This Micro-Grid ESS (Energy Storage System) contains 0.5 MW - 1.2 MWh LiFePO4 battery system, 1000 kW PCS,
1 set HVAC (Heating, Ventilation and Air Conditioning), 1 set Fire Fighting, lighting system, thunder-proof, AC&
DC distributor, optional parts, and a SCADA (Supervisory Control And Data Acquisition) system to manager them.
All of the above are designed in 1 40 ft standard container.
01
02
19 Altitude ≤ 2000 m
20 System noise < 75 dB
21 Protection level IP54 / NEMA 3R
22 Pollution level 2 levels
23 External Communication Port Ethernet MODBUS(TCP/IP)
2. Battery System
2.1 Features
• Using long lifetime (≥ 4000 cycles) high efficient (reach 98%) High safety LFP cells;
Battery box 19
3 Battery RACK 730 240 175
series
Battery 6
4 System 730 1440 1050
RACKS series
04
05
The 1.2 MWh (730 V 1440 Ah) LFP battery system contains 6 Battery Clusters.
Each 175 KWh (730 V 240 Ah) Cluster is composed of 19 pcs battery modules, 1 pcs control modules.
06
07
Item Spec
System topology System = 7 Clusters = 7*19 Modules
2) Insulation detection, real-time detect insulation resistance of high voltage positive and negative pole
against the chassis;
4) Each BMU module real-time monitoring of single voltage (real-time monitoring voltage of 16-24 cells in
series) and 4-way temperature;
5) Equipped with two CAN communication function, divided into internal communication network, external
communication network. Internal communication network is responsible for the host, from the machine
communication and diagnostic system data, the external network is responsible for interaction with the
PCS controller and other information.
08
6) With fault diagnosis, including temperature, voltage, current, insulation, contactor status, fuses, sensors,
communications and other fault diagnosis;
7) Battery system safety management functions, including overcharge, over discharge, overcurrent,
insulation failure, overheating, voltage difference, temperature and other protection;
8) With a balanced function, balanced mode for the passive balance, the maximum equilibrium current of
30 mA.
09
3. PCS
Product Features
Function Block
10
PCS Specification:
Item Spec
DC
DC Voltage Ripple ≤ 5%
IP Grade IP20
11
Others
Weight 1600 kg
IP Grade IP20
• The system can automaticlly detect fire, alarm and start the fire extinguishing system.
• Have three kinds of starting methods: automatic control, manual control and mechanical emergency
operation.
• Self-test system, regular automatic inspection, monitoring faults and fault alarms.
12
Control system is in automatic working state, automatically completes the whole process of fire detection,
alarm, linkage control and fire extinguishing.
Steps:
Step 1: After a fire signal is detected by a detect circuit in the protection area, fire alarm controller activates
the alarm bell in the protected zone and provides a fire pre-alarm signal.
Step 2: After the other detect system inside the same defence area defects the fire signal, the fire alarm
control system activates the voice and light alarm from the defence, meanwhile, alert the people to escape.
Then the airconditioner and airflow fan instruments will be cut off. The fire alarm system will enter into
delayed period(0-30S).
Step 3: When the delay is over, fire alarm control system outputs active signal to activate the solenoid valve
on the gas cylinder, and spray fire extinguishing agent into the protection area.
The fire alarm control system actives the deflation indicator of the protection area to remind the staff that on
this protection area is spraying fire extinguishing agent and do not allow enter into.
Emergency start
When the fire protection system is in the manual start state, fire alarm control system only sends out alarm
signal, no output action signal. After the on-duty personnel confirm the fire alarm signal, press the
emergency start button on the control panel of the fire alarm control system or the emergency start-stop
button in the protection area to manually start the fire extinguishing device and spray the HFC-227EA fire
extinguishing agent.
Emergency Stop
When the fire alarm control system into the 30s delayed period, if the on duty people confirms that it is a
false alarm, can manually operate the emergency stop button on the control panel of the fire alarm control
system or the emergency start-stop button in the protection area and stop spraying HFC-227EA fire
extinguishing agent.
An emergency start is required only if both automatic and manual control fails or the system loses power.
This moment can active the gas fire control system by operate the manual start device on the HFC-227EA
fire extinguisher.
13
In order to overcome the shortcomings of slow cooling and poor consistency of the existing battery compartment
thermal management scheme, the utility model proposes a thermal management scheme using improved air
ducts, wind walls and heat dissipation channels in the battery box to improve cooling efficiency and consistency.
The thermal management scheme of the energy storage container battery storehouse proposed by the utility
model is that an industrial air conditioner is arranged at one end of the battery warehouse aisle, the maximum
refrigeration capacity of the air conditioner is the same as the maximum heating power of all the batteries in the
battery storehouse, the air supply and return mode of "top air supply and front air return" is adopted, the top air
outlet of the air conditioner is connected with the air duct, and the air duct is installed above the battery rack
along both sides of the aisle, and the air duct height is the direction decreases step by step. This design can
make the air pressure of each outlet close to each other, and ensure the uniform outflow of cold air from each
outlet. A wind wall is arranged between each battery rack and the wall of the warehouse. The upper part of the
wind wall is connected with the air duct. The non blocked side of the wind wall is welded seamlessly at the edge
and the battery rack. Its function is to guide the cold air flow from the air duct into each battery box evenly. Along
the width direction of the battery box, a heat dissipation channel is arranged every two cores. The heat dissipation
channel connects the wind wall and the walkway, enlarges the heat dissipation surface of the cores, and is
conductive to uniform heat dissipation.
The utility model has the beneficial effects that the stepped air duct effectively equalizes the wind pressure, and
realizes the even distribution of the cold air flow in each wind wall. The cold air is accurately guided to the
heating electric core to realize efficient heat dissipation. The cold air is overflowed by the wind wall and evenly
enter the heat dissipation channel of each battery box to improve the heat dissipation of the battery core.
14
1. Placed at the end of the battery compartment aisle, on the air conditioning top is air supply and stepped air
duct.
3. Wind wall.4. The unsealed side of the wind wall is seamlessly welded to the battery holder at the edge.
5. The battery box of the battery rack is placed horizontally, the front of the box is the battery compartment
walkway, and the back is the wind wall.
6. 40ft container
The structural design of the mobile box energy storage power station is mainly composed of a 40-foot special
container, with battery system, air conditioner cold system, fire protection system, bidirectional converter device,
power distribution system, monitoring devices and thermal insulation devices.
As shown below:
1. air conditioning outdoor unit
2. air conditioning indoor unit
3. monitoring system cabinet
4. stepped air duct
5. fire protection system
6. bidirectional converter
7. sub-mother door
8. battery rack
9. main control frame
10. power distribution cabinet
11. battery rack air duct
12. double door
13. grid-type ventilation escape door
14. battery module
15. main control box.