1. Define Quantity Surveying and state briefly the Uses of Quantity Surveying.
2. Describe the major differences between quantity surveys conducted by the owner or representative and
Quantity surveys conducted by the contractor.
3. As a Technical Office Engineer in the construction company, you are assigned a task to estimate
the quantities of the following project items for a guarding room of a factory:
1. Excavation of the total area
2. P.C. volume of footings, and ground beams
3. R.C. footings, ground beams, column necks
4. Backfilling volume if compacted sand is required.