100% found this document useful (1 vote)
730 views

ESE-Testing & Commissioning For Fireman Intercom System

This document is a testing and commissioning form for a fireman intercom system. It lists 5 items to test, including testing the master intercom set, remote handsets, and 3-way communication. The form requires signatures from the contractor, project executive, and project manager to verify the results. Compulsory supervision is also noted for the testing and commissioning works.

Uploaded by

alif
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
730 views

ESE-Testing & Commissioning For Fireman Intercom System

This document is a testing and commissioning form for a fireman intercom system. It lists 5 items to test, including testing the master intercom set, remote handsets, and 3-way communication. The form requires signatures from the contractor, project executive, and project manager to verify the results. Compulsory supervision is also noted for the testing and commissioning works.

Uploaded by

alif
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EKTECH SYSTEMS ENGINEERING SDN BHD

TESTING & COMMISSIONING FOR FIREMAN INTERCOM SYSTEM


Project:

Job No.: Location:

Contractor: Drawing Ref:

Received By: Date/Time:

Block No. Insp. Date:

Testing Pressure: Tolerance:

ITEM DESCRIPTION RESULT REMARKS

1 Master Intercom Set to normal

- AC on

2 Pick up Remote Handset

- Buzzer sound

- LED on

- Communication

3 Pick up another Remote Handset

- Buzzer sound

- LED on

- Communication

4 3-way Communication

5 After testing - set system to normal


* Note : The Testing & Commissioning for Fireman Intercom System form must be attached with Part Construction Drawing.
: Compulsory Standing Supervision for Testing & Commissioning for Fireman Intercom System works.

Comments After Re-inspection

SUBMITTED BY : INSPECTED BY : VERIFIED BY :

(Contractor Rep.) ( Project Executive / COW) (HOP / Project Manager)

SIGNATURE : SIGNATURE : SIGNATURE :

NAME : NAME : NAME :

MKHBHD-PM-F79 Rev. 0
DATE : DATE : DATE :

MKHBHD-PM-F79 Rev. 0