TYPE OF OCCUPANCY
Shops =4 Nos.
Security (Dwelling -1 bedroom) =1 Nos.
Accomodation (Dwelling -1 bedroom) =4 Nos.
Loading unit (Frequency of use: High and medium) for each shop
Sanitary fixtures Quantity Unit Loading unit Total Loading Unit
Water closet* 1 nos. 5 5
Water closet 1 nos. 2 2
Perenial hose 2 nos. 1 2
Lavatory* 1 nos. 2 2
Lavatory 1 nos. 2 2
Shower 1 nos. 3 3
Kitchen sink 1 nos. 5 5
Washing machine 1 nos. 2 2
Total LU 23
* Denote high usage
Total LU 5
Therefore:
REFERENCES
6. Premises Requirements :
In building permit stage, all proposed installation drawings submittals made to the
Installations Section, CSD, should be fully documented and referenced to
KAHRAMAA requirement as :
Ultimate demand including domestic and fire if exist must be determine
signatory demand will be in building permit form, see appendix form ( BPW ).
must be closer to the main ground water tank. The pipeline must be Copper
or MDPE ( 22 mm up to 54 mm Water Meters ) with the appropriate cabinet.
Those meters install in regular service cabinet, see figure ( GIS / STD / 30 /
04 ) and figure ( GIS / STD / 30 / 02 ) due to the required tie in diameter.
In case of villa or public house, that use pressurizes system the ground tanks
must be sufficient to the relevant high water consumption.
In case of public house or villa that may have ground tanks and roof tanks.
In case of villa with slope roof floor or gables, workshops the roof tank must
be install in steel stand to as elevated tank, see figure ( CSD - CSI - 09 – 01).
The designer has to select suitable water booster pump with sufficient total
head to counter for head loss due to premises height. Pump installation at the
downstream ( Outlet Discharge Point From That Tank ) with non return valve (
One Directional Valve ) that convey water to the roof storage tank of public
house, villas or building roof tank. Roof tanks capacity must be minimum 300
imp gallon for utilities buildings and 400 imp gallon for the house or villa.
9
6.4 Commercial Centers ( Flats, Offices And Shops ) :
For commercial center, there must be main water meter cabinet closed to the
tie in point, see figures ( GIS / STD / 30 / 04 ) and ( GIS / STD / 30 / 02 ).
Ground storage tanks should be sufficient for the number of flats and shops
for 48 Hours storage reserve. The down streamline discharge from water
tanks header must be minimum 54 mm that supply each corresponding shop
or flat line with non return valve.
All sub meters are 22 mm and should be at ground floor in a sub meter
cabinet and through each riser for individual roof tank, in this case, the total
number of sub meters required Should Never Exceed 10 Mtrs., otherwise,
sub meters could be in each floor.
16
The downstream discharge points of each water tanks must have 100 mm
header; the set of water booster pumps comprise minimum two working and
one stand by.
The capacity of the main water tanks designed for the sufficient required
demand for flat, shops or office with storage of 48 Hours water storage
capacity.
Ground reservoir could be approved tanks, sectional panel GRP tank or
under ground concrete tanks, see figure ( CSD - CSI - 09 - 04 ).
Cited water tank capacity must be sufficient with the estimated ultimate
demand at the BP (Building Permit) stage for review by KAHRAMAA.
17
43