C10 Test Procedure - Updated
C10 Test Procedure - Updated
Method- I :
Battery Bank fully isolated condition { DG set should be healthy condition, in this method it will
run continuously for 11hrs }
5. Start the Test and note down the voltages in given format.
6. If cell voltage reaches to less than or equal to 1.75V, Stop/pause the test. Otherwise continue the
test upto 10hours.
7. After Completion of Test, Connect the HRC fuse or Turn ON the MCB between DCPS/IPMS and
Battery Bank. Now Battery Bank came to charge mode.
Method- II :
{ Follow this method if site is having dual DCPS with Battery Bank}
OR
{ If you want to avoid the long run of DG and you are having previous healthy report of Battery
Bank}
MCB-OFF
4. Connect the HRC fuse or Turn ON the MCB between DCPS/IPMS and Battery Bank.
5. Turn OFF the DG and extend the AC mains supply.
6. Set the parameters to perform the C10 test.
{Set parameters like end voltage , warning voltage, BB capacity, Test duration, test type , Test
current etc…}
7. Turn OFF the SMR’s
8. Start the C10 test (ON the Load MCB’s in External load Kit) and note down the voltages in given
format.
9. Case-i :
If Battery Bank voltage reaches to Warning voltage (User define value in set parameters) then
pause the test and follow Method-I.
Case-ii :
If cell voltage reaches to less than or equal to 1.75V, Stop/pause the test. Otherwise continue the
test upto 10hours.
After completion of the test Turn ON the SMR’s.
Battery Discharge test format
Site Name : Testing date :
Rating : Test load (in Amps) :
Make : Date of installation/commissioning:
Voltage before Voltage before Cell voltage while discharging Re-Charge voltage
starting of Test DC- starting of Test DC- After
Cell No
ON OFF immedite
(After equalizing) (After equalizing)
discharge 30min 1hr 2hr 3hr 4hr 5hr 6hr 7hr 8hr 9hr 10hr Initial 01hr
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Total voltage
(in volts)
Current/Load
(in Amps)