100% found this document useful (1 vote)
145 views

Subhash Kumar Chaudhary-CV

Subhash Kumar Chaudhary has over 7 years of experience as a civil engineer and quantity surveyor in Nepal. He holds a B.E. in Civil Engineering and has extensive training in software like AutoCAD. His past work includes quantity estimation, construction supervision, and preparing progress reports for various infrastructure projects like roads, hydropower plants, and sewerage systems. He believes his experience estimating quantities, reviewing drawings, and dealing with contractors qualifies him to take on the tasks described in the Terms of Reference.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
145 views

Subhash Kumar Chaudhary-CV

Subhash Kumar Chaudhary has over 7 years of experience as a civil engineer and quantity surveyor in Nepal. He holds a B.E. in Civil Engineering and has extensive training in software like AutoCAD. His past work includes quantity estimation, construction supervision, and preparing progress reports for various infrastructure projects like roads, hydropower plants, and sewerage systems. He believes his experience estimating quantities, reviewing drawings, and dealing with contractors qualifies him to take on the tasks described in the Terms of Reference.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

# Subhash Kumar Chaudhary

CURRICULUM VITAE (CV)

Proposed Position Quantity Survey Engineer


Name of Expert: Subhash Kumar Chaudhary
Date of Birth: 2043-06-05
Citizenship: Nepali

Education:

 B.E. in Civil Engineering from Visvasvaraya Technological University, Belgavi, Karnatka State in 2015
 I. Sc. from DAV Sushil Kedia Bhai Higher Secondary School, Lalitpur, Nepal in 2011

Trainings:
 SW Road and DTM Software
 AutoCAD,
 MS office Package
Employment record relevant to the assignment:
Employing organization and your title /
Period position. Contact information for Country Summary of activities performed relevant to the Assignment
references
Led projects and analyses to identify opportunities For Improvement,
Completed paperwork, recognizing discrepancies and promptly addressing
Employer: Kanchharam Construction for resolution, Created Spreadsheets using Microsoft Excel to Daily, Weekly
Company Pvt.Ltd. Kathmandu ,Nepal and monthly Reporting, Estimated Quantities and Material Cost during
Feb 2019-
Position held: Senior civil Engineer Nepal project work, Analyzed survey reports, Map and other topographical and
till date
Engineer geological data to plan infrastructure and construction Projects, Provided
technical and professional Engineering Support service in Design,
Construction and Traffic Engineering.

Employer: Mandu Hydropower Pvt.


• Quantity Estimate of Headworks, Settling Basin, Headrace Tunnel, Power
Ltd., Kathmandu
Jan 2017 House etc including all civil works. Checking of Payment certificates
Position held: Quantity Survey Nepal
-Feb 2019 submitted by Contractor and making comments if any. Reporting to Team
Engineer
Leader. .Preparation of Monthly Progress Report

•, Quanity Estimate of Road pavement works, Road side structures, Cross


Employer: Raman Construction Pvt.Ltd drainage works. Sewarage Pipe laying works etc. Measurement of Civil
Dec 2015-
Position held: Project Engineer/ works, Preparing Payment Certificates, Preparing of the workshop drawing
November Nepal
Quantity Survey Engineer and its submission to the Engineer for approval. Preparation of Daily work
2017
programme, Daily Site Reports, Coordination with the Site supervision
engineers and reporting to Project Manager in case of Quanity issues.

Membership in Professional Associations and Publications:


 Nepal Engineering Council-3579 "Civil" A

Language skills:    Speaking Reading Writing


Nepali Excellent  Excellent  Excellent 
English Excellent  Excellent  Excellent 
Hindi Good Good Good
Maithili Good Good Good
Bhojpuri Good Good Good

Adequacy for the Assignment:


Detailed Tasks Assigned on consultant’s Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the
Team of Experts: Assigned Tasks

Page 1 of 2
# Subhash Kumar Chaudhary

Name of project: Year: Constructionn of Urban Roads


Year: 2019 Feb to till date
Location: Rajbiraj Client: Project Office Of Urban Development And Building
Construction, Rajbiraj, Saptari
Main Project Features: Asphalt concrete roads, road side drains, precast drain covers,
kerb stones,
As per ToR Position Held: Civil Engineer
Activities Performed:
 Construction supervision of Civil works,
 Joint Measurement of works and estimation of quantity of construction activities
 Preparation of Monthly Progress Report
 Checking of payment certificates.
 Review of shop drawings
 Deal with the Contractor’s Engineer in regard to site issues.
 Review of method of statements of works,

Name of project: Bagmati Hydropower Project, Year: Jan 2017 to Feb 2019, Location: Makwanpur Client: Mandu Hydropower Pvt. Ltd.,
Main Project Features: installed Capacity 28.1 MW, Intake, Settling Basin, HRT: 4.965 km, D shaped 4.9m dia Penstock Length:217.5m
3.75 m dia.Surface Powerhouse with 3 nos. of vertical Pelton turbines., Position Held: Quantity Survey Engineer,
Activities Performed:
 Construction supervision of Civil works,
 Joint Measurement of works and estimation of quantity of construction activities
 Preparation of Monthly Progress Report
 Checking of payment certificates.
 Review of shop drawings
 Deal with the Contractor’s Engineer in regard to site issues.
 Review of method of statements of works,
Name of project: Bagmati Area Physical Infrastructure Development Project (CH 12+8000-14+000) Year: December 2015 to Nov 2017;
Location: Nepal; Client: Government of Nepal, High Powered Committee for Integrated Development of the Bagmati Civilization; Main
Project Features: Double lane Asphalt Concrete Pavement Road, construction of Sewerage mains in both bank of Bagmati River, Road
side retaining walls, footpaths, side drains. Position Held: Project Engineer/ Quantity Survey Engineer;
Activities Performed:
 Reporting to Project Manager about the work progress
 Construction supervision of Civil works,
 Joint Measurement of works and estimation of quantity of construction activities
 Preparation of Monthly Progress Report
 Preparation of payment certificates.
 Preparation of shop drawings
 Preparation of bar bending schedule
 Preparation of daily work program and daily site diaries.
 Preparation of Work Schedule

Expert’s contact Information: (E-mail:[email protected], Phone: 9827782445)

Certification:
I, the undersigned, certify that, to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my
experience.

(Signature of expert)

Page 2 of 2

You might also like