EMS Equipment Inspection Checklist
EMS Equipment Inspection Checklist
Doc. No : Date:
2 4
3 9
9 1
1
5
O/P 1 8
I/P
cable
cable 12 6
1
3
Remarks
Name:
Date:
RBI BUILDING PROJECT
< CLIENT LOGO >
EMS LIMITED, NAVI MUMBAI
Diesel Generator
Contractor: Location :
Doc. No : Date:
9 6
7
5 4
2 1
3 1 1
1 0 8
Sr No. Description Yes No Remarks
Remarks
Signature:
Name:
Date:
RBI BUILDING PROJECT
< CLIENT LOGO >
EMS LIMITED, NAVI MUMBAI
Tractor
Contractor: Doc. No :
Remarks
Name:
Date:
RBI BUILDING PROJECT
2 5 1
5
3
3 4
2
8 9 7
6
S No. Description Yes No Remarks
Front & reverse horn available & in working
1
condition
Remarks
Name:
Date:
RBI BUILDING PROJECT
Concrete Mixer
Contractor: Doc. No :
8 Condition of Drum
Note: Ensure barricading on both sides of the hooper when the machine is in operation
Remarks
Name:
Date:
RBI BUILDING PROJECT
Doc. No : Date:
4 5
2
6 7
1
8 3
Remarks
Name:
Date:
RBI BUILDING PROJECT
1
0 3
5 9
1 1
0 2
Remarks
Contractor's Client's
EMS Representative
Representative Representative
Signature:
Name:
Date:
#REF!
RBI BUILDING PROJECT
EMS LIMITED
Welding Machine
Contractor: Location :
Doc. No : Date:
6 2
2
1
1
0
5
4 3
8
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Grinding Machine
Contractor: Doc. No :
2 1
1
4
4
5 5
7 6 8
3 8 6 7
3
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
6 5
7
Fron
1 t
8 1
1 side
2 of
3 the
S No. Description m/c
Yes No Remarks
8 No oil leakage
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Flotter Mahine
Contractor: Doc. No :
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Earth Rammer
Contractor: Doc. No :
3 No oil leakage
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Batching Plant
Contractor: Doc. No :
Remarks
Contractor's Client's
EMS Representative.
Representative Representative
Signature:
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Doc. No : Date:
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Comments
Signature:
Name:
Date:
9
RBI BUILDING PROJECT
EMS LIMITED
Comments
Signature:
Name:
Date:
9
RBI BUILDING PROJECT
EMS LIMITED
R Y B N
Comments
Signature:
Name:
Date:
9
RBI BUILDING PROJECT
EMS LIMITED
EMS LIMITED
Doc. No : Date:
Year of Annual Pressure Date of Due for Monthly
S No. Type Capacity Location Refilled on Remarks
Manfacture Insp. Dt. tested on Discharge Refilling Inspection Dt.
Remarks
Signature:
Name:
Date:
RBI BUILDING PROJECT
< CLIENT LOGO >
EMS LIMITED, NAVI MUMBAI
7 Whether proper hand rail, mid rail and toe board provided in S/F.
Whether all work platforms ensured to be of adequate strength
8
and suitable for work.
Whether all the metallic planks, gratings tightened with binding
9
wires.
10 Whether proper supporting has been fixed to avoid S/F topple.
Whether common lifeline provided in critical work place to secure
11
safety belt/ harness
Whether Scaffolding has been inspected by S/F supervisor/safety
12
officer and Scaff Tag provided.
LADDER CHECKLIST:
Whether ladders are provided at the working site & in good
1
condition.
Whether ladders are properly secured to prevent slipping, sliding
2
and falling
Whether Aluminum ladder has been used to avoid electrical
3
hazards.
4 Whether ladder placed at right angle(65 to 75 degree)
6 Are existing access ways (Stair, walkway, ladders) etc. left clear?
Signature:
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Tough Rider
Contractor: Doc. No :
Remarks
Name:
Date:
1
<Project Name>
Dumpers
Name of Contractor: Date:
Are service brakes on trailers and semi trailers controlled from the driver’s
9
seat of the prime mover?
Are dead-man levers and foot pedals returning to the neutral position
10
automatically upon release by the driver?
11 Is there a legible copy of the operators manual with the Trailer (English)
Is the Trailer crew wearing appropriate PPE (e.g.: visibility vests, hard hats,
12
safety boots etc.)?
Remarks:
Signature:
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Doc. No : Date:
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Signature:
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Road Compactor
Contractor: Doc. No :
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Excavations
Contractor: Date:
Excavation
Location :
Depth:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Ambulance
Contractor: Doc. No :
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Housekeeping
Contractor: Doc. No :
Date: Location :
Name:
Date:
RBI BUILDING PROJECT
Doc. No : Date:
Date
Do not use
mobile while
driving
EMS LIMITED
NOTE:- Ensure barricading on both sides of the when the machine is in operation
Remarks
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Doc. No : Location :
Name:
Date:
RBI BUILDING PROJECT
EMS LIMITED
Name:
Date: