1. The document provides specifications for submersible pumps to be used for plant room drainage, basement drainage, and sewage lifting.
2. It lists the required flow rates, heads, solid handling capacities, and materials of construction for 3 sets of pumps - one each for plant room drainage, basement drainage, and sewage lifting.
3. It also specifies that the pumps must include auto coupling units, local starter panels, and control panels with level sensors and dry run protection. The control panels must integrate with the building management system.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
50 views2 pages
Data Sheet R0.xlsx - 1
1. The document provides specifications for submersible pumps to be used for plant room drainage, basement drainage, and sewage lifting.
2. It lists the required flow rates, heads, solid handling capacities, and materials of construction for 3 sets of pumps - one each for plant room drainage, basement drainage, and sewage lifting.
3. It also specifies that the pumps must include auto coupling units, local starter panels, and control panels with level sensors and dry run protection. The control panels must integrate with the building management system.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
General Checklist for Technical document submission SUMP PUMPS
Rev. - R0 CPWD-TPL-SEC-TDS-PHE-006
Makes Make List of
specified in selected Supporting S.N BOQ item Approved by Contractor documents Description of item make list of for submitted in o number Tender the project attachment for approval
1.4 Submersible Pumps:
Submersible Centrifugal Non-clog Drainage Pumps ,installation, testing and commissioning of submersible pumps As Follows: , installation, testing and commissioning of continuous duty Submersible Centrifugal non-clogging or vortex type drainage pumps complete with 3 phase motor with all necessary protection and mechanical seal as per manufacturer standard etc. Pumps set shall have auto coupling assembly. The installation shall be complete with all 1 necessary indigenous accessories as required to complete the installation with pressure gauge in the discharge line as per specification/drawings and as directed by Engineer In Charge
Contractor shall provide pump lifting arrangement shall
comprise of MS galvanized guide bar & MS assembly with SS 304 chain with shakle suitable for 2 Nos. submersible drainage pumps in a sump of overall depth not more than 2.0 m, 1.4.1 1 Set : (1 Duty + 1 Assist) Total flow rate of system: 10.0 LPS Flow rate : 5.0 LPS each Head : 15 Mts Solid Handling : 25 MM Location : Plantrooms Grundfos, WILO, Technical Data Purpose : Plant Room Drainage Xylem (FLYGT), Wilo Sheet MOC : CI -Body, C.I impeller & SS shaft - (420 or EBARA, / Kirloska 431) 1.4.2 1 Set : (1 Duty + 1 Assist) Total flow rate of system: 10.0 LPS Flow rate : 5.0 LPS each Head : 20 Mts Solid Handling : 25 MM Location : Basement and trench Purpose : Basement Drainage for Fire Zone MOC : CI -Body, C.I impeller & SS shaft - (420 or 431) In addition to the above description pump shall have grinder/cutter system to provide high efficiency. After discharge solid handling shall be not more than 20 mm. Motor shall have built-in thermal protection against overheating. 1.4.3 1 Set : (1 Duty + 1 Assist) Total flow rate of system: 5 LPS Flow rate : 2.5 LPS each Head : 20 Mts Solid Handling : 20 MM Location : Basement Purpose : Sewage Lifting MOC : CI -Body, C.I impeller & SS shaft - (420 or 431) Cost shall be inclusive of providing auto coupling unit for Sewage ejector pit (separate item) Shop drawing for the installation to be approved by the engineer in charge prior to execution. Local starter panels of IP55 rating fabricated out of 2mm thick CRCA sheet with hinged lockable doors, complete with all required starters of DOL starter. Pump shall be provided with separate skid mounted electrical panel of 415V +10%, 50 Hz, 3 Phase AC , for power distribution and control for equipment listed below with all necessary power & control circuit breakers, contactors, SPPR, start- All hardwares required for mounting of panel in wall/floor shall be included in panel cost itself. All power cables shall be armoured ,XLPE, coper cable of adequate GSIPL (OEM size. All control cables shall be armoured PVC coper LEGRAND) cable. Minimum of 2.5Sq.mm cable shall be used for Note:- Power at 1 Nos. incomer in the panel and single point BMS connectivity shall be done by electrical contractor. The pump panel shall have RS- 485/Modbus/BACnet over IP/ BACnet over MSTP port to integrate with Building Management System without any external hardware/converter requirement. Technical Control panel shall comprise of level sensor and pumps shall have dry run protection with high/ low level alarm. Pumps shall be supplied with 3 Nos. float switches and electrical control panels with cables. Each pump shall have provision for auto/ manual operation in the control