This user manual provides instructions for safely installing, operating, and maintaining Sununo solar inverters manufactured by Guangzhou Sanjing Electric Co., Ltd. The manual contains information on product specifications, installation, electrical connections, LCD operation, troubleshooting, and warranty. It aims to guide qualified electricians in setting up the inverters and generating solar power.

Uploaded by

Fábio mariano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

S Aj User Manual

This user manual provides instructions for safely installing, operating, and maintaining Sununo solar inverters manufactured by Guangzhou Sanjing Electric Co., Ltd. The manual contains information on product specifications, installation, electrical connections, LCD operation, troubleshooting, and warranty. It aims to guide qualified electricians in setting up the inverters and generating solar power.

Uploaded by

Fábio mariano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31

User Manual

Add : No. 17, Xiangshan Road, Guangzhou Science City, Guangdong, China
Zip: 510663 Tel: +86 20 6660 8532 Fax: +86 20 6660 8589
E-mail: [email protected]
Web: www.saj-solar.com

Sununo-TL Series

*Note:Since Guangzhou Sanjing Electric Co.,Ltd has a policy of continuous product improvement,
it reserves the right to change design and specifications without notices.
*Edition No.:V1.2_E(MC)
Preface

Thank you for choosing SAJ solar inverter. We are happy to provide
you with first-class products and quality service.

The manual includes installation, operation, maintenance,


troubleshooting, and safety notice. As long as you follow the
instruction of this manual, you will get the professional guidance
and our wholehearted service.

Customer-orientation is our forever commitment. We hope this


“User Manual” become your good helper in solar power generation.

This manual subjects to change at regular intervals according to


customer's feedback.

Please check the latest version at www.saj-solar.com

Guangzhou Sanjing Electric Co., Ltd.

GREEN TECHNIC GREEN FUTURE


User Manual User Manual

Contents

1. Notes on This Manual ...............................................................................1 6.2 Overview of Connection Area ...........................................................21


1.1 Scope of Validation ............................................................................1 6.3 AC Side Connection ..........................................................................22
1.2 Symbols Used .......................................................................................1 6.4 DC Side Connection ..........................................................................26
1.3 Target Group ........................................................................................2 6.5 DC Side Disconnection ......................................................................31
2. Preparation ................................................................................................2 6.6 Communication and Monitoring Setting ...........................................31
2.1 System Demonstration ........................................................................2 6.6.1 Communication through RS485 ........................................................31
2.2 Safety Instructions ................................................................................3 6.6.2 Communication through Ethernet ....................................................33
2.3 Explanations of Symbols on Inverter ................................................5 6.6.3 Cable Assembly Instructions ............................................................34
3. Product Information .................................................................................6
7. LCD Operation ........................................................................................38
3.1 Overview ..............................................................................................6
7.1 LCD Display ......................................................................................38
3.2 Major Characteristics ..........................................................................7
7.2 Operation Method ...............................................................................38
3.3 Datasheet ............................................................................................8
7.2.1 Button Function .............................................................................38
4. Unpacking ................................................................................................12
7.2.2 LCD Menu ......................................................................................39
4.1 Assembly Parts ..................................................................................12
7.2.3 Set The Country First ...................................................................41
4.2 Further Information ............................................................................13
7.2.4 State ................................................................................................41
5. Installation ...............................................................................................13
7.2.5 Running-Info ..................................................................................41
5.1 Safety ..................................................................................................13
7. 2. 6 Statistic-Info ...................................................................................42
5.2 Mounting Instructions .......................................................................14
7.2.7 Current Error ..................................................................................42
5.3 Safety Clearance ...............................................................................14
5.4 Mounting Procedure .........................................................................15 7.2.8 History Errors .................................................................................43

5.5 Check Varistors ...................................................................................17 7.2.9 Set-Param .......................................................................................43

5.6 Maintenance .......................................................................................19 7.2.10 Inverter-Info .................................................................................45

5.7 Module Technology ............................................................................19 8. Recycling and Disposal ...........................................................................45


5.8 Pollution Degree ................................................................................19 9. Troubleshooting ......................................................................................46
5.9 Overvoltage Category ........................................................................19 10. Guaranty Service ...................................................................................54
6. Electrical Connection .............................................................................20 11. Contact SAJ ...........................................................................................54
6.1 Safety ..................................................................................................20 Abbreviation .................................................................................................55
User Manual User Manual

1. NOTES ON THIS MANUAL 1.3 TARGET GROUP

1.1 SCOPE OF VALIDATION Only qualified electricians who have read and fully understood all safety
regulation contained in this manual can install, maintain and repair the
This User Manual discribes instructions and detailed procedures for installing,
inverter. Operators must be aware of the high-voltage device.
operating, maintaining, and troubleshooting of the following SAJ grid-tie
inverters:
Sununo– TL1.5K, Sununo– TL2K, Sununo– TL3KB, Sununo– TL4KB, 2. PREPARATION
Sununo– TL3KA, Sununo– TL4KA, Sununo– TL5K
2.1 SYSTEM DEMONSTRATION

SU3KMTLI, SU4KMTLI, SU5KMTLI Solar energy generation systems, based on photovoltaic modules, nowadays
represent the most suitable solution to reduce the energy consumption
Please keep this manual all time available in case of emergency. produced by oil and gas.
1.2 SYMBOLS USED The solar inverter is a key device in a solar energy system. It performs the
conversion of the variable DC output of the PV modules into a clean sinusoidal
DANGER 50Hz/60Hz AC current that is then directly applied to the commercial
electrical grid or to a local grid electrical network.
DANGER indicates a hazardous situation which, if not Typically, solar inverter includes communication function to monitor
avoided, will result in death or serious injury. operating condition, firmware to update and control the grid connection.
Depending on the grid infrastructure, cabled (RS-485, CAN, Power Line
Communication, Ethernet) or cableless (Bluetooth, ZigBee/IEEE802.15.4)
WARNING networking options can be used.

WARNING indicates a hazardous situation which, if not


avoided, can result in death or serious injury or moderate
injury.

Solar
CAUTION inverter

Solar Sell
CAUTION indicates a hazardous condition which, if not
Panels
avoided, can result in minor or moderate injury.

Purchase
NOTICE
Grid

NOTICE indicates a situation that can result in potential


damage, if not avoided.
Figure 2.1

1 2
User Manual User Manual

2.2 SAFETY INSTRUCTIONS

DANGER CAUTION

·DANGER due to electrical shock and high voltage ·The PV inverter will become hot during operation.
Please don’t touch the heat sink or peripheral surface
·Do not touch the operating component of the inverter, it
might result in burning or death. during or shortly after operation.

·To prevent risk of electric shock during installation and ·Risk of damage due to improper modifications.
maintenance, please make sure that all AC and DC
terminals are plugged out. ·Never modify or manipulate the inverter or other
components of the system.
·D o not touch the surface of the inverter while the
housing is wet, it might lead to electrical shock. ·For radiation prevention, do not stay closer than 20cm
to the inverter for any length of time.
·D o not stay close to the inverter while there are severe
weather conditions including storm, lighting, etc.
·Before opening the housing, the SAJ inverter must be
disconnected from the grid and PV generator; you must
wait at least five minutes to let the energy storage NOTICE
capacitors fully discharged after disconnecting from
power source.
·Public utility only.
·The PV inverter is designed to feed AC power directly
to the public utility power grid; do not connect AC
output of the inverter to any private AC equipment.
WARNING

·The installation,service ,recycling and disposal of


the inverters must be performed by qualified personnel
only in compliance with national and local standards and
regulations.
·Any unauthorized actions including modification of
product functionality of any form may cause lethal
hazard to the operator, third parties, the units or their
property. SAJ is not responsible for the loss and deny
these warranty claims.
·The SAJ inverter must only be operated with PV
generator. Do not connect any other source of energy to
the SAJ inverter.
·Be sure that the PV generator and inverter are well
grounded in order to protect properties and persons.

3 4
User Manual User Manual

2.3 EXPLANATIONS OF SYMBOLS ON INVERTER


3.PRODUCT INFORMATION
Symbol Description 3.1 OVERVIEW
Dangerous electrical voltage
This device is directly connected to public grid, thus all Industrial design Reduced Heat Sink
work to the inverter shall only be carried out by
qualified personnel.
DANGER to life due to high electrical voltage!
There might be residual currents in inverter because of
large capacitors. Wait 5 MINUTES before you remove
the front lid.
NOTICE, danger!
This is directly connected with electricity generators
and public grid.
Danger of hot surface Sununo-TL1.5K/2K
The components inside the inverter will release a lot of
heat during operation. Do not touch metal plate housing
during operating.

An error has occurred


Please go to Chapter 9 “Troubleshooting” to remedy the
error.

This device SHALL NOT be disposed of in residential


waste
Sununo-TL3KB/4KB
Please go to Chapter 8 “Recycling and Disposal” for
proper treatments.
Without Transformer
This inverter does not use transformer for the isolation
function.

Certified safety
The inverter complies with the requirement of the
Equipment and Product Safety Act in Europe. Sununo-TL 3KA/4KA/5K
CE Mark
Equipment with the CE mark fulfills the basic
requirements of the Guideline Governing Low-Voltage
and Electro-magnetic Compatibility.

SAA Mark
The inverter complies with the requirement of Equipment
and Product Safety Act in Australia.

ATTENTION!
No unauthorized perforations or modifications
Risk of electric shock! Only
authorized personnel are Any unauthorized perforations or modifications are SU3KMTLI/SU4KMTLI/SU5KMTLI
allowed to do disassembly,
modification or maintenance.
Any resulting defect or
strictly forbidden, if any defect or damage Figure 3.1
damage (device/person) is not
covered by SAJ guaranty.
(device/person) is occurred, SAJ shall not take any
responsibility for it.

5 6
User Manual User Manual
3.3 DATASHEET
3.2 MAJOR CHARACTERISTICS Type Sununo-TL1.5K Sununo-TL2K
Input (DC)
Max. DC Power [W] 1800 2300
SAJ grid - tie solar inverter has following characteristics which make SAJ Max. DC Voltage [V] 480
grid - tie solar inverter “High Efficiency, High input voltage with more PV MPPT Voltage Range [V] 120-384
panels in series.” MPPT Voltage Range[V](Full Load) 164-384 190-384
DC Nominal Voltage [V] 360
• High input voltage with more PV panels in series. Start Voltage [V] 150
• Two independent MPP trackers for flexible configuration and easy Min. DC Voltage [V] 100
Max. DC Current Input [A] 11 12
installation. Number of DC Connection Sets 1
• Ultra-high MPP tracking efficiency for full power range. Number of MPP Trackers 1
DC Switch Optional
• Transformerless design. Output (AC)
• Multi communication interfaces,including RS485,Ethernet RJ45,Wi-Fi. Rated AC Power [W] 1500 2000
Max. AC Power [W] 1650 2000
• Multi language display. Rated AC Current [A] 6.5 8.7
• Easy LCD operation with multi-language display. Max. AC Current [A] 8.5 11.0
Norminal AC Voltage/Range 220V, 230V, 240V/180V-280V
• DC switch (optional). Grid Frequency/Range 50Hz, 60Hz/ ±5Hz
• High-grade power components. Power Factor(cos φ) >0.99 [full load]
AC Current Distortion (THD) < 2%
• Small size, light weight, easy installation. Consumption at Night [W] <0.2
Consumption at Standby [W] 6
Efficiency
Besides, following functions methods are integrated in SAJ grid - tie solar Max. Efficiency 97.4% 97.4%
inverter: Euro Efficiency (at 360Vdc) 96.5% 96.7%
MPPT Accuracy >99.5%
Protection
• Internal overvoltage protection Internal Overvoltage Protection Integrated
DC Insulation Monitoring Integrated
• DC insulation monitoring DC Side Varistors Integrated
• DC side varistor Direct Current Monitoring Integrated
Ground Fault Current Monitoring Integrated
• Ground fault protection Grid Monitoring Integrated
• Grid monitoring AC Short Current Protection Integrated
Thermal Protection Integrated
• Ground fault current monitoring Anti-island protection monitoring AFD
• Anti-islanding protection Interface
AC Connection Terminals
DC Connection MC4/H4
LCD Display LCD(16x2 Characters, Backlight) & LED(3 Lights)
Display Language Multi Language
Datalogger & Communication 2*RS485(Standard),Wi-Fi/Ethernet(Optional)
General Data
Isolation Transformerless
Operating Temperature Range -25°C to +60°C [45°C to 60°C with derating ]
Cooling Method Natural Convection
Ambient Humidity 0% to 98% Non-condensing
Site Altitude above Sea Level Up to 2000m
Noise Emission ( dB A) <40
IP Protection IP65 [Indoor or Outdoor Installation]
Mounting Rear Panel
Dimensions (WxHxD) [mm] 415*313*140
Weight [kg] 11
Standard Warranty (Year) 5 / 10 / 15 / 20 / 25 [Optional]
Safety Class Compliance As3100,IEC62109-1/-2
EMC Compliance EN61000-6-2,EN61000-6-3,EN61000-3-2,EN61000-3-3
Grid Protection Compliance VDE 0126-1-1/A1,VDE 4105,G83,RD1699, C10/11,
AS4777.3,EN50438,CGC/CF004

7 8
User Manual User Manual

Type Sununo-TL3KB Sununo-TL4KB Type Sununo-TL3KA Sununo-TL4KA


Input (DC) Input (DC)
Max. DC Power [W] 3400 4500 Max. DC Power [W] 3200 4200
Max. DC Voltage [V] 550 Max. DC Voltage [V] 550
MPPT Voltage Range [V] 125-440 MPPT Voltage Range [V] 125-440
MPPT Voltage Range[V](Full Load) 200-440 225-440 MPPT Voltage Range[V](Full Load) 200-440
DC Nominal Voltage [V] 360 DC Nominal Voltage [V] 360
Start Voltage [V] 150 Start Voltage [V] 150
Min. DC Voltage [V] 100 Min. DC Voltage [V] 100
Max. DC Current Input [A] 17 20 Max. DC Current Input A/Input B[A] 15/15 15/15
Number of DC Connection Sets 2 Number of DC Connection Sets 2
Number of MPP Trackers 1 Number of MPP Trackers 2
DC Switch Optional DC Switch Optional
Output (AC) Output (AC)
Rated AC Power [W] 3000 4000 Rated AC Power [W] 3000 4000
Max. AC Power [W] 3300 4400 Max. AC Power [W] 3000 4000
Rated AC Current [A] 13.0 17.4/16 1 Rated AC Current [A] 13.0 17.4/16 1
Max. AC Current [A] 15.0 20.0/16 1 Max. AC Current [A] 15.0 20.0/16 1
Norminal AC Voltage/Range 220V, 230V, 240V/180V-280V Norminal AC Voltage/Range 220V, 230V, 240V/180V-280V
Grid Frequency/Range 50Hz, 60Hz/ ±5Hz Grid Frequency/Range 50Hz, 60Hz/ ±5Hz
Power Factor(cos φ) >0.99[full load] Power Factor(cos φ) >0.99 [full load]
AC Current Distortion (THD) < 2% AC Current Distortion (THD) < 2%
Consumption at Night [W] <0.2 Consumption at Night [W] <0.2
Consumption at Standby [W] 6 Consumption at Standby [W] 6
Efficiency Efficiency
Max. Efficiency 97.7% 97.7% Max. Efficiency 97.6% 97.6%
Euro Efficiency (at 360Vdc) 97.1% 97.1% Euro Efficiency (at 360Vdc) 96.8% 96.8%
MPPT Accuracy >99.5% MPPT Accuracy >99.5%
Protection Protection
Internal Overvoltage Protection Integrated Internal Overvoltage Protection Integrated
DC Insulation Monitoring Integrated DC Insulation Monitoring Integrated
DC Side Varistors Integrated DC Side Varistors Integrated
Direct Current Monitoring Integrated Direct Current Monitoring Integrated
Ground Fault Current Monitoring Integrated Ground Fault Current Monitoring Integrated
Grid Monitoring Integrated Grid Monitoring Integrated
AC Short Current Protection Integrated AC Short Current Protection Integrated
Thermal Protection Integrated Thermal Protection Integrated
Anti-island protection monitoring AFD Anti-island protection monitoring AFD
Interface Interface
AC Connection Terminals AC Connection Terminals
DC Connection MC4/H4 DC Connection MC4/H4
LCD Display LCD(16x2 Characters, Backlight) & LED(3 Lights) LCD Display LCD(16x2 Characters,Backlight) & LED(3 Lights)
Display Language Multi Language Display Language Multi Language
Datalogger & Communication 2*RS485(Standard), Wi-Fi/Ethernet(Optional) Datalogger & Communication 2*RS485(Standard), Wi-Fi/Ethernet(Optional)
General Data General Data
Isolation Transformerless Isolation Transformerless
Operating Temperature Range -25°C to +60°C [45°C to 60°C with derating ] Operating Temperature Range -25°C to +60°C [45°C to 60°C with derating ]
Cooling Method Natural Convection Cooling Method Natural Convection
Ambient Humidity 0% to 98% Non-condensing Ambient Humidity 0% to 98% Non-condensing
Site Altitude above Sea Level Up to 2000m Site Altitude above Sea Level Up to 2000m
Noise Emission ( dBA) <40 Noise Emission ( dBA) <40
IP Protection IP65 [Indoor or Outdoor Installation] IP Protection IP65 [Indoor or Outdoor Installation]
Mounting Rear Panel Mounting Rear Panel
Dimensions (WxHxD) [mm] 450*375*177 Dimensions (WxHxD) [mm] 525*425*175
Weight [kg] 21 Weight [kg] 23
Standard Warranty (Year) 5 / 10/15/20/25 [Optional] Standard Warranty (Year) 5 / 10/15/20/25 [Optional]
Safety Class Compliance AS3100, IEC62109-1,IEC62109-2 Safety Class Compliance AS3100, IEC62109-1,IEC62109-2
EMC Compliance EN61000-6-2,EN61000-6-3,EN61000-3-2,EN61000-3-3 EMC Compliance EN61000-6-2,EN61000-6-3,EN61000-3-2,EN61000-3-3
Grid Protection Compliance VDE 0126-1-1/A1,VDE 4105, G83,RD1699, C10/11, Grid Protection Compliance VDE 0126-1-1/A1,VDE 4105, G83,G59,RD1699, C10/11,
AS4777.3,EN50438,CGC/CF004 AS4777.3,EN50438,CGC/CF004
Remarks: Meet the grid standard AC current per phase not exceeding 16A. Remarks: Meet the grid standard AC current per phase not exceeding 16A.

9 10
User Manual User Manual

Type Sununo-TL5K * Here indicastes there is another unit [VA] of these data which is applied to C10/11.
Input (DC)
Max. DC Power [W] 5200
Max. DC Voltage [V] 550
** Sununo-TL5K/4KA/3KA has different dimensions for enclosure as
MPPT Voltage Range [V] 125-440 SU5KMTL1、SU4KMTL1、SU3KMTL1,detail see table documents.
MPPT Voltage Range[V](Full Load) 200-440
DC Nominal Voltage [V] 360
Start Voltage [V] 150
Min. DC Voltage [V] 100
Max. DC Current Input A/Input B[A] 16 / 16
Number of DC Connection Sets 2 4. UNPACKING
Number of MPP Trackers 2
DC Switch Optional
Output (AC) 4.1 ASSEMBLY PARTS
Rated AC Power [W] 5000
Max. AC Power [W] 5000
After you receive the SAJ grid-tie solar inverter, please check if there is any
Rated AC Current [A] 21.7 damage on the carton. Also, please check the inside completeness and for any
Max. AC Current [A] 25 visible external damage on the inverter or any accessories. Contact your dealer
Norminal AC Voltage/Range 220V, 230V, 240V/180V-280V
Grid Frequency/Range 50Hz, 60Hz/±5Hz if anything is damaged or missing.
Power Factor(cos φ) >0.99 [full load]
AC Current Distortion (THD) < 2%
Consumption at Night [W] <0.2
Consumption at Standby [W] 6
Efficiency
Max. Efficiency 97.71%
Euro Efficiency (at 360Vdc) 97.1% A B C D
MPPT Accuracy >99.5%
Protection
Internal Overvoltage Protection Integrated
DC Insulation Monitoring Integrated
DC Side Varistors Integrated
Direct Current Monitoring Integrated
Ground Fault Current Monitoring Integrated E F G H I
Grid Monitoring Integrated
AC Short Current Protection Integrated Figure 4.1
Thermal Protection Integrated
Anti-island protection monitoring AFD
Object Quantity Description
Interface
AC Connection Terminals A 1 SAJ grid-tie solar inverter
DC Connection MC4/H4 B 1 Rear panel
LCD Display LCD(16x2 Characters, Backlight) & LED(3 Lights)
Display Language Multi Language 1 sets DC connector (for Sununo-TL1.5K/2K)
Datalogger & Communication 2*RS485(Standard), Wi-Fi/Ethernet(Optional) C
General Data DC connector (for Sununo-TL3KB/4KB/3KA/4KA/5K,
2 sets
SU3KMTLI, SU4KMTLI, SU5KMTLI)
Isolation Transformerless
Operating Temperature Range -25°C to +60°C [45°C to 60°C with derating ] D 2 RS485 connector(if attached)
Cooling Method Natural Convection M6×50 Expansion screw
E 6
Ambient Humidity 0% to 98% Non-condensing
Site Altitude above Sea Level Up to 2000m F 6 Expansion tube
Noise Emission ( dBA) <40 M4×12 Cylinder head screw and Lock washer
IP Protection IP65 [Indoor or Outdoor Installation]
Mounting Rear Panel G (Sununo-TL1.5K/2K/3KB/4KB)
4
Dimensions (WxHxD) [mm] 525*425*190 M5×12 Cylinder head screw and Lock washer
Weight [kg] 26 (Sununo-TL3KA/4KA/5K, SU3KMTLI, SU4KMTLI,SU5KMTLI)
Standard Warranty (Year) 5 / 10 /15/20/25 [Optional]
Safety Class Compliance AS3100, IEC62109-1,IEC62109-2 H 1 User manual, including installation guide
EMC Compliance EN61000-6-2,EN61000-6-3,EN61000-3-2,EN61000-3-3 I 1 Warranty card
Grid Protection Compliance VDE 0126-1-1/A1,VDE 4105,G83,G59,RD1699,
C10/11,AS4777.3,EN50438,CGC/CF004

11 12
User Manual User Manual
4.2 FURTHER INFORMATION 5.2 MOUNTING INSTRUCTIONS
15

If you have any further questions concerning the type of accessories or


installation, please check our website www.saj-solar.com or contact our
service hotline.
Bad cooling
Figure 5.1
·SAJ grid - tie solar inverter is cooled by natural flow of air behind the
5. INSTALLATION inverter.
·SAJ grid - tie solar inverter is designed for installation both indoors and
5.1 SAFETY outdoors.
·Please only mount the inverter in the direction as illustrated above.
·Installation of the inverter in the vertical direction is recommended.
DANGER ·Tilted backward max.15 degree is allowed.
·Never install the inverter forward, horizontally or even upside down.
·For the convenience of checking the LCD display and possible maintenance
·DANGER to life due to potential fire or electricity activities, please install the inverter at eye level.
shock. ·Make sure the wall you selected is strong enough to handle the screws and
the weight of the inverter.
·D o not install the inverter near any inflammable or ·Ensure the inverter is properly fixed to the rear panel.
explosive items. ·Installing the inverter under strong sunshine is not recommended; the excess
heating might lead to power reduction.
·This inverter will be directly connected with HIGH ·The ambient temperature of installation site should be between - 25 °C and
VOLTAGE power generation device; the installation +60 °C ( between -13 °F and 140 °F ) .
must be performed by qualified personnel only in ·Make sure enough ventilation at installation spot; insufficient ventilation
compliance with national and local standards and
regulations. may affect the operating performance of the inside electronic components,
even shorten the life span of the device.

NOTICE 5.3 SAFETY CLEARANCE


To make sure the ventilation of the installation spot, if there are multiple SAJ
grid-tie solar inverters installed in the same area, the following safety
·NOTICE due to the inappropriate or the harmonized clearance shall be followed for proper ventilation conditions.
installation environment may jeopardize the life span of

30cm
the inverter.
Direction Minimum Clearance
·Installation directly exposed under intensive sunshine Above 30 cm 5cm 30cm 30cm
is not recommended. Below 50 cm
Side 30 cm
·The installation site must have good ventilation

50cm
Front 5 cm
condition. Figure5.2

13 14
User Manual User Manual
5.4 MOUNTING PROCEDURE 2. According to the marks, drill 6 holes in the wall (in conformity with position
marked in above picture), and then place expansion tubes in the holes using a
1. Use the rear panel in the package as a drilling template and mark the rubber hammer.
positions of the drill holes, as illustrated below.
346
280

230
268

2-φ8

Figure 5.4
Sununo-TL1.5K/2K 3. Mount the rear panel.
280
Wring six screws into the expansion tubes and tightly mount the rear
8
2-φ
panel on the wall.
8
346
280 16
294
304
230

Figure 5.5
Sununo-TL3KB/4KB Sununo-TL3KA/4KA 4. Carefully attach the inverter to the rear panel according to the position of the
SU3KMTLI/SU4KMTLI screws.Make sure the backside of the inverter is closely against the rear panel.
290
When two people transport the inverter, make sure each one use the hand grip in
9
2-φ right position as illustrated in the picture.
9

19
294

Notch

Figure 5.6
5. Pay attention to the four notches cut in both flanks of heat sink (as illustrated
in above picture), which should be placed in corresponding hooks from the rear
panel. Make sure that the heat sink and the rear panel are buckled together and
Sununo-TL/5K
the inverter is tightly attached to the rear panel. And tighten the screws with
SU5KMTLI
5.9N·m torque.
Figure 5.3

15 16
User Manual User Manual
6. Please carefully check the accessories and original carton to make sure 2. There are 2 varistors for Sununo-TL1.5K/2K/3KB/4KB and 4 varistors for
during the installation every necessary part is used and nothing is missing. Sununo-TL 3KA/4KA/5K/SU3KMTLI/SU4KMTLI/SU5KMTLI in the left side.

Sununo-TL1.5K/2K Sununo-TL3KB/4KB

Figure 5.7

Figure 5.9

5.5 CHECK VARISTORS


Sununo-TL 3KA/4KA/5K
If one or more of the varistors might be out of function, please check or replace
SU3KMTLI/SU4KMTLI/SU5KMTLI
the varistors according to the following steps:
3. Remove and install the varistors
1. Loosen all 4 captive screws of the removable front lid. Right after the
4 captive screws are removed, please keep them at a distance. Lift the lid
upwards and remove it. Remove:

First use specified tool and insert it to three holes


in the left side of the varistor, then press it to the
end.

Pull the varistor out.


Figure 5.10
Install:

Use specified tool and insert it to three holes in


the left side of the varistor, then press it to the
end.
Figure 5.8
Press the varistor in.

Figure 5.11

17 18
User Manual User Manual
4. Put the lid back and re-screw all 4 screws, make sure the lid is tightening to 6. ELECTRICAL CONNECTION
the inverter.
6.1 SAFETY
5.6 MAINTENANCE

Ask your installer to check for proper inverter operation at regular


intervals. DANGER

5.7 MODULE TECHNOLOGY


·DANGER to life due to potential fire or electricity
SAJ grid - tie solar inverters provide the optimal solution for any module. shock.
Transformerless-type SAJ grid-tie solar inverters are designed for ungrounded
modules, especially for the crystalline silicon photovoltaic modules, such as ·With the inverter powered, comply with all prevailing
monocrystalline silicon and polycrystalline silicon. While the thin-film national regulations on accidents prevention.
modules are not suitable for SAJ transformerless inverters.
·This inverter will be directly connected with HIGH
VOLTAGE power generation device; the installation
5.8 POLLUTION DEGREE must be performed by qualified personnel only in
compliance with national and local standards and
SAJ grid-tie solar inverters comply with the pollution degree 3. regulations.

5.9 OVERVOLTAGE CATEGORY


NOTICE
Overvoltage category III applies to SAJ grid - tie solar inverter AC
terminals. For PV circuits in general, Overvoltage Category II is assumed. ·Electrical connections shall be carried out in
accordance with the applicable regulations, such as
conductor sections, fuses, earthing protection.

19 20
User Manual User Manual

6.2 OVERVIEW OF CONNECTION AREA Bottom:


A B C E
Bottom: A B C E

F D
F D

Sununo-TL3KA/4KA/5K/SU3KMTLI/SU4KMTLI
Sununo-TL1.5K/2K SU5KMTLI /Figure 6.1
Bottom:
Object Description
A B C E
A DC switch to turn off the inverter manually(optional)
B DC input
C Plug for connecting the RS485 communication module
D Plug for connecting Ethernet communication module (optional)
E AC output
F Heat sink

6.3 AC SIDE CONNECTION

NOTICE

F D ·The cross-section of the AC cable should be more than 12


AW G f o r S u n u n o - T L 1 . 5 K / 2 K a n d 1 0 AW G f o r
Sununo-TL3KB/4KB/3KA/4KA/5K,SU3KMTLI
SU4KMTLI/SU5KMTLI and Cable Rangeφ9-14mm.
Sununo-TL 3KB/4KB

21 22
User Manual User Manual

2. Screw off and separate each component of AC connector as follows.


DANGER

·DANGER to life due to potential fire or electricity


shock.
·Never connect or disconnect the connectors under
load.

Figure 6.3
Integrated RCD and RCM
3. Pass the cable through each component from right to the left as follows.
The SAJ grid - tie solar inverter is equipped with integrated RCD (Residual Tighten the screws with 3.0N·m torque.
Current Protective Device) and RCM (Residual Current Operated Monitor).
The current sensor will detect the volume of the leakage current and compare it
with the pre-set value. If the leakage current is above the permitted range, the
RCD will disconnect the inverter from the AC load.

The SAJ grid-tie solar inverter will probably cause a DC current in the external
protective earthing conductor. Where a residual current-operated protective
(RCD) or monitoring (RCM) device is used for protection in a case of direct or
indirect contact, only an RCD or RCM of Type B is allowed on the supply side
of this product. Provided an AC current or pulse current is caused in the
external protective earthing conductor, an RCD or RCM of Type AC or Type A Figure 6.4
as alternative can be permitted putting into use. 4. Use a screw driver and loose the three screws at the side of the straight plug.
Then insert the stripped N, L and PE cable accordingly to the corresponding
position and fully tighten the screws.
Assembly Instructions:

1. Strip the cable with the length 0.276 inches (9/32″) - (7mm) and please be
careful NOT to nick conductors.

Cable
Figure 6.5
0.276 inches(9/32″)-(7mm)
Connect L, N and protective conductor ( ) to the AC terminal in
Figure 6.2 accordance with the label.

23 24
User Manual User Manual

To do this , the insulated earthing conductor must be 5mm longer than the
insulated L and N conductors! L and N must not be swapped.The ground wire
shall be larger than phase conductor.

Sununo-TL3KA/4KA/5K
Figure 6.6

5. Aim the terminals on the straight plug to the holes of the grommet, and then
compress them together.
Sununo-TL1.5K/2K

Figure 6.7

6. Finally, connect the straight plug to the AC terminal on inverter. Pay


attention to the polarity of the terminals to avoid wrong connecting.

6.4 DC SIDE CONNECTION

Sununo-TL 3KB/4KB NOTE:


The cable length on DC side should not exceed 30 m.

25 26
User Manual User Manual

For Sununo – TL 1.5K/2K/3KB/4KB, there is just one MPP Tracker. These


single MPPT inverters require same type module with same quantity, identical NOTICE
alignment and tilt.
·Before electrical connection setup, installer shall
For Sununo–TL3KA/4KA/5K,SU3KMTLI/SU4KMTLI/SU5KMTLI, there are
make sure the inverter is isolated and disconnected from
two MPP Trackers for the two string inputs. Unlike the traditional single MPPT
the PV source and AC grid.
inverters which require same type module, same quantity, identical alignment
·The inverter may only be operated with PV generators
and tilt, the multi-MPPT SAJ grid-tie inverters can deal with different solar
modules, different quantity, different alignment and tilt, thus can withstand (Class A PV modules according to IEC 61730 and
harshest environmental conditions. cabling) of protection class II. Do not connect any
sources of energy other than PV modules to the inverter.
Max. DC Max.DC
Inverter Type MPP Tracker Max.DC Voltage
Power (W) Current/per string(A)
Sununo-TL1.5K 1800 11 A
Sununo-TL2K 480V
2300 12 A NOTICE
Sununo-TL3KB 1 3400 17 A
Sununo-TL4KB 4500 20 A No mixed connections between input zones(for Sununo-
Sununo-TL3KA,
SU3KMTLI 3200 15A/15A TL 3KB/4KB and Sununo-TL3KA/4KA/5K,
Sununo-TL4KA, SU3KMTLI/SU4KMTLI/SU5KMTLI).
4200 15A/15A
SU4KMTLI
550V ·For instance, if the positive pole of a string is
2
Sununo-TL5K,
5200 16A/16A connected at input zone 1 and the negative pole at input
SU5KMTLI
zone 2, this is called a mixed connection.

·Only connect strings at one input zone and never mix


the input zones 1 and 2!
DANGER

·DANGER to life due to potential fire or electricity shock. The DC connectors come pre-assembled and the caps are loose. The whole
·Never connect or disconnect the connectors under load. connector will include the male side and female side as showed below:

NOTICE

·If only one string input is used for DC connection,


please use the sealing plug to seal the left DC input set to
ensure the inverter IP 65 protection. Male side connector (M) Female side connector (F)

Figure 6.8

27 28
User Manual User Manual
Assembly Instructions: Cable requirements:
Cable Size Cable pull – out force requirement
1. Strip the cable with the length 0.276 inches (9/32")-(7mm) and please be
2.5 mm 2 Min. 310 N (70 Lbs)
careful NOT to nick conductors.
4 mm2 Min. 400 N (90 Lbs)
6 mm2 Min. 450 N (100 Lbs)
10 mm 2 Min. 500 N (110 Lbs)

Cable
4. Insert contact cable assembly into back of male and female connector. A
0.276 inches(9/32")-(7mm) “click” should be heard or felt when the contact cable assembly is seated
Figure 6.9 correctly. See below figures.
Use specified strip tool in this step. Adjust the strip stopper and put the cable in
corresponding notch to strip the length of 7mm. See below figures.

Male side connector (M)


Figure 6.15

Female side connector (F)


Figure 6.10 Figure 6.11
Figure 6.16
2. Insert stripped cable into contact barrel and insure all conductor strands are
captured in the contact barrel and the conductors are visible in the contact 5. Wrest the cap by using the torque of 2.6~2.9N·m.
barrel observation hole. See below figures.
Pin contact Socket contact

Barrel observation hole Barrel observation hole Figure 6.17


Conductor should be visible Conductor should be visible

Figure 6.12 Figure 6.13


6. After wrested the cap tightly, align the 2 half connectors and mate them
together by hand until a “click” is heard or felt.
3. Crimp contact barrel by using the hex crimping die. ensure it is fixed.See
below figures.
Crimped pin contact Crimped socket contact

Figure 6.14 Figure 6.18

29 30
User Manual User Manual

6.5 DC SIDE DISCONNECTION RS485 Multi-point Monitoring


Only qualified electricians who have fully understood all safety regulation To realize multi-point monitoring of SAJ solar inverter, we offer
contained in this manual can disconnect and maintain the DC connectros. 2configurations as shown in below:
(1) PC Multi-point Monitoring

6.6 COMMUNICATION AND MONITORING SETTING


SAJ solar inverter offers 2 communication solutions for users: RS485
(standard) and Ethernet (optional). All the SAJ products involved in the solar
monitoring system are:
Sununo-TL series solar inverters: single phase transformerless on-grid solar
inverters, such as Sununo-TL1.5K/2K/3KA/4KA/5K,SU3KMTL1/
SU4KMTL1/SU5KMTL1
SAJ Logger: data logger for local monitoring and maintenance of solar
power plants,can be registered through SAJ Web Portal.
SAJ Web Portal: free monitoring application through web, iPhone,iPAD and
Android App. Internet access must be ensured for the inverter network
configuration before SAJ Web Portal service registration.
SAJ Web Server: the local web monitoring application through web browser built
Figure 6.20 PC Multipoint Monitoring
in all SAJ inverters.For more detail information, please refer to SAJ Monitoring
Solution through www.saj-soalr.com
(2) SAJ Logger Multipoint Monitoring
Note : The text lines in the following Figures indicates communication cable

6.6.1Communication through RS485


RS485 can be used for both single-point and multi-point communication. At
present, RS485 can communicate and monitor up to 32-inverters.

RS485 Single-point Monitoring


Communication of a single inverter is shown in Figure1 as below. Users can
connect inverter's RS485 port to PC through RS485/232 Module.

Figure 6.19 Communication of a Single Inverter Figure 6.21 PC + SAJ Logger Multipoint Monitoring

31 32
User Manual User Manual
Connection Procedures 6.6.3 Cable Assembly Instructions
1、Inverter 1 connects to Inverter 2 through RS485 cable; Inverter 2 connects Cable:All cables mentioned in this Manual are 5E Shielded Cable, as shown in
to Inverter 3 through RS485 cable. In the same way to connect all inverters. Figure6.23:
2、Inverter 1 connects to RS485/232 Module through RS485-M cable or
connects to SAJ Logger through RS485-C cable.
3、Connect RS485/232 Module to PC's RS232 port, or connect SAJ Logger
to PC through Router. Shield layers
4、Open the internal web server of SAJ logger for plant and inverter monitoring.

6.6.2 Communication through Ethernet RJ45


When users choose Ethernet communication solution, users can access to
Inverter real-time information through Inverter IP address, or through SAJ
Logger IP address. The configuration is shown in Figure6.22 as below:
Four STP

Figure 6.23 5E Shielded Cable

Terminals:According to different communication solutions, users may need


at least one of the below terminals. They are 3Pin Connector and RJ45 Plug as
shown in Figure6.24 and Figure6.25.

Figure 6.22 Communication through Ethernet RJ45 Figure 6.24 3Pin Connector

33 34
User Manual User Manual

RS485-M cable

RS485-M cable is used to connect Inverter and RS485/232 Module. Users only
use 2 wires of the 5E cable to connect to the Connector and the RS485/232
Module according to Table 2. Make sure they are fixed well.

Wire Connector No. RS485 /232 Module


Figure 6.25 RJ45 Plug and Its Pin Number
Blue & White 1 D-/B
Tools
When making a communication cable , the professional tools shown in Blue 2 D+/A
Figure6.26 below are needed.

Table 2 RS485-M Cable Assembly Order

RS485-L cable

RS485-L cable is used to connect Inverter and SAJ Logger when inverters are
monitored via RS485. One end of the cable uses 3Pin Connectors, and the
Figure 6.26 Tools for making a communicate cable other end uses RJ45 Plug. Connection is shown in Table 3 as below:

RS485 cable Wire Connector No. RJ45 plug's Pin NO


When Inverters use RS485 for monitoring, users need RS485 cables to connect
Blue & White 1 5
between Inverters for multipoint monitor. In this case, we provide Connection
by using the 3Pin Connector as shown in Figure6.24. Blue 2 4
Each end of the cable should be connected to the Connector according to Table
1. Make sure they are fixed well.
Table 3 RS485-L Cable Assembly Order

Connector No . Wire

1 Blue & White

2 Blue

3 Metal shielded wire

Table 1 RS485 Cable Assembly Order

35 36
User Manual User Manual
RJ45 cable
RJ45 cable is the standard cable for Ethernet communication. Users can buy 7. LCD Operation
this cable in stores, or can assemble RJ45 cable as below:
Each end of the cable must be connected to RJ45 Plug according to Table 4. 7.1 LCD DISPLAY
Make sure they are fixed well.

RJ45 plug's Pin NO One RJ45 plug's The other RJ45 plug's
Wire color Wire color

1 White & Green White & Orange ABC D EF


Figure 7.1

Object Description
2 Green Orange A LED light – POWER. Yellow light shines when the inverter is energized.
LED light-FAULT. Red light shines when fault occurs in the inverter and
B automatically goes out when the fault is removed.

3 White & Orange White & Green C LED light-RUN. Green light flashes when the inverter runs good.
D ▼/ESC
E ▲/ENT
4 Blue Blue LCD screen for viewing the running data & recorded information,
F
and setting parameters.

5 White & Blue White & Blue 7.2 Operation Method


7.2.1 BUTTON FUNCTION

SAJ grid-tie solar inverter offers two buttons for user to look up running
6 Orange Green information and configure parameters. The two buttons can be reused.
Name Operation Description
Press less than It indicates the“▼ ”button, which can move the cursor
7 White & Brown White & Brown one second downwards in the menu, or decrease the setting value.
▼/ ESC
Press more than It indicates the “ ESC ” button, which can return to
one second parent menu or cancel the demand.
8 Brown Brown
Press less than It indicates the “▲” button, which can move the cursor
one second upward in the menu, or increase the setting value.
▲/ ENT
Press more than It indicates the “ ENT ” button, which can enter
Table 4 RJ45 Cable Assembly Order one second submenu or confirm the command.

NOTE: The back light of LCD screen will go out to save power if there is no
button operation in one minute. You can activate it by pressing any button.

37 38
User Manual User Manual

2011/11/09 18:17
State Normal
7.2.2 LCD Menu (Take Sununo-TL3KA as an example)
P-ac 1221W
V-grid 220.0V
E-Today
I-grid 5.50A Enter 0.5kWh
F-grid 49.99Hz
Enter E-Month 692.3KWh
V-PV1 350.2V Enter 04/01 15.4 KWh
UP I-PV1 2.37A ……
> Running-Info
Statistic-Info V-PV2 349.7V
If the country DOWN E-Year 8523.7KWh
E-today 0.5kWh I-PV2 2.63A Enter Jan. 552.1KWh
hasn't been set
P-ac 1221W ……
Temp. 31.2℃
On-Grid Inverter Please Set The E-Total 19812.5 KWh
Enter 2012 9125.3KWh
Sununo-TL3KA Country First > Current Error
Enter ……
History Errors > E-Today
2011/11/09 18:17 E-Month T-Today
Enter 0.5h
UP
State Normal UP
> E-Year
Enter
E-Total T-Total
DOWN DOWN Enter
> Set-Param 5418.1h
> E-Today
Inverter-Info E-Total
Error Code:03
Enter Grid Freq Err S
Error Code:02
Enter Grid Volt Err S ..............
..............
Enter ..............
Enter
>12/08/26 17:52
By pressing the key Enter 12/08/07 10:05
Please Enter > Australia
UP or Down, you .............. Enter
Password:xxxxxx
Enter Austria
can get access to UP ..............

DOWN
different item of the > Language
same level menu Date
> Time
Grid Compliance Please Enter Please Enter New
Enter Enter
Password:xxxxxx Password:xxxxxx
>Ethernet
Enter UP Wifi Enter Machine Type
Sununo-TL3KA
> Change Password
DOWN
Clear Errors Enter Grid Compliance
Belgium
> Clear Energy
Factory Setting Enter SN:13020G1101DE0
You can access into the next level menu by pressing ENTER KEY 0500
PC:SU3KMTL1DE6
> Machine Type Enter
You can go back to the former level menu by pressing ESC KEY E0000
Grid Compliance
UP

Enter > SN Code MCUF: V01.00


Product Code UP SCUF : V01.01
DOWN
Enter
DOWN
> Firmware Ver DBF: EV1.00
Portal ID

39 40
User Manual User Manual

7.2.3 Set The Country First 7.2.6 Statistic-Info


When the solar inverter begins to run for the first time, please configure the “Statistic-Info” includes some statistics information. All the data are explained
country of usage, and the inverter LCD will display as below:
in the following table.
Please Set The
Country First Data name Explanation Unit
Please press the "ENT" button, LCD will show the countries for option. Users E-Today The generated energy of current day kWh
can press "▼ " or"▲ " to move the cursor">"to select the correct country and E-Month
Total generated energy of the month and the
kWh
press "ENT" button to confirm the selection. daily generated energy of current month
Note: The configuration of the country of usage must be set before inverter E-Year Total generated energy of current year and the
kWh
monthly generated energy of current year.
starts to run for its first time, otherwise the inverter will not on-gird.
The total energy generated by the inverter and
If users choose an incorrect country, it could lead to the inverter not running E-Total total generated energy of the year. kWh
properly or reporting error frequently. Please make sure you select the correct T-Today The operating time of current day h
country. User can enter the menu of "Inverter-Info->Grid Compliance" to
check whether the setting is correct. T-Total Total hours of operation time h

If users can not fond out the corrsponding country,please stop the setting and
contact the after sales for confirmatior.
7.2.7 Current Error
7.2.4 State
If the country has been set , the LCD shows the machine type when the inverter If any of the following messages occurs in LCD Screen, and the status LED
is started up, then it automatically displays the inverter operation status: Light “ Fault” is on, there is one or more error that has been detected by SAJ
Normal,Wait, Shutdown, Fault, P-Fault, Update. grid-tie solar Inverter.
Data name Explanation
Normal The inverter in normal (function) operation Please go to Chapter 9 “TROUBLESHOOTING” for further information
Wait The inverter in stand-by state
Shutdown The inverter stops working Error Explanation Type of Error
Fault A fault occurs during operation Consistent Err S Consistent Error (Slave**)
P-fault A fault occurs repeatedly and has reached a certain times during Grid Volt Err S Grid Voltage Error (Slave)
operation
Grid Freq Err S Grid Frequency Error (Slave)
Update The state of updating firmware
Grid Loss Err S Grid Loss Error (Slave)
Press “ENT” to enter the second level menus.
Bus Over Volt S Bus Over voltage(Slave)
> Running-Info > Current Error > Set-Param
S tatistic-Info History Errors Inverter-Info GFCI Err S GFCI Error (Slave)
Over-TEMP. S Over-temperature (Slave)
7.2.5 Running-Info
PV Over Volt S PV-Overvoltage (Slave)
1.The “Running-Info” includes real time system data. All the data are explained in Error
the following Table. AC Over Current M AC-Overcurrent (Master*)
Electrical Real Time Data ( Running-Info ) Isolation Err M Isolation Error (Master)
Data name Explanation Unit Grid Volt Err M Grid Voltage Error (Master)
P-ac Output AC power W Grid Freq Err M Grid Frequency Error (Master)
V-grid Grid voltage V V-Grid 10m Err M Grid Voltage 10min Error (Master)
I-grid Output AC current A DCI Err DCI Error (Master)
M
F-grid Grid frequency Hz
GFCI Err M GFCI Error (Master)
V-PV1 DC Voltage of PV array1 V
I-PV1 DC Current of PV array1 Over-TEMP. M Over-temperature (Master)
A
V-PV2* DC Voltage of PV array2 V Other Err S Other Error (Slave)
Permanent
I-PV2* DC Current of PV array2 A Int. Comm Err S Internal Communication Error (Slave)
Error
Temp. The temperature of the inverter ℃ CurrSensor Err S Current Sensor Error (Slave)
*: The single MPPT inverters Sununo-TL1.5K/2K/3KB/4KB do not have these two items.

41 42
User Manual User Manual

Error Explanation Type of Error When the three items have been set, “Are you sure to set it?” will appear; press
Varistor Err S Varistor Error (Slave) ENT to confirm it. Then press ESC or ENT to exit when “Set Complete!”
appears.
2.5V Ref Err S 2.5V Ref Error (Slave) Date: 2011/10/31
Other Err M Other Error (Master) ^
CurrSensor Err M Current Sensor Error (Master)
GFCI Dvc Err M GFCI Device Error (Master) Permanent Time :
Int. Comm Err M Internal Communication Error (Master) Error This setting includes “hour, minute and second”.
E2PROM R/W Err M E2PROM R/W Error (Master) Please refer to the operation steps of “Date Setting”.
2.5V Ref Err M 2.5V Ref Error (Master) Time:15:48:28
DCI Device Err M DCI Device Error(Master) ^
Relay Err M Relay Error (Master) Grid Compliance(Only for SAJ or SAJ representative):
The Gird Compliance may be different in the different countries. If the chosen
* “Master” is inverter’s main controlling and processing unit. country of “Grid Compliance” is incorrect, we can modify it by this menu.
* “Slave” is inverter’s subordinate controlling and processing unit. Enter to the “Gird Compliance” and confirm the password, then press“▼ ”
or“▲ ” button to select the country. Please press “ENT” button to confirm
after finish the selection.
7.2.8 History Errors
Ethernet :
When enter the History Errors menu if one or more error had happened, we can The inverter system can get an IP address by using DHCP (Dynamic host
see the error occurred time. Move the cursor to the desired error time, press configuration protocol) when out of factory. If the action fails in 40 seconds, the
ENT to see the detailed error information (see the above table) system will use the default address:192.168.1.111(gateway:192.168.1.1,
>11/11/09 12:00 Subnet mask:255.255.255.0).
11/11/07 15:12
If user manually set an IP address, the system will use it all the time. To recover
7.2.9 Set-Param
the IP by using DHCP, User can configure the inverter to obtain the IP address
Note: Every parameter is effective after the below menus have been confirmed. automatically, then the inverter will automatically restart and adopt DHCP to get
the IP address.
Are you sure
Set complete!
to set it? The manual setting step is as follows:
Enter the Ethernet->manual setting menu, and press “▼ ” or “▲ ” button to set
Language : every figure, press ENT to confirm, and then it automatically points to next figure.
The inverter will support multi language:English, German and French etc. in When all the figures have been set, “Are you sure to set it?” will appear; press
the future, please refer to SAJ service people for latest information. Press “▼” ENT to confirm it. Press ESC or ENT to exit when “Set Complete!” appears.
or “▲ ” button to choose one language. Press ESC or ENT to exit when “Set
Complete!” appears. Wifi:
Do not support this function temporary.
Language [0]
0:EN 1:GE 2:FR Change Password(Only for SAJ or SAJ representative):
User can change the password by the “Change Password” menu.
Date :
This setting includes “ year, month and date”. Press “▼ ” or “▲ ” button to Clear Errors:
choose one of the items: year/ month/date, press ENT to make the cursor “^” Be caution that this operation will clear up the history error records.
point to the selected item. Then press “▼” or “▲” button to set the parameter. If user wants to clear up the history error records, move the cursor and press ENT
to enter the sub-items, press ENT to confirm the setting when the below menu
Press ENT to confirm this item setting, then it automatically points to the next occurs. Press ESC or ENT to exit when “Set Complete!” appears.
item setting. Repeat the operation steps to set other item.

43 44
User Manual User Manual

Clear Energy:
Be caution that this operation will clear up the generated energy data of E- 9. TROUBLESHOOTING
Today、E-Month、E-Year、E-total、T-Today、T-Total etc.
If user wants to clear up the generated energy record, move the cursor to "clear
energy" and press “ENT”to enter the sub-items, press “ENT” to confirm the
setting when the below menu occurs. Press ESC or ENT to exit when "Set
complete!" appears.

Factory Setting(Only for SAJ or SAJ representative):


Note: This operation will erase all history data record, such as generated energy,
error logs etc. And the password and Grid Compliance will be set back to default
settings.
Enter “Factory Setting” menu to enter the password, the system will required
users to re-confirm “Factory Setting”. Press “ENT” button to confirm. You can
see “Set complete” to finished the “ Factory setting” and press “ESC” or “ENT”
to exit the “ Set complete”

7.2.10 Inverter-Info

User can read the inverter detailed machine information:


> Machine Type > SN code
Grid Compliance Product Code > Firmware Ver

User can enter the corresponding sub-menu to see the detailed information .
Enter the “Firmware Ver” , it will show the firmware version of master control
unit, slave control unit, display board (the firmware version will vary when it is
updated)

8. RECYCLING AND DISPOSAL


WARNING
This device shall not be disposed of in residential
waste.

To comply with European Directive 2002/96/EC on waste Electrical and


Electronic Equipment and its implementation as national law, electrical
equipment that has reached the end of its life must be collected separately and
returned to an approved recycling facility. Any device that you no longer
required must be returned to your dealer or you must find an approved
collection and recycling facility in your area.
Ignoring this EU Directive may have severe affects on the environment and
your health.

45 46
User Manual User Manual

47 48
User Manual User Manual

49 50
User Manual User Manual

51 52
User Manual User Manual

10. Guaranty Service

Please refer to the warranty card.

11. Contact SAJ

GUANGZHOU SANJING ELECTRIC CO., LTD.


Add:No.17, Xiangshan Road Guangzhou Science City, Guangdong,
China P.R.C. Zip: 510663
http://www.saj-solar.com

Technical Support & Service:


Tel:+86 20 6660 8619
Fax:+86 20 6660 8589
E-mail:[email protected]

International Sales:
Tel:+86 20 6660 8618/6660 8532
Fax:+86 20 6660 8589
E-mail:[email protected]

Domestic Sales:
Tel:+86 20 6660 8555
Fax:+86 20 6660 8589
E-mail:[email protected]

53 54
ABBREVIATION

LCD Liquid Crystal Display


LED Light Emitting Diode
MPPT Maximum Power Point Tracking
PV Photovoltaic
GFCI Ground Fault Current Interrupter
Vdc Voltage at the DC side
Vac Voltage at the AC side
Vmpp Voltage at the Maximum Power Point
Impp Amperage at Maximum Power Point
Voc Open Circuit Voltage
Isc Short Circuit Current
AC Alternating Current ( Form of electricity supplied by Utility
Company )
DC Direct Current ( Form of electricity generated by PV modules )
VDE 0126-1-1 German standards for establishing suitability for Grid
Connection of the Inverter.
DC Switch Switch in the DC Circuit. Disconnects DC source from Inverter.
May be integrated or external to Inverter.