Support Specification
Support Specification
REV.: E
P055AZOR.00.10.40.006
INDEX
1. PURPOSE ................................................................................................................... 4
2. SCOPE ........................................................................................................................ 4
3. TERMINOLOGY .......................................................................................................... 4
4. DEFINITIONS .............................................................................................................. 5
5. GENERAL ................................................................................................................... 8
6. DESIGN....................................................................................................................... 8
6.1 CLAMPED SUPPORTS ....................................................................................... 10
6.2 WELDED SUPPORTS ............................................................................................... 10
6.3 HANGER SUPPORTS ............................................................................................... 11
6.4 SLIDING SUPPORTS ................................................................................................ 11
6.5 SUPPORTING OF INSULATED PIPES...................................................................... 11
6.6 SUPPORTING COLD-INSULATED PIPES................................................................. 12
6.7 NON-INSULATED PIPES .......................................................................................... 13
6.8 PIPE SADDLES AND REINFORCING PADS............................................................. 14
6.9 SUPPORTING OF SMALL BORE PIPING ................................................................. 14
6.10 SUPPORTING OF VERTICAL PIPES .................................................................. 14
7. FABRICATION, MATERIALS AND WELDING........................................................... 15
8. MARKING ................................................................................................................. 16
9. INSTALLATION......................................................................................................... 16
10. PAINTING ................................................................................................................. 18
11. QUALITY ASSURANCE ............................................................................................ 18
12. SUBMITTALLS.......................................................................................................... 18
13. PRODUCT DELIVERY AND HANDLING ................................................................... 18
13.1 ASSEMBLIES OF MATERIAL ............................................................................. 18
13.2 TAGGING AND BOXING ..................................................................................... 19
14. PRODUCTS............................................................................................................... 19
14.1 MATERIALS ........................................................................................................ 19
14.2 DESIGN CRITERIA.............................................................................................. 20
14.2.1 Allowable Stress ........................................................................................... 20
15. WELDING.................................................................................................................. 20
16. DIMENSIONS ............................................................................................................ 20
17. EXECUTION .............................................................................................................. 20
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
1. PURPOSE
This document specifies requirements and gives recommendations for the design and
application of pipe support in piping systems.
2. SCOPE
This specification prescribes the general requirements for supply and installation of
fabricated elements for support and control of piping system and components. The
requirements outlined herein are supplementary to Shell Engineering Practice DEP
31.38.01.29.Gen Pipe Supports and project variation 31.38.01.29 -P4049NRP.00.PV.
Together with the piping support standard comprise the specification for design, material
selection, fabrication inspection, and packing for the following elements and their
accessories: constant support hanger, variable support hanger, rod hanger, pipe shoes,
guides, miscellaneous support, struts, vibration dampeners, rollers, slide bearings, or
special elements as identified by the specification drawing sheets.
Temporary pipe supports for hydraulic test or erection facilities are out of the scope but
subjected to specific requirements. Supports for hydraulic test to be avoided for lines
already resting on rigid support since these supports should be designed to satisfy test
condition.
All pipe supports shall be totally dimensioned and included in the 3D model as physical
support, to allow their prefabrication.
3. TERMINOLOGY
Pre-Engineered Supports: Includes all standardized. Predesign, load rated supports whose
intended use encompasses multiple applications.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
4. DEFINITIONS
ANCHOR: Device which restrains the pipe from movement and rotation
in all directions. The member to which an anchor is fixed,
however, may be subjected to displacements and/or
rotations, e.g. connections to equipment.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
BASE SUPPORT OR PIPE Dummy pipe with base plate welded to the pipe. The pipe
STANCHION: dummy will rest on the supporting structure and so support
the pipe. When considerable site adjusting is required, the
pipe stanchion may be of the 2-piece type, welded together
after adjustment.
CLAMP OR CLIP: Device bolted around a pipe or, for cold insulation, around
the insulation. Clamps form an integral part of hangers and
clamped cradles or pipe shoes.
CONSTANT LOAD SUPPORT: Spring loaded support assembly or device designed such
that the supporting effort is constant over the total travel of
the support. Constant load supports are mainly used in
pipes connected to strain sensitive equipment or for critical
systems with large movements.
DUMMY LEG, TRUNNION: Dummy pipe welded to the pipe. The pipe dummy will rest
on the supporting structure and so support the pipe.
GOAL POST SUPPORT: Frame type support for situations where heavy loads may
be expected.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
5. GENERAL
DEP 31.38.01.11-Gen. is applicable for the piping and specifies the required positioning of
pipe supports.
Supporting of pipe is an integral part of piping design. EPC Contractor will design the
supports comply with P4049NRP.00.10.10.017 for SP3D Requirements.
Pipe supports shall be designed so that access is provided for operation and maintenance.
A bill of material for pipe supports it is required and this bill of material shall contain:
Supports shall be standardized as far as practical and shall bear an identification number.
Special support identification numbers shall include the unit and/or area number.
For supporting glass-lined piping and plastic piping it will follow the specification P4049N-
0000-BA30-DCN-0667 and its attachment 3, Pipe Supports for GRP Piping, P40NRP-
76017-A99-0003.
Galvanised supports shall not be used on austenitic stainless steel, duplex stainless steel,
nickel alloy, or 9% nickel steel piping.
6. DESIGN
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Environment for the KNPC NRP project is to be considered corrosive, based on the close
proximity of the plant location to the sea.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Clamped supports are susceptible to corrosion because water may collect between the
support and the pipe. If clamped supports are used in situations where corrosion may be
expected, precautions shall be taken to protect the pipe and the supports against corrosion
e.g. by avoiding the ingress of water under insulated pipes. Clamped supports require more
maintenance than welded supports. To prevent galvanic corrosion, carbon steel clamps on
pipes of other metallic materials shall be separated from the pipe by using a layer of
synthetic rubber, glass fibre paper tape or other insulating material between the clamp and
the pipe. Clamped supports on hot pipes or on pipes with variable temperature may loosen
because of the difference in temperature between the pipe and the clamp. In those
situations weld-on shear lugs should be applied in order to avoid slipping of the pipe under
the clamp. The paint of the pipe shall be repaired after welding the shear lugs. The
application of goal post supports may avoid the clamp rotating over pipe when these
supports are used as guides or as anchor points where excessive forces/moments may be
expected.
Note: Clamped supports on insulated pipes may require a local increase of the insulation
thickness to avoid the clamps penetrating the insulation outside cover. To avoid local
insulation increases it should be considered to increase the insulation thickness of the
complete pipe. For those situations welded supports may be a better choice.
Welded supports are less susceptible to corrosion than clamped supports. In order to install
welded supports at the correct positions attention to these positions shall be paid during
the detailed design phase. The field welds in the piping shall be used to correct differences
in position during construction, caused by tolerances of the piping and the tolerances of the
supporting structures.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Supporting steel parts welded to galvanized steel structures shall be attached to steel
members before they are galvanized. Stainless steel piping shall be protected against zinc
embrittlement which may result from molten zinc dripping from galvanized steel during a
fire. See DEP 31.38.01.11-Gen.
Individual pipes may be suspended by hanger supports. Hanger supports shall not be used
in systems with two-phase flow or where excessive vibration may be expected (e.g. near
reciprocating compressors). Suspending a pipe from another pipe sho uld be avoided.
Because the survivability of any type of hanger support in a pool fire is short and fire
protecting of a rod is not reliable protection by e.g. a catch beam should be considered.
For the application of fire protection and other means of improving fire safety of a plant see
DEP 80.47.10.30-Gen. “Assessment of the Fire of Onshore Installations”.
To reduce the friction forces of sliding supports, low friction elements such as
PTFE/graphite sliding plates or roller-type supports may be considered.
The friction will be easily increased by minor corrosion between the element and the
support, therefore the landing area shall be stainless steel. Even then, the friction will be
easily increased by slight fouling (e.g. sand or dirt). F or these reasons, the use of low
friction elements in sliding supports shall be minimized. When low friction is required the
use of hanger supports may be a better solution.
“Hot” insulated piping in the pipe racks shall be supported on steel shoes. The height of the
shoe shall be such that the bottom of the insulation is 50 mm minimum above the support.
Shoe length must allow minimum length of 50 mm without restraint after pipe thermal
expansion.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Pipe supports for cold insulated piping shall be outside the insulation and shall not be in
contact with the pipe. Curved metal shields shall be interposed between the supports and
the bottom of the suitable insulation material.
When insulation is only for personnel protection, pipe may be considered as not being
insulated at the support point, cutting the insulation in such a way that a free axial
movement of ± 100 mm in both directions is allowed.
Cradles and pipe shoes of pipes operating at temperatures above 400 °C shall be insulated
from the supporting structure by incombustible insulating blocks of sufficient load -bearing
and insulation capabilities. Alternatively, clamped cradles or pipe shoes can be installed
around the insulation. At the location of these supports the insulation shall have sufficient
load-bearing capacity.
For further details regarding supporting insulated pipes in hot services, see DEP
30.46.00.31-Gen.
Pipe supports for cold-insulated pipes shall be clamped to the outer surface of the insulation
system in order to avoid the ingress of moisture in the insulation. At locations where field
insulation is applied (e.g. around field welds) the insulation shall be installed after pressure
testing the pipe. Therefore, since the pipe supports are required during erection and testing
of the piping, field applied insulation shall not be located in positions where supports are
located.
The clearance between the insulation and the supporting structure shall be at least 50 mm
taking movements of the pipe caused by thermal expansion/contraction into account.
At sliding points the loads due to friction shall be checked against the load bearing capacity
of the insulation. If required, sliding plates (3.4) shall be fitted between the pipe shoe and
supporting member.
The forces and moments on anchors, pipe stops and rotating supports shall be checked. If
these forces and moments are greater than the load-bearing capacity of clamped supports,
specially designed supports shall be used. Welded attachments to the pipe may then be
required and shall be of the same type of material as the pipe. The pipe supports shall be
insulated from these attachments using laminated hard wood or solid resin blocks of
sufficient load-bearing capacity and insulation properties.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
For further details regarding supporting cold-insulated pipes, see DEP 30.46.00.31-Gen.
Non-insulated pipes shall be supported on main pipe rack beams with a 20 mm (3/4 in)
diameter round bar (material EN 10025 S275JR or equivalent) welded on top to avoid
corrosion developing on the pipe along the entire width of the construction member, or shall
be supported on pipe shoes to avoid damaging the pipe wall for the following situations:
Surface condensation is likely (i.e. the operating temperature of the pipe is below
ambient temperature) and therefore access will be needed for painting and repair;
Needed to avoid unacceptable pipe corrosion in corrosive atmospheres (e.g. due
to coating damage caused by pipe movement and water collection on top of the
supporting structure).
Environment for the KNPC NRP project is to be considered corrosive, based on the close
proximity of the plant location to the sea so that the use of round bar will be considered.
In other cases, non-insulated pipes should be supported on pipe shoes to avoid damaging
the pipe wall:
For piping systems where only small forces on supports can be expected (e.g. instrument
air systems) the use of U-bolts may be considered. U-bolts shall not be used as fixed points
because their grip is not reliable.
Movements of pipes by thermal expansion/contraction can cause damage of the paint, and
therefore corrosion, at the location of the supports and guides. This damage can be avoided
by protecting the pipe with a composite sleeve at the location of the support. If composite
sleeves are applied they shall be designed and installed so that under no circumstances
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
can water penetrate under the sleeve. Composite sleeves should only be used for
maintenance of existing situations.
Pipe saddles and reinforcing pads shall be made from the same type of material as the
pipe and shall have a vent hole.
Pipe saddles and reinforcing pads shall not be used unless proven to be more economical
than welded or clamped supports over the total lifetime of the plant.
Pipe saddles and reinforcing pads shall not be applied on pipes operating at temperature
levels which would create high stresses in the welds due to the temperature difference
between the pipe wall and the saddle or reinforcing pad.
Pipe saddles and reinforcing pads shall not be applied on pipes operating with fluctuating
temperatures which would create high stresses in the welds.
In corrosive atmospheres, corrosion may occur between the pipe and the saddle or
reinforcing pad due to water ingress in the vent hole. Since it is not possible to inspect or
maintain the pipe under the reinforcing plate, saddles or reinforcing pads shall not be used
in areas where this corrosion may occur.
The use of pipe shoes is preferred over the use of reinforcing pads.
Clamped supports applied in vertical pipes shall be executed with weld -on shear lugs to
avoid the pipe slipping under the clamp. The paint on the pipe shall be repaired after
welding the shear lugs. If the support load exceeds the maximum load as stated on the
relevant support selection chart, the application of two supports located opposite each
other may be considered. For larger loads, special supports shall be designed.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Support materials welded directly to the pipe shall be indicated on the piping isometric
drawing and be of the same type of material as the pipe.
If pipe stanchions or dummy legs are welded to elbows or tees, a distance of at least 50
mm shall be kept between the welds of the support and the welds of the fitting.
Field welding to pipes for pipe supporting purposes shall be limited as far as practical. Field
welding for pipe support purposes shall not be performed on the following pipe materials:
For pipes requiring post weld heat treatment, attachments required for supporting purposes
shall be indicated on the piping isometric drawings, and welding shall be perfo rmed in the
workshop before post weld heat treatment.
All welds of support elements and of supports to piping shall be continuous. The fabricated
and supplied supports shall conform to the "Bill of Material for Supports" drawings and
standards and shall be able to withstand the specified loads.
Mechanical devices such as snubbers, sway braces and sway struts shall be:
Snubbers and sway braces shall have a clearly readable travel scale.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
8. MARKING
Except for small items which have restricted space for die-stamping (e.g. hanger rods, eye
nuts, etc.) each standard support component shall, in addition to paint marking, be stamped
with its size and identification mark.
The items which are not die-stamped shall have their size and identification legibly marked
on a securely attached durable tag.
Hot-dip galvanized supports shall be die-stamped with their identification mark and serial
number before galvanising. After hot dip galvanizing, these marks and numbers shall be
painted on.
9. INSTALLATION
Tie rods shall be locked in their proper position before testing, and re-adjusted as
necessary after testing in accordance with the installation instructions.
Pipe supports shall be able to sustain the hydrostatic test load of the piping they support,
if applicable.
Spring assemblies shall be shipped to the job site with the springs compressed in the
installed position as indicated on the pipe support detail drawing and/or requisition. They
shall have caution tags attached which warn that the spring locks must be removed before
the line is put in service. Additionally, the spring supports shall have the marks "C" or "H"
on the casing load indication scale:
Mark "C" indicates the cold position of the spring when the line is at ambient
temperature but filled with its actual service fluid. For tank pipes filled with the actual
service fluid, it indicates the position when the tank is empty and has zero
settlement.
Mark "H" indicates the operation positions of the spring. For tank pipes, it indicates
the position when the tank is filled and has settled.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Spring supports shall be installed with the spring locks in place. These spring locking plates
or pins shall not be removed until hydrostatic testing and insulation of the piping system
has been completed.
Note: In order to ensure the locking pins are available when next needed (e.g. during a
shutdown) it should be securely linked to the spring housing when they are not in use.
Attachments must be designed so that the stop are not easily discar ded. A light chain
welded to the hanger housing and travel stop is recommended. Vendor may submit an
alternate travel stop attachment for review. Red warning tags must be present which
indicates when the stops are to be removed.
Normally, all construction aids such as spring locks, temporary supports, welding tack s,
etc. shall be removed prior to commissioning. However, if the spring force on the empty
line will cause possible damage to connected strain sensitive equipment, the spring locks
shall remain in position until the line is filled with the actual service fluid. The relevant
support and support drawing shall bear the warning "Block against Empty Conditions" and
the locks shall be attached with the spring support during operation.
When using a blocking device, care shall be taken not to move the load indicat or and/or
the spring pressure plate. Springs shall not be de-blocked while the pipe is still empty.
The length of pipe shoes shall be sufficient to prevent pipes moving off their supports when
subjected to thermal expansion or contraction.
Adjustable supports shall be used where differential settlement between equipment and
piping may occur.
Field-welded supports shall be set correctly in place and adjusted to the final position before
welding to the pipe.
Dummy legs shall have a maximum length and be provided with a 12 mm drain hole located
at a short distance from the weld to the run pipe. Dummy legs shall not be installed at pipes
operating below ambient temperature to prevent condensation to the run pipe.
Hanger rods for pipes subject to expansion or contraction of more than 75 mm shall be set
equal to half of the calculated travel of the pipe at the point of support, in the opposite
direction to the travel as indicated on the support detail drawing, the piping arrangement
drawing and/or the isometric drawing.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
For sliding supports, bearing surfaces shall be sufficiently clean to ensure unrestricted
movement.
Safe loads on expansion bolts to be used for connecting supports to concrete shall be
based on the loading capacity of the concrete.
10. PAINTING
The surface of steel used for construction of pipe supports shall be protected by painting
according to Specification 30.48.00.31-P4001NRP-00-PV “Painting and coating of new
equipment and piping”. Special attention shall be paid to the surfaces that are not accessi-
ble when the support is installed in order to provide the appropriate protection before
erection.
Supplier shall develop and apply Quality Assurance and Quality Control Procedures and
make them available to Buyer (contractor) upon request.
12. SUBMITTALLS
Supplier shall be required to supply a certificate of material compliance for each shipment
stating that each item listed and included in that shipments conforms to the specifications
noted on the bills of material or on the specification or fabrication and installation drawings.
This certificates shall be signed by the suppliers authorized agent and properly notarized.
Each assembly of spring hangers, rod hangers, vibration dampeners, and miscellaneous
support (made up of 2 or more components) shall be completely preassembled and
packaged as an individual unit except for 305 mm (12 inch) and larger pipe clamps. These
may be reversed and securely wired or banded to its corresponding rod to accommodate
bundling or boxing. All items shall be preassembled with their respective bolts, nuts, legs
turnbuckles, and clevises. These are to be no loose pieces.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Single items such as pipes shoes may be properly boxed or crated, and shipped as bulk
items.
Each assembly shall be identified with its own tag assembly number as indicated on the
specification drawing or fabrication and installation drawing.
A copy of the buyer´s specification drawing or fabrication and installation drawing, the
supplier´s installation instructions, the bill of materials and the standard packing list, shall
be inserted in a sealed plastic envelope and securely attached to its respective assembly.
All components required for completion of any assembly must be shipped together in the
same package/crate by the supplier. Partial component shipment of an assembly shall not
be acceptable: however, partial shipment of completed assemblies, of a large order is
acceptable encouraged.
Where practical, material shall be palletized with a gross weight not to exceed 1000 kg.
(2,200 pounds).
For inland shipping and storage, adequate packaging shall be provided for protection
against the elements.
Where supplier has not adhered to specified instruction pertaining to assembly, tagging
and /or boxing of these support elements, supplier shall accept all liability and financial
burdens as may be accrued by the Company. Documentation shall charges to supplier´s
account.
14. PRODUCTS
14.1 MATERIALS
Selection of material for the support and its components shall be governed by the
design temperature of the line and the applicable codes listed in Section 20 of this
specification unless specific material are indicated on the specification drawing and
the fabrication and installation drawing.
Alloy pipe clamps shall be used for lines operating above 345 ºC (650 F) and below
0ºC (32 F).
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
15. WELDING
Load carrying welds shall be sized in accordance with applicable codes and speci fications
listed in Section 20 of this section.
Galvanized spring hanger housings shall not be welded after the coil has been installed.
Retainers for the coil shall be of a bolted or split ring type construction to avoid burning the
housing.
Spring coils shall be neoprene coated with a thickness of 0,16 mm (6 mils.) Vendor may
submit alternate coating methods for review.
16. DIMENSIONS
17. EXECUTION
17.1 INSPECTION
Each piping support element and assembly shall be inspected for conformance to its
respective contract drawing and this specification.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Verify that all contact surfaces and all piping support elements and assemblies are free of
all foreign matter prior to installation.
Check the alignment of all piping support elements and assemblies prior to making any
permanent attachments to any piping or structures.
17.2.1 Location
Piping support elements and assemblies shall be installed at the locations shown on the
contract drawings.
Spring hanger identification plate shall be positioned during erection so that it can be read
easily from the nearest platform or walkway.
17.2.2 Procedure
Welding performed in the installation of all piping support elements/assemblies shall be in
accordance with the welding specifications referenced in Section 20.
Piping support elements and assemblies upon completion of installation shall be inspected
for proper location and alignment, hot and cold load settings, quality of installation,
cleanliness of work, painting damage, and any other damage which might have occurred
during installation. Any deficiencies should be brought to the Buyer’s attention in writing .
The span between horizontal pipe supports shall be selected in accordance with Appendix
11. Spec DEP 31.38.01.11. The following tables show a guideline for support spacing on
different pipe configurations, including flare lines:
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
The Maximum spacing of guides for vertical or horizontal pipe lines shall be as follows:
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
These spacing may be varied to suit beams or pipe rack band spacing.
The above spacing is for straight runs of pipe and does not include guides which are used
to control the thermal movements such as would occur at expansion loops. For line
operating in vibrating service the spacing shall be reviewed on consideration of the
vibration source type (e.g. slug flow, two phase etc.).
20. REFERENCES
The standards and specifications listed below form part of this specification. Each standard
and specification shall be the latest revision and addendum in effect on this date this
specification is issued for construction unless noted otherwise. Except as modified by the
requirements specified herein or the details of the drawings. Work included in this
specification shall conform to the applicable provisions of these standards and
specifications.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
REV.: E
P055AZOR.00.10.40.006
Piping design and stress analysis shall be in accordance with the requirements of ASME
B31.3.
Boilers external piping between the boiler and the first block valve shall be in accordance
with ASME B31.1.
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
ATTACHMENT 01
PIPING SUPPORT STANDARD
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
INDEX
1 GENERAL .................................................................................................................................................................3
1.1 SCOPE AND OBJECT .......................................................................................................................................... 3
1.2 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS ................................................................................. 3
2. PIPING SUPPORT MATERIAL ............................................................................................................................4
2.1 STEEL SHAPES AND PLATES .............................................................................................................................. 4
2.2 TUBES................................................................................................................................................................. 4
2.3 BOLTING (BOLT AND NUTS ) AND RODS FOR HANGING.................................................................................... 4
2.4 MATERIAL SPECIFICATION FOR SUPPORT MEMBERS...................................................................................... 5
3 GENERAL NOTES, PREFABRICATION AND ERECTION...........................................................................6
3.1 GENERAL ............................................................................................................................................................ 6
3.2 WELDING............................................................................................................................................................ 7
3.3 BOLTING AND THREAD ELEMENTS..................................................................................................................... 8
4 SYMBOLOGY ON PIPING DRAWING...............................................................................................................9
4.1 PIPE SUPPORT POSITION IDENTIFICATION...................................................................................................... 9
4.2 PIPE SUPPORT MARK ..................................................................................................................................... 10
4.2.1 Standard Pipe Support........................................................................................................................... 10
4.2.2 Special Pipe Support.............................................................................................................................. 10
4.2.3 Structural Pipe Support.......................................................................................................................... 10
4.2.4 Resting Point ............................................................................................................................................ 11
4.2.5 Clarification notes.................................................................................................................................... 11
4.2.5.1 Existing Pipe Support ........................................................................................................................ 11
4.2.5.2 General: ................................................................................................................................................ 12
4.3 IDENTIFICATION LETTER/S FOR PIPE SUPPORT TYPES ............................................................................... 12
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
1 GENERAL
This Specification, with the Codes and Standards listed in paragraph 1.2 constitutes the basic
document to determine the minimum requirements for the design, calculation and installation of
the necessary elements for piping supports, out of the scope of standard specifications JA-101
"Reinforced Concrete Structure" and JB-101 "Main Steel Structures".
All Codes and Standards here mentioned are applicable in their last existing edition at least 6
months before the signature of the contract date for a project.
For Recommended Shapes and Maximum Loads Applicable to Standard Drawings refer to
Attachment 03 (P055AZOR.00.10.10.006-att03).
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
In general support material selection shall be as per Table 2.4 “Materials Specification for Support
Members”.
Material: common carbon steel welding with the following minimum mechanical characteristic (1).
Yield point ...........................................................………. 2.600 kg/cm²
Modulus of elasticity ....................................................... 2,1 x 106 kg/cm²
Modulus of rigidity........................................................... 0,81 x 106 kg/cm²
Poison's ratio................................................................... 0,3
(2)
Coefficient of lineal expansion ........................................ 12 x 10-6 m/(mºC)
(1)
If the plates to be used are for making a transition ele ment and they have to be directly welded to the pipe, the plates
shall be of the same or equivalent quality material as the pipe.
(2)
m/m = meter per meter.
2.2 Tubes
For trunnion fabrication, tubes shall be of the same or equivalent quality material as the pipe to
which they are to be welded. For the construction of supporting structure, they will be of any
other existing quality material in the Project, adequate to the effects to which they will be
subjected.
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Material Specification for Support Members
2.4
Support Element Type
PIPING Support
Material Element Welded to Element not Welded to pie but in contact with thermal flow Element out of thermal flow or completely
(MAT Pipe or inside insulation outside of insulation
Temp. CLASS)
A5 A10
A1 A2 A3 A4 A6 A7 A8 A9 A11 A12
Materal (ºC) Pipe Plate Pipe Plate Threaded Bolt Nuts Pipe Plate Threade Bolt Nuts
NOTE 1 Rod d Rod
CARBON
STEEL -29 to 100 CG NOT USED A106 Gr.B A 36 A307 Gr. B A307 Gr. B A194 Gr.2H A106 Gr. B A 36 A307 Gr. B A307 Gr. B A194 Gr.2H
(GALV.)
LOW TEMP.
PIPING SUPPORT STANDARD
CL Gr.60 Gr.B7
STEEL
P055AZOR.00.10.40.006-att01
A333
5 Cr - 1/2 Mo 344 to 649 AH A335-P11 A335-P11 A194 Gr.2H A106 Gr. B A 36 A307 Gr. B A307 Gr. B A194 Gr.2H
Gr.11 Gr.11 Gr.B8 CL1 Gr. B8 CL1
9 Cr – 1 Mo
5 OF 12
REV.: E
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
NOTE: 1. Maximum material temperature corresponds to design temperature.
2. Provide separator between pipe and support to avoid direct contact, as indicated in corresponding standard drawing (Annex HG-102-I).
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
3.1 General
- All supports shall have an identification mark. This mark shall be the same as that shown on
piping drawings, unless otherwise indicated in such piping drawings.
- For horizontal pipe, the orientation angles of the support shall be measured, looking to Plant
North or East, in clockwise direction regarding to tube top.
- Supports are dimensionally valid for prefabrication; however, due to admissible construction
tolerances they shall be checked before fabrication or constructed in such a way that they
permit adjusting “in situ".
- All springs must remain blocked in order to avoid overloads on pipes or equipment nozzles
until hydrostatic testing has been done.
- When in the installation of the springs, the load gage made in the shop has been accidentally
lost, use the existing regulating devices (turnbuckles, threaded pieces, etc.) in order to reach
the correct load indicated on the scale of the spring.
- When a plate must be bended and the external bending radius is not specifically indicated, this
shall be twice its thickness for plates up to 10 mm. and three times its thickness for thicker
plates.
- For supports where different steel shapes than those graphically represented on the standard
drawings are required, the reference for the substitution criteria shall be as indicated on
standard drawing nº SA4-3702A.
- Pipes shall be temporary supported during their installation and until the final supports have
been installed in order to avoid overloads on pipes or equipment nozzles.
- Special attention shall be paid to pipes resting on brackets by means of trunnions in order to
assure that the pipe weight is supported by the brackets and not by the equipment nozzle.
- Vent holes made in cradles and trunnions shall be plugged by means of solid grease if the
operation temperature of the line where they are installed is 100ºC or lower.
- Construction of supports types CS01 to CS04 (see drawings SA4-3764A to SA4-3767A) shall
be made maintaining the existing mat reinforcements of pavement. If this is not possible, a
new mat reinforcement shall be properly joined to the existing one.
- Any support element being directly welded to a pipe shall be of the same or equivalent quality
material as the pipe, unless otherwise indicated.
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
- A Stainless Steel thin plate of 1mm thick and 100mm wide shall be welded on top of Carbon
Steel pipe supports, when not insulated Stainless Steel pipes rest directly on them.
- When a plate has to be fixed to concrete with expansion bolts and a shape is required to be
welded on this plate, the weld between them shall always be made after the plate has been
fixed.
- Small bore branch connections DN 50 (2” NPS) and smaller under vibration conditions shall be
provided by pipe support subcontractor with stiffening plates (see drawing SA4-3871A).
- All safety valves shall be provided with braces, type “PS70” (see drawing SA4-3840A).
- Trunnion supports shall be confirmed by Pipe Stress Engineer. For special trunnions supports,
calculation & drawing shall be attached in Pipe Stress Report.
3.2 Welding
- The joining of different constitutive elements of a support shall be made using continuous
seam welding unless bolted unions or other type of joint is indicated.
- The welding of supports, anchors, trunnion, guides, etc. to pipelines must be made with
approved welding procedures as required in the standard Spec. HW-103 I “Piping Fabrication
Requirements” and electrodes shall be as indicated in the standard Spec. WA-102 I “General
Requirements for the Selection of Welding Electrodes and Rods”.
- The throat of the fillet weld shall have a minimum thickness of 0.7 times the thickness of the
thinner plate to be welded, unless otherwise indicated.
- Welds of any pipe support element welded to a pipe shall be made in such a way that the wall
of the pipe shall not be burnt through.
- The use of rivets is not permitted.
- Welding of support elements directly welded to pipes shall be submitted to PWHT Project
Specific Requirements.
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
- Threaded elements shall have metric and right hand thread unless otherwise indicated.
- When tie rods are used for hanging pipes, they shall be designed so that their length can be
adjusted “in situ”. If it is not possible, the same effect can be obtained by using turnbuckles
between the rods. Standard SA4-3726A attached to this specification.
- All bolting unions shall be fixed by using of nut and lock nut.
- The diameter of all bolt holes shall be 2mm larger than the corresponding bolt size and unless
otherwise noted shall be disposed on the axis of scratch gage of steel shapes.
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
The graphic indication of a particular pipe support position on a piping isometric drawing will be as
follows:
Where:
No.: Pipe support position identification “Support ID” (see point 4.1)
Where:
XXXXX: Note for clarify the support (see point 4.2.5)
The graphic indication for the clarification notes, shall be located below its own pipe support position
identification (Support ID)
Pipe support position identification (SUPPORT ID) shall be included on the isometric drawing,
within the symbol used for its graphic indication, as follows:
Where:
b: Identification code of the line to which the pipe support position is applicable.
Example:
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
Each pipe support position can be composed by one or more pipe support types (see point
4.3) identified by their corresponding Pipe Support Mark, conforming all together only one
support and defined as Pipe Support Assembly.
The Pipe Support Mark of the different pipe support types shall be as follows:
Example:
PS06-1-300-300-600-L100x10-L100x10
Where:
b: Identification code of the line to which the special pipe support is applicable.
Example:
SS-001-01P02-0056
Where:
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
c: Circuit number
Example:
SPS-GR-0100-001
The support mark of a support point of a pipe resting directly on an existing structure or
existing pipe rack/track without any other support mark shall be indicated as follows:
RESTING POINT
The graphic indication for the clarification notes, shall be located below its own pipe
support position identification (Support ID)
Support point of a pipe resting on an existing support assigned to another line, shall
be indicated as follows:
a
Where:
a: Pipe support position identification of the point to which the existing support
is assigned.
Example:
EXIST. SUPP.-POS-01-01P01-0001
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att01 REV.: E
4.2.5.2 General:
To clarify the assembly support, indicated any variation of support used with
respect to the standard support, indicate location/orientation, etc
Example:
CL – Clamp
EL – Elements for piping supports
UB – U-Bolt
B – Bracket
BG – Guide bracket
C – Cradle for metallic pipe
CS – Concrete pier
D – Directional anchor
FA – Anchored floor stand
FG – Guided floor stand
FS – Sliding floor stand
G – Guide
GE – Plate for guide
GR – Guide for pipe on pipe rack
H – Hanger
PS – Pipe Support from existing steel or concrete
S – Spring
T – Trunnion for metallic pipe
TR – Reinforced pad
Z – Shoes
SL – Sliding plate
VC – Clamp Vibration pipe support without Disc Spring
VA – Vibration pipe support with anchor
V – Vibration pipe support
VG – Vibration pipe support with guide
SS – Special pipe support
SPS – Structural support defined on civil drawings
RESTING POINT
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
ATTACHMENT 02
PIPING SUPPORT DRAWINGS COLLECTION
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
INDEX
Steel shapes substitution criteria SA4-3702A-2
U-Bolt. SA4-3732A-2
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
Concrete pier with anchor bolt for supports on compacted ground SA4-3766A-2
Concrete pier with top plate for supports on compacted ground SA4-3767A-2
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att02 REV.: E
Vibration pipe support for uninsulated pipes with guides (Sheet 1 of 2) SA4-3880A-2
Vibration pipe support for uninsulated pipes with guides (Sheet 2 of 2) SA4-3880A-2
Vibration pipe support for uninsulated pipes without guides (Sheet 1 of 2) SA4-3881A-2
Vibration pipe support for uninsulated pipes without guides (Sheet 2 of 2) SA4-3881A-2
Vibration pipe support for insulated pipes (Sheet 1 of 2) SA4-3882A-2
Vibration pipe support for uninsulated pipes without guides (Sheet 2 of 2) SA4-3882A-2
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
ATTACHMENT 03
RECOMMENDED SHAPES AND MAXIMUM LOADS
APPLICABLE TO STANDARD DRAWINGS
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
INDEX
1. SCOPE........................................................................................................................ 3
2. SUPPORTS FROM EXISTING STEEL......................................................................... 4
2.1. SUPPORT “PS01”: SUPPORT FROM EXISTING STEEL........................................ 4
2.2. SUPPORT “PS02”: SUPPORT FROM EXISTING STEEL........................................ 5
2.2.1. FRICTION FORCE PERPENDICULAR TO BRACKET LONGIT UDINAL AXIS ..... 5
2.2.2. FRICTION FORCE PARALLEL TO BRACKET LONGIT UDINAL AXIS ................ 6
2.3. SUPPORT “PS03, PS04 & PS05”: SUPPORT FROM EXISTING STEEL................. 7
2.4. SUPPORT “PS06”: SUPPORT FROM EXISTING STEEL........................................ 8
2.5. SUPPORT “PS07”: SUPPORT FROM EXISTING STEEL........................................ 9
2.5.1. FRICTION FORCE PERPENDICULAR TO BRACKET LONGIT UDINAL AXIS ..... 9
2.5.2. FRICTION FORCE PARALLEL TO BRACKET LONGIT UDINAL AXIS .............. 10
2.6. SUPPORT “PS08”: SUPPORT FROM EXISTING STEEL...................................... 11
2.6.1. MAXIMUM ECCENTRICITY “L” = 200mm......................................................... 11
2.6.2. MAXIMUM ECCENTRICITY “L” = 400mm......................................................... 12
2.7. SUPPORT “PS09”: SUPPORT FROM EXISTING STEEL...................................... 13
2.7.1. MAXIMUM ECCENTRICITY “L” = 200mm......................................................... 13
2.7.2. MAXIMUM ECCENTRICITY “L” = 400mm......................................................... 14
2.8. SUPPORT “PS10”: SUPPORT FROM EXISTING STEEL...................................... 15
2.8.1. FRICTION FORCE: PERPENDICULAR TO MAIN INERTIA AXIS ...................... 15
2.8.2. FRICTION FORCE: PARALLEL TO MAIN INERTIA AXIS ................................. 16
2.9. SUPPORT “PS12”: SUPPORT FROM EXISTING STEEL...................................... 17
2.9.1. MAXIMUM LENGTH “L” = 1000mm .................................................................. 17
2.9.2. MAXIMUM LENGTH “L” = 2000mm .................................................................. 18
2.10. SUPPORT “PS13”: SUPPORT FROM EXISTING STEEL .................................. 19
2.10.1. MAXIMUM LENGTH “L” = 1000mm .................................................................. 19
2.10.2. MAXIMUM LENGTH “L” = 2000mm .................................................................. 20
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
1. SCOPE
This document provides the basis to select the size of the shapes used in different support
configurations according to pipe diameter and/or maximum allowable loads.
For those support configurations not included in this document the selection criteria established on
their corresponding Standard Drawing shall be followed.
The selected shapes are the minimum recommended for the configuration and maximum established
loads. Support engineer shall be aware about the transmitted loads on the existing structure, taking
into account the maximum loads that the existing structure is able to withstand.
Any variation of the support configuration or load conditions established in this document shall be
analysed.
The following shapes have been established as recommended, according to the symbology indicated
below:
- L40: L40x40x6
- L60: L60x60x6
- L80: L80x80x8
- L100: L100x100x10
- L120: L120x120x12
- U: UPN shape (e g. U100: UPN-100)
- I: IPN shape(e g. I120: IPN-100)
- H: HEB shape (e g. H140: HEB-140)
If, for any reason, the recommended shapes cannot be used, the steel substitution criteria shall
consider shapes with higher values of Moment of Inertia (I) and Section Modulus (W) in both axes
than the recommended ones.
This document is to be read in conjunction or directly related to document P055AZOR.00.10.40.006-
att02 Piping Support Standard
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L (mm)
P (kN)
200 300 400 500 600 700 800 900 1000
I120 I120 I140
H100 H100 H100
≤5 L80 L100 L120 H100 H100 H120
U140 U140 U160
U80 U100 U120
I120 I140
H100 H100
7.5 L100 L120 H100 H120 H120 H120 H120
U140 U160
U100 U120
I140
H100
10 L120 H100 H100 H120 H120 H140 H140 H140
U140
U120
H100
15 H100 H120 H120 H140 H140 H160 H160 H160
U160
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
P L (mm)
(kN) 500 700 900 1100 1300 1500 1700 2000
L80 L80 L80 L100 L100 L120 L120 L120
≤5
H100 H100 H100 H100 H100 H120 H120 H140
L80 L80 L100 L100 L120 L120 L120
7.5 H160
H100 H100 H100 H100 H120 H120 H140
L80 L100 L100 L120 L120 L120
10 H160 H160
H100 H100 H100 H120 H120 H140
L100 L100 L120 L120 L120
15 H160 H160 H160
H100 H100 H120 H120 H140
L120 L120 L120 L120
20 H140 H160 H160 H180
H100 H120 H120 H140
L120 L120 L120
25 H140 H160 H160 H180 H180
H120 H120 H140
L120 L120
30 H140 H160 H160 H180 H180 H180
H120 H140
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
P L (mm)
(kN) 1000 1200 1400 1600 1800 2000
I100 I100
L100 L100 L100 L100
≤5 L80 L80
U120 H100 H100 H100
U100 U100
I100 I100
L100 L100 L100 L100
7.5 L100 L100
H100 H100 H100 H100
U100 U100
I100 I120
L100 L120 L120
10 L100 L100 H120
H100 H100 H100
U100 U120
H100 H100
H100 H100 H100
15 L100 L100 H120
L100 L120 L120
U120 U120
H100 H100
H100 H100
20 L100 L100 H120 H120
L100 L120
U120 U120
H100
H100 H100 H120
25 L100 H120 H120
L120 L120 L120
U120
H120 H120 H120
30 H120 H120 H140
L100 L120 L120
H120 H120
35 H120 H140 H140 H140
L120 L120
H120 H120
40 H140 H140 H140 H140
L120 L120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
2.3. SUPPORT “PS03, PS04 & PS05”: SUPPORT FROM EXISTING STEEL
NOTES:
P L (mm)
(kN) 600 800 1000 1200 1400 1600 1800 2000
I120 I120 I120 I120 I120 H100 H100
H100
≤5 L80 L100 L100 L100 L100 I120 I120
U140
U80 U100 U100 U100 U120 U120 U120
I120 I120 I120 I120 H100
H100 H100 H100
7.5 L100 L100 L100 L100 I120
U140 U140 U140
U100 U100 U100 U100 U120
I120 I120 I120
H100 H100 H100 H100 H120
10 L100 L100 L100
U140 U140 U140 U140 U160
U100 U100 U100
I120 I120
H100 H100 H100 H100 H120
15 L100 L100 H120
U140 U140 U140 U160 U160
U100 U100
I120
H100 H100 H100 H100
20 L100 H120 H120 H120
U140 U140 U160 U160
U100
H100 H100 H100 H100
25 H120 H120 H120 H140
U140 U140 U160 U160
H100 H100 H100
30 H120 H120 H120 H140 H140
U140 U160 U160
H100 H100
35 H120 H120 H120 H140 H140 H160
U140 U160
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
1. - F: friction force (F = μ P/2); μ = 0.4
(3) - U ≤ U100
Shape “W”
- H ≤ H100
- I ≤ I160
5.- P=allowable load (kN)
L (mm)
P (kN)
200 300 400 500 600 700 800 900 1000
I120 I140 I140 H100 H100
H100 H100 H100 H100
≤5 L100 L100 L100 L100 L100
L120 L120 L120 L120
U100 U120 U120 U140 U140
I140 H100
I140 H100 H100 H100 H120
7.5 L100 L100 H120 H120
U120 L120 L120 L120 L120
U120 U140
I140
H100 H100 H100 H120
10 L120 H120 H120 H140 H140
L100 L120 L120 L120
U120
H100 H100 H120
15 H120 H140 H140 H140 H160 H160
L120 L120 L120
H100 H120
20 H140 H140 H140 H160 H160 H160 H160
L120 L120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
P L (mm)
(kN) 500 700 900 1100 1300 1500 1700 2000
I120 I120 I120 I140 I140
L100 L100 L120
≤5 L80 L80 L80 L80 L100
U120 U140 U160
U80 U80 U80 U100 U120
I120 I120 I120 I140
L100 L100 L120 L120
7.5 L80 L80 L80 L80
U120 U140 U160 H100
U80 U80 U100 U100
I120 I120 I140
L100 L100 L100 L120 L120
10 L80 L80 L80
U120 U140 U160 H100 H120
U80 U80 U100
I120 I120
L100 L100 L100 L120 L120
15 L80 L100 H140
U120 U140 H100 H100 H120
U80 U100
I140
L100 L100 L100 L120 L120
20 L100 H140 H140
U120 U140 H100 H100 H120
U100
L100 L100 L100 L100 L120
25 H140 H140 H160
U120 U140 H100 H100 H120
L100 L100 L100 L120 L120
30 H140 H160 H160
U140 H100 H100 H120 H140
L100 L100 L120
35 H120 H140 H160 H160 H160
H100 H100 H120
L100 L100 L120
40 H140 H160 H160 H160 H160
H100 H120 H120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
L (mm)
P (kN)
1000 1200 1400 1600 1800 2000
I120 I120 I120 I140 I140 I160
≤5 L80 L80 L100 L100 L100 L120
U80 U80 U100 U100 U100 U120
I120 I120 I120 I140 I140 I160
7.5 L80 L80 L100 L100 L100 L120
U80 U80 U100 U100 U100 U120
I120 I120 I120 I140 I140
H100
10 L100 L100 L100 L100 L120
U120
U100 U100 U100 U100 U120
L100 L100 L120 L120
H100 H100
15 H100 H100 H100 H100
U120 U120
U120 U120 U120 U120
H100 H100 H100 H100 H100 H120
20
U120 U120 U120 U120 U120 U140
L100 L120 L120
H120 H120 H120
25 H100 H100 H100
U140 U140 U140
U120 U120 U120
L100 L120
H120 H120 H120 H140
30 H120 H120
U140 U140 U140 U160
U140 U140
H120 H120 H120 H140 H140 H140
35
U140 U140 U140 U160 U160 U160
H120 H120 H140 H140 H140 H140
40
U140 U140 U160 U160 U160 U160
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
P H (mm)
(kN) 400 600 800 1000 1200 1400 1600 1800 2000
L80 L80 L80 L80 L100 L100 L120
≤1 H120 H120
H100 H100 H100 H100 H100 H100 H120
L80 L80 L80 L100 L100 L100 L120
2 H120 H120
H100 H100 H100 H100 H100 H100 H120
L100 L100 L100 L100 L100 L120 L120
3 H120 H120
H100 H100 H100 H100 H100 H100 H120
L100 L100 L120 L120 L120 L120 L120
4 H120 H120
H100 H100 H100 H100 H100 H120 H120
L120 L120 L120 L120 L120 L120
5 H120 H120 H140
H100 H100 H100 H100 H100 H120
L120 L120 L120
7.5 H120 H120 H140 H140 H140 H140
H100 H100 H120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
P H (mm)
(kN) 400 600 800 1000 1200 1400 1600 1800 2000
L100 L100 L100 L100 L100 L100 L120
≤1 H120 H120
H100 H100 H100 H100 H100 H100 H100
L100 L100 L100 L100 L100 L100 L120
2 H120 H120
H100 H100 H100 H100 H100 H100 H100
L100 L100 L100 L100 L120 L120 L120
3 H120 H120
H100 H100 H100 H100 H100 H100 H120
L120 L120 L120 L120 L120 L120 L120
4 H140 H140
H120 H120 H120 H120 H120 H120 H120
7.5 H140 H140 H140 H140 H140 H160 H160 H160 H160
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L= 200
P H (mm)
(kN) 400 600 800 1000 1200 1400 1600 1800 2000
L80 L80 L80 L80 L100 L100 L120
≤1 H120 H120
H100 H100 H100 H100 H100 H100 H120
L80 L80 L80 L100 L100 L100 L120
2 H120 H120
H100 H100 H100 H100 H100 H100 H120
L100 L100 L100 L100 L100 L120 L120
3 H120 H120
H100 H100 H100 H100 H100 H100 H120
L100 L100 L120 L120 L120 L120 L120
4 H120 H120
H100 H100 H100 H100 H100 H120 H120
L120 L120 L120 L120 L120 L120
5 H120 H120 H140
H100 H100 H100 H100 H100 H120
L120 L120 L120
7.5 H120 H120 H140 H140 H140 H140
H100 H100 H120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
L=400
NOTES:
P H (mm)
(kN) 400 600 800 1000 1200 1400 1600 1800 2000
L100 L100 L100 L100 L100 L100 L120
≤1 H120 H120
H100 H100 H100 H100 H100 H100 H100
L100 L100 L100 L100 L100 L100 L120
2 H120 H120
H100 H100 H100 H100 H100 H100 H100
L100 L100 L100 L100 L120 L120 L120
3 H120 H120
H100 H100 H100 H100 H100 H100 H120
L120 L120 L120 L120 L120 L120 L120
4 H140 H140
H120 H120 H120 H120 H120 H120 H120
7.5 H140 H140 H140 H140 H140 H160 H160 H160 H160
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
P
P H (mm)
(kN) 200 400 600 800 1000 1200 1400 1600 1800 2000
I120 I120 I120 I120 I120 I140
≤5 H100 H120 H120 H120
H100 H100 H100 H100 H100 H100
I120 I120 I120 I120 I140
7.5 H100 H100 H120 H120 H120
H100 H100 H100 H100 H100
I120 I120 I120 I120 I140
10 H100 H120 H120 H120 H140
H100 H100 H100 H100 H100
I120 I120 I120 I140
15 H100 H120 H120 H140 H140 H140
H100 H100 H100 H100
I120 I120 I140
20 H100 H120 H120 H140 H140 H160 H160
H100 H100 H100
I140 I140
25 H100 H100 H120 H140 H140 H160 H160 H160
H100 H100
30 H100 H100 H100 H120 H140 H140 H140 H160 H160 H180
35 H100 H100 H100 H140 H140 H140 H160 H160 H180 H180
40 H100 H100 H120 H140 H140 H160 H160 H180 H180 H180
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
P
F
P H (mm)
(kN) 200 400 600 800 1000 1200 1400 1600 1800 2000
I120 I120
≤5 H100 H100 H100 H120 H120 H120 H140 H140
H100 H100
I120 I140
7.5 H100 H100 H120 H120 H140 H140 H160 H160
H100 H100
I120
10 H100 H100 H100 H120 H140 H140 H160 H160 H180
H100
15 H100 H100 H100 H120 H140 H140 H180 H180 H180 H180
20 H100 H100 H120 H120 H140 H160 H180 H180 N.A. N.A.
25 H100 H120 H120 H140 H160 H160 H180 N.A. N.A. N.A.
30 H100 H120 H140 H140 H160 H180 N.A. N.A. N.A. N.A.
35 H100 H120 H140 H160 H180 H180 N.A. N.A. N.A. N.A.
40 H100 H140 H160 H160 H180 N.A. N.A. N.A. N.A. N.A.
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L = 1000
H (mm)
P (kN)
400 600 800 1000 1200 1400 1600 1800 2000
L80 L100 L100 L100 L100 L100 L120 L120 L120
≤5
U120 U120 U120 U140 U160 H100 H100 H120 H120
L100 L100 L100 L100 L100 L100 L120 L120 L120
7.5
U140 U140 U140 U160 H100 H120 H120 H120 H120
L120 L120 L120 L120 L120 L120 L120
10 H120 H140
U160 H100 H100 H100 H120 H120 H120
L120 L120 L120 L120
15 H120 H140 H140 H140 H140
H100 H100 H100 H120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L=2000
H (mm)
P (kN)
400 600 800 1000 1200 1400 1600 1800 2000
H100 H100 H100 H100 H100 H100 H100
≤5 H120 H120
L100 L100 L100 L120 L120 L120 L120
H120 H120 H120 H120 H120 H120 H120
7.5 H120 H140
L120 L120 L120 L120 L120 L120 L120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L=1000
H (mm)
P (kN)
400 600 800 1000 1200 1400 1600 1800 2000
L80 L100 L100 L100 L100 L100 L120 L120 L120
≤5
U120 U120 U120 U140 U160 H100 H100 H120 H120
L100 L100 L100 L100 L100 L100 L120 L120 L120
7.5
U140 U140 U140 U160 H100 H120 H120 H120 H120
L120 L120 L120 L120 L120 L120 L120
10 H120 H140
U160 H100 H100 H100 H120 H120 H120
L120 L120 L120 L120
15 H120 H140 H140 H140 H140
H100 H100 H100 H120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att03 REV.: C
NOTES:
L=2000
H (mm)
P (kN)
400 600 800 1000 1200 1400 1600 1800 2000
H100 H100 H100 H100 H100 H100 H100
≤5 H120 H120
L100 L100 L100 L120 L120 L120 L120
H120 H120 H120 H120 H120 H120 H120
7.5 H120 H140
L120 L120 L120 L120 L120 L120 L120
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att04 REV.: C
ATTACHMENT 4
STANDARD OF CLIPS FOR VESSELS
_____________________________________________________________________________________________
This document is property of KNPC. Its reproduction without previous permission in writing is strictly forbidden.
Al-Zour Refinery Project
(Contract No.: ZOR/EPC-0055-A - Main Process Units)
P055AZOR.00.10.40.006-att05 REV.: A
ATTACHMENT 05
PIPING SUPPORT FOR GRP PIPING
This document is property of KNPC. Its reproduction without a written permission is strictly forbidden.
01223 4
6789
4'(8)77
*+"
7,6789
98!"#$
%&
%56 &78
7
.$/04
7- 12$13$-4
'+
"
49
1 -:$-1$;1-4
5<78=7%>55>
44?
07
*
7
"
08)9
"0
-$
;$
@$
1 -:$-1$-4 +00)
0*87)0
AB! A4 4C
7- 12$13$-4 +00)
0*877
.+
E4"0899
"0 AB! A4 4.
7
.$ 04
0
07+6+8" 67
647
0 ?
D
0 46678.
0
7
.+0
00?
08"',+00)
0
"+7
08)9
"+00)
0 ;- 84'")9!
78*0?
0
01234676894
23
6676894
23
01234676894
23
6676894
23
01234676894
23
6676894
23
01234676894
23
6676894
23