This document is a quotation from Salvador B. Hic to Melanie Barredo for supply of labor and materials for modification of pipes for drain bypass and fabrication of overhead tank's reinforcement and support at the Josefa Building. The scope of work includes re-piping, modification of piping, fabrication and welding of supports for the overhead tank, cutting, painting, and epoxy sealing. The total labor cost is 17,000 PHP and total materials cost is 23,728 PHP. Payment terms require a 50% downpayment upon approval and 50% upon completion, with an expected 5 day work duration by a 3 person team.

Uploaded by

Chupapi Munyanyo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Drain Bypass

This document is a quotation from Salvador B. Hic to Melanie Barredo for supply of labor and materials for modification of pipes for drain bypass and fabrication of overhead tank's reinforcement and support at the Josefa Building. The scope of work includes re-piping, modification of piping, fabrication and welding of supports for the overhead tank, cutting, painting, and epoxy sealing. The total labor cost is 17,000 PHP and total materials cost is 23,728 PHP. Payment terms require a 50% downpayment upon approval and 50% upon completion, with an expected 5 day work duration by a 3 person team.

Uploaded by

Chupapi Munyanyo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Salvador B.

Hic
Blk. 34 Lot 23 Northville 4-A, Brgy. Lambakin, Marilao, Bulacan
Email Address: [email protected]
Contact #: 09392080235 / 09565886791
March 16, 2022

Josefa Building
Adriatico St. cor. Nakpil, Manila

Attention: Ms. Melanie Barredo


Email address: [email protected]

Dear Ma’am;
In compliance to your request, we are pleased to submit our quotation for your evaluation and consideration.

Subject: Supply of labor only for modification of pipes for drain bypass and fabrication of overhead tank’s
reinforcement and support

Materials:
 2 pcs 1 ½” PPR pipe PN20  2 pcs 1 ½” PPR Coupling  20 pcs 4” Cutting disc
 6 pcs 1 ½” PPR Male  1 pc 1 ½” x ½” PPR Tee w/  25 pcs Welding rod for
Adapter thread stainless (Nihon)
 5 pcs 1 ½” PPR Tee  2 pcs 1 ½” PPR Elbow 45  2 boxes Welding rod
 3 pcs 1 ½” Gate Valve (Kitz) degrees Ordinary (Nihon)
 2 pcs 1 ½” PPR Male Union  20 pcs Teflon tape ¾”  2 pcs 3” x 3” x ¼” Angle bar
Patente  1 liter Epoxy primer paint  1 pc 2” Paint brush
 5 pcs 1 ½” PPR Elbow 90  1 liter Green metal paint  2 pcs 1 ½” G.I Tee
degrees  1 liter Marine Epoxy (A&B)

SCOPE OF WORK:
 Re-piping of pipe for drain bypass (overhead tank drain to riser pipe)
 Modification of piping
 Fabrication and welding works for reinforcement/supports of overhead tank
 Cutting and covering of existing 4” pipe of overhead tank
 Restoration works
 Painting works
 Epoxy sealing of roofs
 Testing, observation and turnover

A. Total lot supply of labor – Php17,000.00


B. Total lot price of materials – Php23,728.00

Terms:
 50% down-payment upon approval of quotation
 50% full payment upon completion of project

Work Duration: 5 days


No. of workers: 3 persons

Thank you very much for giving us the opportunity to quote on your requirements. We are looking forward to serve you
soon.

Very truly yours,

Salvador B. Hic
Pump Technician / Plumber