B.E. in Civil Engineering from Visvasvaraya Technological University, Belgavi, Karnatka State in 2015
I. Sc. from DAV Sushil Kedia Bhai Higher Secondary School, Lalitpur, Nepal in 2011
Trainings:
SW Road and DTM Software
AutoCAD,
MS office Package
Employment record relevant to the assignment:
Employing organization and your title /
Period position. Contact information for Country Summary of activities performed relevant to the Assignment
references
Led projects and analyses to identify opportunities For Improvement,
Completed paperwork, recognizing discrepancies and promptly addressing
Employer: Kanchharam Construction for resolution, Created Spreadsheets using Microsoft Excel to Daily, Weekly
Company Pvt.Ltd. Kathmandu ,Nepal and monthly Reporting, Estimated Quantities and Material Cost during
Feb 2019-
Position held: Senior civil Engineer Nepal project work, Analyzed survey reports, Map and other topographical and
till date
Engineer geological data to plan infrastructure and construction Projects, Provided
technical and professional Engineering Support service in Design,
Construction and Traffic Engineering.
Page 1 of 2
# Subhash Kumar Chaudhary
Name of project: Bagmati Hydropower Project, Year: Jan 2017 to Feb 2019, Location: Makwanpur Client: Mandu Hydropower Pvt. Ltd.,
Main Project Features: installed Capacity 28.1 MW, Intake, Settling Basin, HRT: 4.965 km, D shaped 4.9m dia Penstock Length:217.5m
3.75 m dia.Surface Powerhouse with 3 nos. of vertical Pelton turbines., Position Held: Quantity Survey Engineer,
Activities Performed:
Construction supervision of Civil works,
Joint Measurement of works and estimation of quantity of construction activities
Preparation of Monthly Progress Report
Checking of payment certificates.
Review of shop drawings
Deal with the Contractor’s Engineer in regard to site issues.
Review of method of statements of works,
Name of project: Bagmati Area Physical Infrastructure Development Project (CH 12+8000-14+000) Year: December 2015 to Nov 2017;
Location: Nepal; Client: Government of Nepal, High Powered Committee for Integrated Development of the Bagmati Civilization; Main
Project Features: Double lane Asphalt Concrete Pavement Road, construction of Sewerage mains in both bank of Bagmati River, Road
side retaining walls, footpaths, side drains. Position Held: Project Engineer/ Quantity Survey Engineer;
Activities Performed:
Reporting to Project Manager about the work progress
Construction supervision of Civil works,
Joint Measurement of works and estimation of quantity of construction activities
Preparation of Monthly Progress Report
Preparation of payment certificates.
Preparation of shop drawings
Preparation of bar bending schedule
Preparation of daily work program and daily site diaries.
Preparation of Work Schedule