2.0 Sterilization
i Submersible cutter PUMP Nos 2
Capacity : 2HP
Brand: Sumak/eqv.
ii Pump lifting chain( stainless steel) Rft 25
iii Pipe Fitting Accessories set 1
iv Pump fittings Accessories set 1
v Electrical Accessories with Works set 1
Capacity : 20 cum/hr
Head : 10 m
Brand: Sumak/eqv.
ii Pipe & Pipe Fitting & Accessories for Raw 1
Sewage Handle set
5,697,000.00 5,697,000.00
Page 1 of 3 672893687.xlsx
Supply & Installation of Sewerage Treatment Plant
Capacity : 8 cum/hr
Head : 10 m
Brand: Sumak/eqv.
ii Tube Settler set 1
iii Tube Settler fittings Accessories set 1
iv Pipe & Pipe Fitting Accessories for sewage 1
Handle set
Capacity : 10 cum/hr
Head : 12 m
Brand: Sumak/eqv.
ii Pipe & Pipe Fitting Accessories for Raw sewage 1
Handle set
Page 2 of 3 672893687.xlsx
Supply & Installation of Sewerage Treatment Plant
Client Part:
1. RCC Tank
2. RCC Tank Finishing and any kind of Civil Works
3. Plant Room & Machine Room Ventilation
4. Plant Room Electrification (Lighting, Power Point & Main SDB)
Terms & C
Payment : 1. 60% advance along with work order.
2. 30% will be paid on progress of work.
3. 10% will be paid after hand over of the Project.
Tax : Excluded.
Vat : Excluded.
Delivery : Delivery from our ready stock.
Validity : 30 days from to date.
Warranty : Twelve Months for any manufacturing fault.