The document provides a flow chart summarizing the steps for residential consumers to avail solar net metering and capital subsidy in Telangana: 1) Consumers download the application form from the website or register online and select their options. 2) If eligible for capital subsidy, the empaneled supplier submits documents to TSREDCO who issues in-principle sanction after inspection. 3) The supplier installs the system within 90 days and submits completion documents to TSREDCO who notifies DISCOM for meter replacement and billing.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

Solar Netmeter Flow Chart

The document provides a flow chart summarizing the steps for residential consumers to avail solar net metering and capital subsidy in Telangana: 1) Consumers download the application form from the website or register online and select their options. 2) If eligible for capital subsidy, the empaneled supplier submits documents to TSREDCO who issues in-principle sanction after inspection. 3) The supplier installs the system within 90 days and submits completion documents to TSREDCO who notifies DISCOM for meter replacement and billing.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SOLAR

NETMETER FLOW CHART 


Start Here

Download application from www.tssouthernpower.com/


solar rooftop Net metering/ Application form or online
registration and select options

Residential
Consumer

Yes

Yes Avail CFA No

Select empanelled supplier from the list


available in TSREDCO website In Case of any DTR capacity
enhancement required,
Pay Rs.2950/- for LT / Rs.17700/- for HT consumers (incl.GST) in online (Or) obtain Demand notice shall be
DD from any scheduled bank in favour of TSSPDCL for offline submission at nearest served to consumer and
CSC/ICSC centre along with required documents as mentioned in application form payment should made by
consumer within 15 days
Note down unique registration number (URN) generated in online / Obtain the
Acknowledgement with URN from CSC/ICSC operator for further reference

Application automatically forward to ADE/op login in case of LT & DE/Op Login in


case of HT for study of technical feasibility Consumer Yes
willing to pay

Application Should be check properly and intimate any discrepancy to


Consumer with in 3 working days Enhance DTR Capacity after
receipt of Payment 

No
DTR Capacity After Charging of DTR in
No SAP and CSC
Adequate

Yes

Technical Feasibility by Concern office with in 7


working days

Data flow to SAP for


SMS alert and email will be received by preparation of estimation
consumer about Technical feasibility

Where AE/ICSC available


shall process Creation and
approve of netmeter
CFA required No estimate / where AE/ICSC
not available concerned
ADE/DE-Op will process
sanction of estimate within 5
days
Yes
Consumer can choose any vendor who Order will be release by
install Rooftop Solar System concern officer after approval
Selected empanelled supplier shall upload
required documents (Photo, Aadhar, Tech
Feasibility & Electricity Bill) at TSREDCO by
paying  required processing fee for CFA process AE/ICSC should send netmeter
After completion of site work, consumer should
to Concerned ADE/DE-Op with
submit work completion report Online in
route rider within 24 hrs after
TSSPDCL Portal or at CSC/ICSC
recipt of WCR 
In-principle sanction issue by TSREDCO after
Site inspection carry out by TSREDCO officials
accompanied by DISCOM officials 

Install the RTS system within 90 days and


submit the Project Completion Reports and other
related documents by empanelled supplier to ADE/ DE Should inspect the site and
TSREDCO replace the Old meter with NETMETER and
update the test  report in CSC within 5 days

TSREDCO shall intimate TSSPDCL about the


completion of project

Data will be sent to EBS for billing

Disbursement of
Yes
CFA

Inspection of plant by
TSREDCO officials
accompanied by TSSPDCL
officials for CFA purpose

TSREDCO will update in SPIN No


Portal and intimate to
TSSPDCL for release of CFA 

Release CFA to empanelled


END