023 by Afzaluddin Faroqui