This document records welding traceability for a gaslift installation project. It lists 6 welds between pipes and valves of various materials and sizes. All welds were done on April 13, 2023 by welder K-07 and passed visual inspection. Radiography of weld SW01 was accepted on April 15 after first repair. The welds will be used to construct flowlines and facilities at the Badak #200 gas field location.

Uploaded by

Rachmad Maulana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Weldtrace Update Training 3

This document records welding traceability for a gaslift installation project. It lists 6 welds between pipes and valves of various materials and sizes. All welds were done on April 13, 2023 by welder K-07 and passed visual inspection. Radiography of weld SW01 was accepted on April 15 after first repair. The welds will be used to construct flowlines and facilities at the Badak #200 gas field location.

Uploaded by

Rachmad Maulana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

GASLIFT INSTALLATION BADAK #200

WELDING TRACEABILITY RECORD

PROJECT : FLOWLINE AND FACILITIES CONSTRUCTION SUPPORT SERVICES ACCEPTENCE STANDARD / CODE
BID NO. : SC1800476-1 LOCATION
AFE :
START & FINISH WELDING

MATERIAL FIT UP TYPE OF RADIOGRAPHY


FROM TO WELD AFTER 1ST REPAIR
JOINT DATE OF WELDER VISUAL
SCH / WPS No DATE OF FIT-UP
No DIA SCH / THK DIA WELDING STAMP WELDING ACC REJECT
TYPE SPEC Heat No. TYPE SPEC Heat No. THICKNESS BUTT FLT ACC REJECT
(Inch) (Inch) (Inch)
(Inch)

BDK-F-59D-168 ( 1 OF 3 )( 2"-HG-9G ) SPOOL TIE-IN GL

SW 01 F A105 A107 6 80/600# P API 5L Gr.B 10LD5459 6 80 V 13/Apr/2023 13/Apr/2023 K-07 ACC

SW 02 P API 5L Gr.B 10LD5459 6 80 S A105 68 6x3/4" 3000# V 13/Apr/2023 13/Apr/2023 K-07 ACC

SW 03 S A105 68 6x3/4" 3000# N A106 8 3/4" 160 V 13/Apr/2023 13/Apr/2023 K-07 ACC

BALL
SW 04 N A106 8 3/4" 160
VALVE
A105 9 3/4" 800# V 13/Apr/2023 13/Apr/2023 K-07 ACC

BALL
SW 05 A105 9 3/4" 800# N A106 8 3/4" 160 13/Apr/2023 - - ACC
VALVE

GAUGE 25/WPS/
SW 06 N A106 8 3/4" 160 A105 9 3/4" 800# KRS/III/99
13/Apr/2023 - - ACC
VALVE

GAUGE
SW 07 A105 9 3/4" 800# PI ASCROFT 1/2" 1000 PSI 13/Apr/2023 - - ACC
VALVE

P API 5L Gr.B 10LD5459 6 80 E-90 A234 Gr.WPB 10 6 80 V 13/Apr/2023 13/Apr/2023 K-10 ACC 15-Apr-23

Legend : Prepared By, Reviewed / Witness BY Approved By,

E : ELBOW S : SOCKOLET PT. KALIRAYA SARI PERTAMINA HULU SANGA SANGA PERTAMINA HULU SANGA SANGA

F : FLANGE T : TREDOLET

CR : CON RED W : WELDOLET

ER : EKS RED ET : EQUAL TEE

P : PIPE TR : TEE RED

V : VALVE N : PIPE NIPLE


KRISWANTO ALIB. M / A.ERWIN FUAN NESHALDY / EDY BUDAYA
C : CAP U : UNION QA / QC WELDING INSPECTOR Lead Construction Area PHSS

Page 1 of 6
T INSTALLATION BADAK #200
ELDING TRACEABILITY RECORD

ACCEPTENCE STANDARD / CODE : ANSI 31.8 & ANSI 31.3


LOCATION : BADAK 200

: 20 Januari 2022 s.d 21 Februari 2022

RADIOGRAPHY PENETRAN TEST / MAGNETIC


AFTER C/O HOLIDAY PARTICLE TEST
REPORT REPORT Remarks
No. No. REPORT
ACC REJECT ACC REJECT
No.

1 OF 3 )( 2"-HG-9G ) SPOOL TIE-IN GL

01/

Approved By, Approved By,

PERTAMINA HULU SANGA SANGA PERTAMINA HULU SANGA SANGA

ROMMY C
Lead Construction Area PHSS Sr. ENGINEER INSPECTION

Page 2 of 6
0

VLP GAS COMPRESSOR (Z-6700C) MUTIARA M-6 STATION


WELDING TRACEABILITY RECORD

PROJECT : ACCEPTENCE STANDARD / CODE


BID NO. : LOCATION
AFE : AFE-222090
START & FINISH WELDING

MATERIAL FIT UP TYPE OF RADIOGRAPHY


FROM TO WELD AFTER 1ST REPAIR
JOINT DATE OF WELDER VISUAL
SCH / WPS No DATE OF FIT-UP
No DIA SCH / THK DIA WELDING STAMP WELDING ACC REJECT
TYPE SPEC Heat No. TYPE SPEC Heat No. THICKNESS BUTT FLT ACC REJECT
(Inch) (Inch) (Inch)
(Inch)

MTA-M-51D-7296 1 OF 2 (4"HG-3B-60118)

SW 1 P API 5L GR.B 4" SCH.40 E-90 A234 WPB 4' SCH.40

SW 2 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40

ORIFICE
SW 3 P API 5L GR.B 4" SCH.40 A105 4" 300#RF
FLANGE

ORIFICE
SW 4 A105 4" 300#RF P API 5L GR.B 4" SCH.40
FLANGE

SW 5 P API 5L GR.B 4" SCH.40 T 4"x1" A105 5" 3000# SCRD

SW 6 T 4"x1" A105 5" 3000# SCRD P API 5L GR.B 4" SCH.40

SW 7 P API 5L GR.B 4" SCH.40 E-90" A234 WPB 4' SCH.40

SW 8 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40

SW 9 P API 5L GR.B 4" SCH.40 E-90" A234 WPB 4' SCH.40

SW 10 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40

SW 11 P API 5L GR.B 4" SCH.40 E-90" A234 WPB 4' SCH.40 V

SW 12 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40 V

SW 13 P API 5L GR.B 4" SCH.40 E-90" A234 WPB 4' SCH.40 V

SW 14 E-90" A234 WPB 4' SCH.40 F A105 4" 300#RF

SW 15 F A105 4" 300#RF E-90" A234 WPB 4' SCH.40

SW 16 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40

SW 17 P API 5L GR.B 4" SCH.40 E-90" A234 WPB 4' SCH.40 V

SW 18 E-90" A234 WPB 4' SCH.40 P API 5L GR.B 4" SCH.40

SW 19 P API 5L GR.B 4" SCH.40 F A105 4" 300#RF

20

21

22

23

24

25

26

Legend : Prepared By, Reviewed / Witness BY Approved By,

E : ELBOW S : SOCKOLET PT. KALIRAYA SARI PERTAMINA HULU SANGA SANGA PERTAMINA HULU SANGA SANGA

F : FLANGE T : TREDOLET

CR : CON RED W : WELDOLET

ER : EKS RED ET : EQUAL TEE

P : PIPE TR : TEE RED

V : VALVE N : PIPE NIPLE


KRISWANTO ALIB. M / A.ERWIN FUAN NESHALDY / EDY BUDAYA
C : CAP U : UNION QA / QC WELDING INSPECTOR Lead Construction Area PHSS

Page 3 of 6
SSOR (Z-6700C) MUTIARA M-6 STATION
LDING TRACEABILITY RECORD

ACCEPTENCE STANDARD / CODE : ANSI 31.3


LOCATION : M-6 STATION

RADIOGRAPHY PENETRAN TEST / MAGNETIC


AFTER C/O HOLIDAY PARTICLE TEST
REPORT REPORT Remarks
No. No. REPORT
ACC REJECT ACC REJECT
No.

D-7296 1 OF 2 (4"HG-3B-60118)

Approved By, Approved By,

PERTAMINA HULU SANGA SANGA PERTAMINA HULU SANGA SANGA

ROMMY C
Lead Construction Area PHSS Sr. ENGINEER INSPECTION

Page 4 of 6
0

VLP GAS COMPRESSOR (Z-6700C) MUTIARA M-6 STATION


WELDING TRACEABILITY RECORD

PROJECT : ACCEPTENCE STANDARD / CODE : ANSI 31.3


BID NO. : LOCATION : M-6 STATION
AFE : AFE-222090
START & FINISH WELDING :

MATERIAL FIT UP TYPE OF RADIOGRAPHY


FROM TO WELD AFTER 1ST REPAIR AFTER C/O
JOINT DATE OF WELDER VISUAL
SCH / WPS No DATE OF FIT-UP
No DIA SCH / THK DIA WELDING STAMP WELDING ACC REJECT
TYPE SPEC Heat No. TYPE SPEC Heat No. THICKNESS BUTT FLT ACC REJECT ACC REJECT
(Inch) (Inch) (Inch)
(Inch)

MTA-M-51D-7296 1 OF 2 (4"HG-3B-60118)

SW 1 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40

SW 2 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40

SW 3 PIPE API 5L GR.B 4" SCH.40 ORIFICE FLANGE A105 4" 300#RF

ORIFICE
SW 4 A105 4" 300#RF PIPE API 5L GR.B 4" SCH.40
FLANGE

SW 5 PIPE API 5L GR.B 4" SCH.40 THREADOLET A105 4"x1" 3000#

SW 6 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40

SW 7 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40

FW 8 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40

SW 9 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40

SW 10 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40

SW 11 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40 V

SW 12 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40 V

SW 13 ELBOW 90° A234 WPB 4' SCH.40 FLANGE WN A105 4' 300#RF V

SW 14 FLANGE WN A105 4' 300#RF ELBOW 90° A234 WPB 4' SCH.40

SW 15 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40

SW 16 PIPE API 5L GR.B 4" SCH.40 ELBOW 90° A234 WPB 4' SCH.40

SW 17 ELBOW 90° A234 WPB 4' SCH.40 PIPE API 5L GR.B 4" SCH.40 V

SW 18 PIPE API 5L GR.B 4" SCH.40 FLANGE WN A105 4' 300#RF

20

21

22

23

24

25

26

Legend : Prepared By, Reviewed / Witness BY Approved By,

E : ELBOW S : SOCKOLET PT. KALIRAYA SARI PERTAMINA HULU SANGA SANGA PERTAMINA HULU SANGA SANGA

F : FLANGE T : TREDOLET

CR : CON RED W : WELDOLET

ER : EKS RED ET : EQUAL TEE

P : PIPE TR : TEE RED

V : VALVE N : PIPE NIPLE


KRISWANTO ALIB. M / A.ERWIN FUAN NESHALDY / EDY BUDAYA
C : CAP U : UNION QA / QC WELDING INSPECTOR Lead Construction Area PHSS

Page 5 of 6
RESSOR (Z-6700C) MUTIARA M-6 STATION
WELDING TRACEABILITY RECORD

: ANSI 31.3
: M-6 STATION

RADIOGRAPHY PENETRAN TEST / MAGNETIC


HOLIDAY PARTICLE TEST
REPORT Remarks
REPORT No. No. REPORT
ACC REJECT
No.

51D-7296 1 OF 2 (4"HG-3B-60118)

GOLDEN WELD

Approved By,

PERTAMINA HULU SANGA SANGA

ROMMY C
Sr. ENGINEER INSPECTION

Page 6 of 6