Estimate 2

This document provides a breakdown of proposed renovation works for a two-storey commercial building in Koronadal City, Philippines. It includes costs for general requirements like demolition and temporary facilities totaling 29,000 PHP. Earthworks like excavation and backfilling are estimated to cost 30,000 PHP. Shoring and scaffolding materials will cost around 22,375 PHP. Reinforced concrete works for items like footings, columns, beams and slabs are line itemized with quantities and costs totaling over 110,000 PHP.

Uploaded by

Jupi THIRD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Estimate 2

This document provides a breakdown of proposed renovation works for a two-storey commercial building in Koronadal City, Philippines. It includes costs for general requirements like demolition and temporary facilities totaling 29,000 PHP. Earthworks like excavation and backfilling are estimated to cost 30,000 PHP. Shoring and scaffolding materials will cost around 22,375 PHP. Reinforced concrete works for items like footings, columns, beams and slabs are line itemized with quantities and costs totaling over 110,000 PHP.

Uploaded by

Jupi THIRD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 63

PROJECT: PROPOSED RENOVATION OF TWO-STOREY COMMERCIAL BUILDING

OWNER: LORAINNE EBEO


LOCATION: JOSE ABAD SANTOS STREET, KORONADAL CITY

B R E A K D O W N O F W O R K S

1.) GENERAL REQUIREMENTS


DESCRIPTION QTY. UNIT PRICE AMOUNT
Mobilization / Demobilization = 1 lot Php 10,000.00 PhP 10,000.00
Demolition = 5 days Php 2,800.00 PhP 14,000.00
Temporary Facilities = 1 lot Php 5,000.00 PhP 5,000.00

TOTAL COST = PhP 29,000.00

2.) EARTHWORKS
DESCRIPTION QTY. UNIT PRICE AMOUNT
Clearing & Grubbing = 50 sq.m. Php 30.00 PhP 1,500.00
Lay-Out = 50 sq.m. Php 30.00 PhP 1,500.00
Excavation = 30 cu.m. Php 200.00 PhP 6,000.00
Fill Materials = 20 cu.m. Php 250.00 PhP 5,000.00
Gravel Base = 15 cu.m. Php 650.00 PhP 9,750.00
Back Fill = 25 cu.m. Php 250.00 PhP 6,250.00

TOTAL COST = PhP 30,000.00


3.) SHORING/SCAFFOLDINGS
DESCRIPTION QTY. UNIT PRICE AMOUNT
2x2x12 Coco Lumber = 500 bd.ft. Php 21.00 PhP 10,500.00
2x3x12 Coco Lumber = 500 bd.ft. Php 21.00 PhP 10,500.00
CWNails = 25 kgs. Php 55.00 PhP 1,375.00

TOTAL COST = PhP 22,375.00

4.) REINFORCING CONCRETE WORKS


DESCRIPTION QTY. UNIT PRICE AMOUNT
FOOTING
Portland Cement = 14 bags 200 PhP 2,800.00
Sand = 1 cu.m. 300 PhP 300.00
3/4 gravel = 2 cu.m. 500 PhP 1,000.00
16mm RSB = 14 length 300 PhP 4,200.00
#16 G.I. Tiewire = 4 kgs. 45 PhP 180.00
TOTAL PhP 8,480.00
COLUMN
Portland Cement = 26 bags 200 PhP 5,200.00
Sand = 2 cu.m. 300 PhP 600.00
Gravel = 3 cu.m. 500 PhP 1,500.00
16mm RSB = 12 length 300 PhP 3,600.00
10mm RSB = 24 length 120 PhP 2,880.00
10mm Thick Ordinary Plywood = 7 pcs. 400 PhP 2,800.00
2x2x12 Coco Lumber = 8 bd.ft. 18 PhP 144.00
2x3x12 Coco Lumber = 8 bd.ft. 18 PhP 144.00
Plastering Cement = 1 bags 200 PhP 200.00
Plastering Sand = 7 cu.m. 300 PhP 2,100.00
#16 G.I. Tiewire = 168 kgs. 45 PhP 7,560.00
#3 CW Nails = 29 kgs. 45 PhP 1,296.00
#4 CW Nails = 18 kgs. 45 PhP 810.00
TOTAL PhP 28,834.00
BEAM & ROOF BEAM
Portland Cement = 22 bags 200 PhP 4,400.00
Sand = 2 cu.m. 300 PhP 600.00
Gravel = 3 cu.m. 500 PhP 1,500.00
16mm RSB = 23 length 300 PhP 6,900.00
10mm RSB = 12 length 120 PhP 1,440.00
2x2x12 Coco Lumber = 38 bd.ft. 18 PhP 684.00
10mm Thick Ordinary Plywood = 13 pcs. 400 PhP 5,200.00
Plastering Cement = 9 pcs. 200 PhP 1,800.00
Plastering Sand = 2 pcs. 300 PhP 600.00
#16 G.I. Tiewire = 13 kgs. 45 PhP 585.00
#2 CW Nails = 188 kgs. 45 PhP 8,460.00
#4 CW Nails = 27 kgs. 45 PhP 1,224.00
TOTAL PhP 33,393.00
TIE-BEAM
Portland Cement = 8 bags 200 PhP 1,600.00
Sand = 2 cu.m. 300 PhP 600.00
Gravel = 2 cu.m. 500 PhP 1,000.00
16mm RSB = 17 length 300 PhP 5,100.00
10mm RSB = 0 legnth 120 PhP -
2x2x12 Coco Lumber = 19 bd.ft. 18 PhP 342.00
10mm Thick Ordinary Plywood = 10 pcs. 400 PhP 4,000.00
Plastering Cement = 4 bags 200 PhP 800.00
Plastering Sand = 2 cu.m. 300 PhP 600.00
#16 G.I. Tiewire = 5 kgs. 45 PhP 225.00
#2 CW Nails = 116 kgs. 45 PhP 5,220.00
#4 CW Nails = 14 kgs. 45 PhP 612.00
TOTAL PhP 20,099.00
FLOOR SLABS
Portland Cement = 67 bags 200 PhP 13,320.00
Sand = 4 cu.m. 300 PhP 1,110.00
Gravel = 7 cu.m. 500 PhP 3,700.00
10mm RSB = 100 length 120 PhP 11,988.00
#16 G.I. Tiewire = 5 kgs. 45 PhP 226.19
#3 CW Nails = 19 bd.ft. 45 PhP 832.50
#4 CW Nails = 22 bd.ft. 45 PhP 999.00
Welding Rod = 2 kgs. 80 PhP 177.60
Cutting Disc = 3 pcs. 120 PhP 355.20
Steel Deck = 41 ln.m. 580 PhP 23,606.00
TOTAL PhP 30,344.19

TOTAL COST = PhP 121,150.19

5.) MASONRY WORKS


DESCRIPTION QTY. UNIT PRICE AMOUNT
4"CHB(Hollow blocks) = 874 pcs. 11 PhP 9,609.60
Cement = 26 bags 200 PhP 5,162.98
Sand = 3 cu.m. 300 PhP 855.04
Plastering Cement = 14 bags 200 PhP 2,830.46
Plastering Sand = 1 cu.m. 300 PhP 235.87
10mm Dia. RSB = 55 pcs. 120 PhP 6,545.45
#16 G.I. Tiewire = 2 kgs. 45 PhP 97.13

TOTAL COST = PhP 25,336.53


6.) CEILING WORKS
DESCRIPTION QTY. UNIT PRICE AMOUNT
Wall Angle = 8 pcs 90 PhP 720.00
Metal Furring = 13 pcs 135 PhP 1,687.50
Carrying Channel = 8 pcs 180 PhP 1,350.00
W-Clip = 38 pcs 5 PhP 187.50
Congcrete Nails = 2 kgs. 80 PhP 120.00
Blind Revits = 1 box 350 PhP 437.50
Cee Purlins = 12 pcs 500 PhP 6,000.00
Cement Bonded Board = 6 pcs 420 PhP 2,625.00

TOTAL COST = PhP 13,127.50

7.) STEEL WORKS/ ROOFING WORKS


DESCRIPTION QTY. UNIT PRICE AMOUNT
1.4 x 2 x 3 Angle Bar = 25 Length 1350 PhP 33,750.00
1.2 x 2 x 2 Angle Bar = 12 length 1150 PhP 13,800.00
Welding Rod = 10 kgs. 80 PhP 800.00
Blind Rivets = 3 Box 350 PhP 1,050.00
#4 Paint Brush = 3 Pcs. 35 PhP 105.00
Cutting Disc = 15 Pcs. 120 PhP 1,800.00
Pre-Painted Rib-type Long Span Roofing = 38 Ln.m. 400 PhP 15,200.00
Blind Rivets = 800 Pcs. 1.5 PhP 1,200.00
Pre-Painted Wall Flashing = 12 Pcs. 480 PhP 5,760.00
Pre-Painted Gutter = 7 Pcs. 650 PhP 4,550.00
Epoxy Primer Black = 3 Gals 685 PhP 2,055.00

TOTAL COST = PhP 80,070.00

8.) TILE WORKS


DESCRIPTION QTY. UNIT PRICE AMOUNT
60x60 Granite Tiles = 86 pcs. 140 PhP 12,040.00
30x60 Granite tiles = 207 pcs. 85 PhP 17,595.00
Cement = 12 bags 200 PhP 2,400.00
Tile Adhesive = 30 bags 350 PhP 10,500.00
Sand = 9 cu.m. 300 PhP 2,700.00
Tile Grout = 5 packs 100 PhP 500.00

TOTAL COST = PhP 45,735.00

9.) PAINTING WORKS


DESCRIPTION QTY. UNIT PRICE AMOUNT
LATEX PAINT
Skim Coat = 20 bags 780 PhP 15,600.00
Liquid Tile Primer = 5 gals 980 PhP 4,900.00
Flat Latex = 5 gals 759 PhP 3,795.00
Semi-Gloss Latex = 5 gals 1450 PhP 7,250.00
#3 Paint Roller = 4 sets 120 PhP 480.00
#4 Paint Roller = 4 sets 190 PhP 760.00
#1 Paint Brush = 4 pcs. 20 PhP 80.00
#2 Paint Brush = 4 pcs. 35 PhP 140.00
Musking Tape = 10 pcs. 65 PhP 650.00
Tex-A-Kot Primer = 5 gals 729 PhP 3,645.00
Epoxy Primer = 5 gals 845 PhP 4,225.00
Polituff = 3 gals 689 PhP 2,067.00
Mesh Tape = 10 pcs. 180 PhP 1,800.00
Epoxy Non-Sag = 3 gals 680 PhP 2,040.00

TOTAL COST = PhP 47,432.00

10.) DOORS AND WINDOWS


DESCRIPTION QTY. UNIT PRICE AMOUNT
DOORS
0.8m x 2.10m Panel Door w/ Door Jamb = 6 sets 5500 PhP 33,000.00
Entrance Door = 1 sets 3500 PhP 3,500.00
0.7m x 2.1m PVC Door = 3 sets 2500 PhP 7,500.00
WINDOWS
1.20m x 1.20m Sliding Glass Window w/ Analoc Frame = 2 sets 5000 PhP 10,000.00

TOTAL COST = PhP 54,000.00


11.) PLUMBING WORKS
DESCRIPTION QTY. UNIT PRICE AMOUNT
12.3 SANITARY LINES
SANITARY WORKS
PVC Pipe #4 Series 1000 = 5 length 735 PhP 3,675.00
PVC Wye #4 = 8 units 170 PhP 1,360.00
PVC Wye Reducer 4x3 = 8 units 126 PhP 1,008.00
PVC Wye Reducer 4x2 = 8 units 100 PhP 800.00
PVC Reducer 4x2 = 8 units 100 PhP 800.00
PVC Elbow #4x45 Deg. = 8 units 85 PhP 680.00
PVC Elbow #4x90 Deg. = 8 units 100 PhP 800.00
PVC Clean Out Plug #4 = 3 units 67 PhP 201.00
PVC Pipe #3 Series 1000 = 7 Length 550 PhP 3,850.00
PVC Wye #3 = 6 units 84 PhP 504.00
PVC Wye Reducer 3x2 = 6 units 63 PhP 378.00
PVC Elbow #3x45Deg = 6 units 42 PhP 252.00
PVC Elbow #3x90Deg = 6 units 55 PhP 330.00
PVC P-Trap #3 = 6 units 145 PhP 870.00
PVC Pipe #2 Series 1000 = 10 length 260 PhP 2,600.00
PVC Tee #2 = 8 units 38 PhP 304.00
PVC Elbow #2x45 Deg = 8 units 22 PhP 176.00
PVC Elbow #3x90 Deg = 8 units 26 PhP 208.00
Solvent Cement 400c = 5 can 227 PhP 1,135.00
Vulcaseal = 5 qrts 515 PhP 2,575.00
Pioneer A&B Non-Sag = 1 gals 2884 PhP 2,884.00
WATERLINE/WATER SUPPLY
PPR Pipe #2 = 3 length 1267 PhP 3,801.00
PPR Tee #2 = 4 units 90 PhP 360.00
PPR Tee Reducer 2x1 = 4 units 67 PhP 268.00
PPR Elbow #2 = 3 units 284 PhP 852.00
PPR Coupling Reducer 2x1 = 3 units 67 PhP 201.00
PPR Pipe #1 = 3 units 658 PhP 1,974.00
PPR Elbow #1 = 4 units 36 PhP 144.00
PPR Tee #1 = 4 units 42 PhP 168.00
PPR Coupling Reducer 1x1/2 = 4 units 16 PhP 64.00
PPR Tee #1/2 = 4 units 16 PhP 64.00
PPR Elbow #1/2 = 4 units 15 PhP 60.00
PPR Elbow Female Threaded #1/2 = 5 units 88 PhP 440.00
PPR Male Adaptor #1/2 = 3 units 88 PhP 264.00
PPR Coupling #1 = 4 units 19 PhP 76.00
PPR Gate Valve #2 = 2 units 762 PhP 1,524.00
PPR Gate Vavle #1 = 2 units 515 PhP 1,030.00
PPR Gate Valve #1/2 = 2 units 323 PhP 646.00
PPR Coupling #2 = 10 units 73 PhP 730.00
PPR Coupling #1/2 = 10 units 9 PhP 90.00
PPR Pipe #1/2 = 8 units 335 PhP 2,680.00
G.I. Pipe 4" Dia. = 0 lengths 5000 PhP -
G.I. Pipe 2" Dia. = 0 lengths 2500 PhP -
PLUMBING FIXTURES
Water Closet w. Tank Fittings = 1 units 3560 PhP 3,560.00
Lavatory Wall Type, pedestal = 1 units 2500 PhP 2,500.00
Sink Double = 0 units 3605 PhP -
Sink Single = 1 units 814 PhP 814.00
Sink Faucet = 3 units 814 PhP 2,442.00
Urinal Bowl = 0 units 7004 PhP -
Urinal Flush Valve w/ Sensor = 0 units 7004 PhP -
Lavatory Faucet = 0 units 922 PhP -
Angle Valve 1/2x1/2 = 3 units 217 PhP 651.00
Flexible Hose 1/2 x 1/2 = 3 units 227 PhP 681.00
Faucet 1/2 = 1 units 294 PhP 294.00
Angle Valve Double = 3 units 330 PhP 990.00
Sink Strainer 1 1/4 PVC = 1 units 258 PhP 258.00
Lavatory P-Trap Strainer #1" = 1 units 181 PhP 181.00
Strainer 4x4 Stainless = 3 units 67 PhP 201.00
Slop Sink Ceramic = 0 units 5356 PhP -
Wall Tpye Gooseneck Faucet = 1 units 700 PhP 700.00
Sink Strainer = 1 units 186 PhP 186.00
Shower Mixer w/ Telephone Shower = 1 units 2560 PhP 2,560.00
Pedestal Lavatory Handwash = 0 sets 7004 PhP -

TOTAL COST = PhP 56,844.00


12.) ELECTRICAL WORKS
DESCRIPTION QTY. UNIT PRICE AMOUNT
13.1 MAIN BREAKER
Circuit Breaker 225A 1- Phase W/ Enclosure = 1 units 8000 PhP 8,000.00
Circuit Breaker Panelboard with 8 Branches = 1 units 4800 PhP 4,800.00
Branches 1-Phase bolt on = 6 units 460 PhP 2,760.00
13.2 WIRES AND CABLES
THHN Wire #14mm2 = 45 mtrs 110 PhP 4,950.00
THHN Wire #5.5mm2 = 1.2 rolls 5850 PhP 7,020.00
THHN Wire #3.5mm2 = 1.3 rolls 3800 PhP 4,940.00
THHN Wire #2.0mm2 = 0.5 rolls 2900 PhP 1,450.00
Electrical Tape = 8 rolls 35 PhP 280.00
Rubber Tape = 8 rolls 85 PhP 680.00
13.3 PIPES AND FITTINGS
2' dia RSC Pipe = 1 pcs 1351 PhP 1,351.00
2" dia RSC Coupling = 1 pcs 195 PhP 195.00
2" dia RSC Elbow = 1 pcs 285 PhP 285.00
2" dia Entrance Cup = 1 pc 415 PhP 415.00
1/2" dia PVC Pipe SCH 40 = 15 pcs 85 PhP 1,275.00
3/4" dia PVC Pipe SCH 40 = 8 pcs 95 PhP 760.00
1" dia PVC Pipe SCH 40 = 4 pcs 125 PhP 500.00
Flexible Hose = 2 rolls 680 PhP 1,360.00
4"x4" Junction box with cover = 20 pcs 45 PhP 900.00
2"x4" Utility Box = 20 pcs 35 PhP 700.00
13.4 LIGHTING FIXTURES
Pin Light 6" Surface Type = 25 pcs 460 PhP 11,500.00
2-Gang Convenience Outlet "Grounding Type" = 16 sets 180 PhP 2,880.00
1-Gang Switch = 3 sets 95 PhP 285.00
2-Gang Switch = 5 sets 150 PhP 750.00
3-Gang Switch = 2 sets 185 PhP 370.00
Wall Lamp = 2 sets 870 PhP 1,740.00
Fourescent Light = 0 sets 900 PhP -
Chandelier = 0 sets 8500 PhP -

TOTAL COST = PhP 60,146.00

S U M M A R Y

ITEM NO. DESCRIPTION AMOUNT

1.) GENERAL REQUIREMENTS = PhP 29,000.00


2.) EARTHWORKS = PhP 30,000.00
3.) SHORING/SCAFFOLDINGS = PhP 22,375.00
4.) REINFORCING CONCRETE WORKS = PhP 121,150.19
5.) MASONRY WORKS = PhP 25,336.53
6.) CEILING WORKS = PhP 13,127.50
7.) STEEL WORKS/ ROOFING WORKS PhP 80,070.00
8.) TILE WORKS PhP 45,735.00
9.) PAINTING WORKS PhP 47,432.00
10.) DOORS AND WINDOWS = PhP 54,000.00
11.) PLUMBING WORKS = PhP 56,844.00
12.) ELECTRICAL WORKS = PhP 60,146.00
TOTAL MATERIALS COST = PhP 585,216.22

TOTAL LABOR COST 50% , DESIGN & SUPERVISION = PhP 263,347.30

TOTAL CONSTRUCTION COST = PhP 848,563.52

Prepared By: Approved By:

Allan C. Amido Jr. Lorainne Ebeo


Civil Engineer Owner
Prices
Item Unit Unit Price
Portland Cement bags ₱ 200.00
Sand cu.m. ₱ 300.00
3/4 Gravel cu.m. ₱ 500.00
10mm RSB Length ₱ 120.00
16mm RSB Length ₱ 300.00
12mm RSB Length
20mm RSB Length
10mm phenolic Plywood Sheet ₱ 400.00
2X2X12 Coco Lumber bd.ft. ₱ 18.00
2x3x12 Coco Lumber bd.ft. ₱ 18.00
#16 G.I. Tiewire kgs. ₱ 45.00
#3 CWNails kgs. ₱ 45.00
#4 CWNails kgs. ₱ 45.00
1/2" CWNails kgs. ₱ 45.00
Welding Rod kgs. ₱ 80.00
Cutting Disk 4" pcs ₱ 120.00
Steel Deck Ln.m. ₱ 580.00
4" chb Pcs. ₱ 11.00
60x60 Granite Tiles pcs. ₱ 140.00
30x60 Granite Tiles pcs. ₱ 85.00
Tile Adhesive bags ₱ 350.00
Tile Grout pack ₱ 100.00
Pre-Painted Rib-Type Long Span Roofing ln.m. ₱ 400.00
Blind Revits pcs ₱ 1.50
Pre-Painted Wall Flashing pcs ₱ 480.00
Pre-Painted Gutter pcs ₱ 650.00
1.4 x 2 x 3 Angle Bar Length ₱ 1,350.00
1.2 x 2 x 2 Angle Bar Length ₱ 1,150.00
Blind Revits box ₱ 350.00
CONCRETE WORKS # of Vertical Bars 2 pcs
20 mm
b
COLUMN-1 0.3 m # of Extra Vertical Bars 4 pcs
20 mm
COLUMN-1
No. of Stirrups w VOLUME = 3 Cu.m.
43.0 pcs. 0.3 m Cement = 26 Bags
10 mm RSB Sand (5 Cu.m./Load) = 2 Cu.m.
Gravel (3/4 Crushed Gravel) = 3 Cu.m.
No. of Column 1 4 pcs. 20 mm RSB = 12 Pcs.
20 mm RSB = 24 Pcs.
10 mm RSB = 41 Pcs.
#16 G.I. Tiewire = 8 Kgs.
no. of Intersections Plastering Cement(Class A) = 8 Bags
1032 Plastering Sand (Class A) = 1.00 Cu.m.
Surface Area 3/4" Thk. Ordinary Plywood(2 uses) = 7 Pcs.
36 2x2x12' Coco Lumber = 168 Bd.Ft.
Length of Form Lumber #2 CW Nails = 28.8 Kgs.
152 #4 CW Nails = 18 Kgs.
No. Of Lumber
42
Height of Column (from top of Footing To
Roofbeam

7.5 m

FOOTING-1
VOLUME = 1.44 Cu.m.
Cement = 14.00 Bags
Sand (5 Cu.m./Load) = 1 Cu.m.
Gravel (3/4 Crushed Gravel) = 2 Cu.m.
12 mm RSB = 14 Pcs.
#16 G.I. Tiewire = 1 Kgs

0.25 m

# of 12mm matting along


8 pcs
"b"
no. of Intersections
64

12 mm Rsb Steel Matting

b
1.2 m
# of 12mm matting along
8 pcs
"w"

w
1.2 m

# of Vertical Bars 4 pcs


12 mm
b
COLUMNS-2 0.4 m # of Extra Vertical Bars 4 pcs
12 mm
COLUMN-2
No. of Stirrups w VOLUME = 0 Cu.m.
27.0 pcs. 0.4 m Cement = 0 Bags
10mm RSB Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
No. of Column 1 0 pcs. 12 mm RSB = 0 Pcs.
12 mm RSB = 0 Pcs.
10mmm RSB = 0 Pcs.
#16 G.I. Tiewire = 0 Kgs.
no. of Intersections Plastering Cement(Class A) = 0 Bags
0 Plastering Sand (Class A) = 0.00 Cu.m.
Surface Area 3/4" Thk. Ordinary Plywood(2 uses) = 0 Pcs.
0 2x2x12' Coco Lumber = 0 Bd.Ft.
Length of Form Lumber #2 CW Nails = 0 Kgs.
0 #4 CW Nails = 0 Kgs.
No. Of Lumber
0
Height of Column (from top of Footing To
Roofbeam

3.5 m

FOOTING-2
VOLUME = 0 Cu.m.
Cement = 0.00 Bags
Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
16 mm RSB = 0 Pcs.
#16 G.I. Tiewire = 1 Kgs

0.3 m

# of 12mm matting along


"b" 9
no. of Intersections
81

16 mm

b
1.8 m
# of 12mm matting along
9
"w"

w
1.8 m

# of Vertical Bars 4 pcs


12 mm
b
COLUMN-3 0.1 m # of Extra Vertical Bars 4 pcs
12 mm
COLUMN-3
No. of Stirrups w VOLUME = 0 Cu.m.
28.0 pcs. 0.2 m Cement = 0 Bags
10mm RSB Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
No. of Column 1 0 pcs. 12 mm RSB = 0 Pcs.
12 mm RSB = 0 Pcs.
10mmm RSB = 0 Pcs.
#16 G.I. Tiewire = 0 Kgs.
no. of Intersections Plastering Cement(Class A) = 0 Bags
0 Plastering Sand (Class A) = 0.00 Cu.m.
Surface Area 3/4" Thk. Ordinary Plywood(2 uses) = 0 Pcs.
0 2x2x12' Coco Lumber = 0 Bd.Ft.
Length of Form Lumber #2 CW Nails = 0 Kgs.
0 #4 CW Nails = 0 Kgs.
No. Of Lumber
0
Height of Column (from top of Footing To
Roofbeam

3.8 m

FOOTING-3
VOLUME = 0 Cu.m.
Cement = 0.00 Bags
Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
12 mm RSB = 0 Pcs.
#16 G.I. Tiewire = 1 Kgs

0.2 m

# of 12mm matting along


"b" 9
no. of Intersections
81

12 mm

b
1.0 m
# of 12mm matting along
"w" 9

w
1.0 m

# of Vertical Bars 4 pcs


12 mm
b
COLUMN-4 0.25 m # of Extra Vertical Bars 4 pcs
12 mm
COLUMN-4
No. of Stirrups w VOLUME = 0 Cu.m.
22.0 pcs. 0.25 m Cement = 0 Bags
10mm RSB Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
No. of Column 1 0 pcs. 12 mm RSB = 0 Pcs.
12 mm RSB = 0 Pcs.
10mmm RSB = 0 Pcs.
#16 G.I. Tiewire = 0 Kgs.
no. of Intersections Plastering Cement(Class A) = 0 Bags
0 Plastering Sand (Class A) = 0.00 Cu.m.
Surface Area 3/4" Thk. Ordinary Plywood(2 uses) = 0 Pcs.
0 2x2x12' Coco Lumber = 0 Bd.Ft.
Length of Form Lumber #2 CW Nails = 0 Kgs.
0 #4 CW Nails = 0 Kgs.
No. Of Lumber
0
Height of Column (from top of Footing To
Roofbeam
Height of Column (from top of Footing To
Roofbeam

2.3 m

FOOTING-4
VOLUME = 0 Cu.m.
Cement = 0.00 Bags
Sand (5 Cu.m./Load) = 0 Cu.m.
Gravel (3/4 Crushed Gravel) = 0 Cu.m.
16 mm RSB = 0 Pcs.
#16 G.I. Tiewire = 1 Kgs

0.2 m

# of 12mm matting along


"b" 9
no. of Intersections
81

16 mm

b
1.0 m
# of 12mm matting along
"w" 9

w
1.0 m
Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Pcs.
Pcs.
Kgs.
Bags
Cu.m.
Pcs.
Bd.Ft.
Kgs.
Kgs.

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Kgs

Volume = 8.64

Gravel Base = 0.576

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Pcs.
Pcs.
Kgs.
Bags
Cu.m.
Pcs.
Bd.Ft.
Kgs.
Kgs.

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Kgs

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Pcs.
Pcs.
Kgs.
Bags
Cu.m.
Pcs.
Bd.Ft.
Kgs.
Kgs.

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Kgs

Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Pcs.
Pcs.
Kgs.
Bags
Cu.m.
Pcs.
Bd.Ft.
Kgs.
Kgs.
Cu.m.
Bags
Cu.m.
Cu.m.
Pcs.
Kgs
CONCRETE WORKS
No. of Ties
b 28.0 pcs.
0.2 m 10 mm RSB
BEAM-1

12 mm h
# of Horizontal Bars 0.4 m
2 pcs.

12 mm
# Main Bars # of Intersections
4 pcs. 504
Surface Area
19 sq.m.
Length of Form Lumber
85.2
No. of Lumber
24

No. of Ties
b 18.0 pcs.
0.2 m 10 mm RSB
BEAM-2

12 mm h
# of Horizontal Bars 0.4 m
2 pcs.

12 mm
# Main Bars # of Intersections
4 pcs. 432
Surface Area
15 sq.m.
Length of Form Lumber
81.6
No. of Lumber
23

No. of Ties
b 29.0 pcs.
0.15 m 10 mm RSB
BEAM-3

12 mm h
# of Horizontal Bars 0.3 m
2 pcs.

12 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
No. of Ties
b 20.0 pcs.
0.15 m 10 mm RSB
BEAM-4

12 mm h
# of Horizontal Bars 0.3 m
4 pcs.

12 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
b 48.0 pcs.
0.25 m 10 mm RSB
BEAM-5

12 mm h
# of Horizontal Bars 0.3 m
4 pcs.

12 mm
# Main Bars # of Intersections
2 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
30.0 pcs.
BEAM-6 0.25 m 10 mm RSB

16 mm h
# of Horizontal Bars 0.5 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
No. of Ties
34.0 pcs.
BEAM-7 0.2 m 10 mm RSB

16 mm h
# of Horizontal Bars 0.4 m
0 pcs.

20 mm
# Main Bars # of Intersections
8 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
36.0 pcs.
0.2 m 10 mm RSB
BEAM-8

16 mm h
# of Horizontal Bars 0.4 m
8 pcs.

20 mm
# Main Bars # of Intersections
pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
12 mm RSB
12 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 3 #2 CW Nails
#4 CW Nails
5.1 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
12 mm RSB
12 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 4 #2 CW Nails
#4 CW Nails
3.1 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
12 mm RSB
12 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
5.1 m
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
12 mm RSB
12 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
3.1 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
12 mm RSB
12 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
8.3 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
5.0 m
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
6.0 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Height of Column (from top of Footing To
Roofbeam No. of Beams 0 #2 CW Nails
#4 CW Nails
5.4 m
= 1.22 Cu.m.
= 12 Bags
= 1 Cu.m.
= 2 Cu.m.
= 13 Pcs.
= 7 Pcs.
= 20 Pcs.
= 4 Kgs.
= 5 Bags
= 1 Cu.m.
= 6 Pcs.
= 96 Bd.Ft.
= 15.2 Kgs.
= 9.5 Kgs.

= 0.99 Cu.m.
= 10 Bags
= 1 Cu.m.
= 1 Cu.m.
= 10 Pcs.
= 5 Pcs.
= 18 Pcs.
= 4 Kgs.
= 4 Bags
= 1 Cu.m.
= 7 Pcs.
= 92 Bd.Ft.
= 12 Kgs.
= 7.5 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
= 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.
= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
= 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
= 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
= 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.
= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
= 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags 22
= 0 Cu.m. 2
= 0 Cu.m. 3
= 0 Pcs. 23
= 0 Pcs. 12
= 0 Pcs. 38
= 0 Kgs. 8
= 0 Bags 9
= 0 Cu.m. 2
= 0 Pcs. 13
= 0 Bd.Ft. 188
= 0 Kgs. 27.2
= 0 Kgs. 17
CONCRETE WORKS
No. of Ties
b 28.0 pcs.
0.15 m 10 mm RSB
TIE-BEAM-1

16 mm h
# of Horizontal Bars 0.25 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 224
Surface Area
9 sq.m.
Length of Form Lumber
51.47
No. of Lumber
14

No. of Ties
b 18.0 pcs.
0.15 m 10 mm RSB
TIE-BEAM-2

16 mm h
# of Horizontal Bars 0.25 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 216
Surface Area
8 sq.m.
Length of Form Lumber
53.2
No. of Lumber
15

No. of Ties
b 21.0 pcs.
0.2 m 10 mm RSB
TIE-BEAM-3

16 mm h
# of Horizontal Bars 0.4 m
6 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
No. of Ties
b 30.0 pcs.
0.2 m 10 mm RSB
TIE-BEAM-4

16 mm h
# of Horizontal Bars 0.4 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
b 7.0 pcs.
0.1 m 10 mm RSB
TIE-BEAM-5

16 mm h
# of Horizontal Bars 0.2 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
10.0 pcs.
TIE-BEAM-6 0.2 m 10 mm RSB

16 mm h
# of Horizontal Bars 0.4 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
No. of Ties
10.0 pcs.
TIE-BEAM-7 0.2 m 10 mm RSB

16 mm h
# of Horizontal Bars 0.3 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0

No. of Ties
14.0 pcs.
0.2 m 10 mm RSB
TIE-BEAM-8

16 mm h
# of Horizontal Bars 0.3 m
0 pcs.

20 mm
# Main Bars # of Intersections
4 pcs. 0
Surface Area
0 sq.m.
Length of Form Lumber
0
No. of Lumber
0
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 2 #2 CW Nails
#4 CW Nails
5.1 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 3 #2 CW Nails
#4 CW Nails
3.1 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
3.5 m
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
5.0 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
0.0 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
0.0 m
BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Length of Beam (from end to end) No. of Beams 0 #2 CW Nails
#4 CW Nails
0.0 m

BEAM-1
VOLUME
Cement
Sand (5 Cu.m./Load)
Gravel (3/4 Crushed Gravel)
20 mm RSB
16 mm RSB
10 mm RSB
#16 G.I. Tiewire
Plastering Cement(Class A)
Plastering Sand (Class A)
3/4" Thk. Ordinary Plywood(2 uses)
2x2x12' Coco Lumber
Height of Column (from top of Footing To
Roofbeam No. of Beams 0 #2 CW Nails
#4 CW Nails
0.0 m
= 0.3825 Cu.m.
= 4 Bags
= 1 Cu.m.
= 1 Cu.m.
= 9 Pcs.
= 0 Pcs.
= 10 Pcs.
= 2 Kgs.
= 2 Bags
= 1 Cu.m.
ry Plywood(2 uses) = 2 Pcs.
= 56 Bd.Ft.
= 7.2 Kgs.
= 4.5 Kgs.

= 0.3488 Cu.m.
= 4 Bags
= 1 Cu.m.
= 1 Cu.m.
= 8 Pcs.
= 0 Pcs.
= 9 Pcs.
= 2 Kgs.
= 2 Bags
= 1 Cu.m.
ry Plywood(2 uses) = 3 Pcs.
= 60 Bd.Ft.
= 6.4 Kgs.
= 4 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
ry Plywood(2 uses) = 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.
= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
ry Plywood(2 uses) = 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
ry Plywood(2 uses) = 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
ry Plywood(2 uses) = 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.
= 0 Cu.m.
= 0 Bags
= 0 Cu.m.
= 0 Cu.m.
= 0 Pcs.
= 0 Pcs.
= 0 Pcs.
= 0 Kgs.
= 0 Bags
= 0 Cu.m.
ry Plywood(2 uses) = 0 Pcs.
= 0 Bd.Ft.
= 0 Kgs.
= 0 Kgs.

= 0 Cu.m.
= 0 Bags 8
= 0 Cu.m. 2
= 0 Cu.m. 2
= 0 Pcs. 17
= 0 Pcs. 0
= 0 Pcs. 19
= 0 Kgs. 4
= 0 Bags 4
= 0 Cu.m. 2
ry Plywood(2 uses) = 0 Pcs. 5
= 0 Bd.Ft. 116
= 0 Kgs. 13.6
= 0 Kgs. 8.5
CONCRETE WORKS

GROUND FLOOR

Area of Ground Floor = 37 sq.m.


Thickness = 0.1 m
10mm RSB = 37 pcs.
Cement = 33.3 bags
Sand = 1.85 cu.m.
3/4 Gravel = 3.7 cu.m.
#16 G.I. Tiewire = 2.513 kgs.

SECOND FLOOR

Area of Second Floor = 37 sq.m.


Thickness = 0.1 m
10mm RSB = 62.9 pcs.
Cement = 33.3 bags
Sand = 1.85 cu.m.
3/4 Gravel = 3.7 cu.m.
#16 G.I. Tiewire = 2.513 kgs.
Steel Deck = 40.7 ln.m.
2x2x12 Coco Lumber = 592 bd.ft.
2x3x12 Coco Lumber = 814 bd.ft.
#3 CW Nails = 18.5 kgs.
#4 CW Nails = 22.2 kgs.
Welding Rod = 2.22 kgs.
Cutting Disc = 2.96 pcs.

THIRD FLOOR

Area of Second Floor = 0 sq.m.


Thickness = 0.1 m
10mm RSB = 0 pcs.
Cement = 0 bags
Sand = 0 cu.m.
3/4 Gravel = 0 cu.m.
#16 G.I. Tiewire = 0 kgs.
Steel Deck = 0 ln.m.
2x2x12 Coco Lumber = 0 bd.ft.
2x3x12 Coco Lumber = 0 bd.ft.
#3 CW Nails = 0 kgs.
#4 CW Nails = 0 kgs.
Welding Rod = 0 kgs.
Cutting Disc = 0 pcs.
37
500

0 Cement = 66.6
Sand = 3.7
3/4 Gravel = 7.4
#16 G.I. Tiewire = 5.026
Steel Deck = 40.7
2x2x12 Coco Lumber = 592
2x3x12 Coco Lumber = 814
#3 CW Nails = 18.5
#4 CW Nails = 22.2
Welding Rod = 2.22
Cutting Disc = 2.96
10mm RSB = 99.9
66.6 bags
3.7 cu.m.
7.4 cu.m.
5.026 kgs.
40.7 ln.m.
592 bd.ft.
814 bd.ft.
18.5 kgs.
22.2 kgs.
2.22 kgs.
2.96 pcs.
99.9 pcs.
MASONRY WORKS
10 mm Vertical RSB
4 Inches CHB wall

10 mm Horizontal RSB

0.2

Wall
0.3
Footing TOTAL WIDTH OF WALL
15
m

DOORS & WINDOWS

0.8 0.7 0.7

2.1 2.1

FGL FGL

Main Doors Bedroom Doors PVC doors for C.R.s


Door-1 Door-2 Door-3
6 sets 1 sets 3 sets
Area = 10.08 Sq.m. Area = 1.47 Sq.m. Area = 4.41 Sq.m.

1.2 0.6
1.2

Sliding Windows Sliding Windows


Window - 1 Window - 2
2 sets 4 sets
Area = 2.88 Sq.m. Area = 1.44 Sq.m.

0.6

DOORS & WINDOWS


DOORS
0.8 X 2.1 Panel Door w/ Door Jamb
0.7 X 2.1 Panel Door(Bedrooms) w/ Door jamb
0.7 X 2.1 PVC Door(C.R.) w/ Jamb
2 X 2.1 Sliding Glass Door w/ Analoc Frame
1.2 X 1.2 Sliding Glass Window w/ Analoc Frame
0.6 X 0.6 Sliding Glass Window w/ Analoc Frame
2.1 X 1.3 Sliding Glass Window w/ Analoc Frame
2 X 1.2 Sliding Glass Window w/ Analoc Frame
0.6 X 2.1 Sliding Glass Window w/ Analoc Frame

2.1

Sliding Windows
Window - 5
0 sets
Area = 0 Sq.m.
Masonry Works
Area = 65.52 Sq.m.
4 " CHB = 873.6 Pcs.
Cement = 25.81488 Sq.m.
Sand = 2.85012 Sq.m.
#16 G.I. Tiewire = 2.1584906 Sq.m.
10 mm RSB = 54.545455 Sq.m.
Plastering Sand = 0.78624 Sq.m.
Plastering Cement = 14.15232 Sq.m.

H
6
m

Total Length of RSB : 300.00


No. of Intersections : 286

2.1 2.1

FGL FGL

Sliding Glass Door


Door- 1
1 sets
Area = 4.2 Sq.m.

2.1
0.6

1.3

Sliding Windows
Window - 3
0 sets
Area = 0 Sq.m.

= 6 sets
b = 1 sets
= 3 sets
= 1 sets
me = 2 sets
me = 4 sets
me = 0 sets
me = 0 sets
me = 0 sets
2
1.2

Sliding Windows
Window - 4
0 sets
Area = 0 Sq.m.
CEILING WORKS

AREA OF CEILING = 25 sq.m.


PERIMETER OF CEILING = 12 m
AREA OF DRY WALL = 0 sq.m.

Ceiling Works

Wall Angle = 8 Pcs.


Metal Furring = 12.5 Pcs.
Carrying Channel = 7.5 Pcs.
W-Clip = 37.5 Pcs.
Concrete Nails = 1.5 Kgs.
Blind Rivets = 1.25 Box
Cement Bonded Board = 12 Pcs.
Cee Purlins = 6.25 Pcs.

Dry Wall Double wall

Metal Studs = 0 Pcs.


Carrying Channel = 0 Pcs.
W-Clip = 0 Pcs.
Concrete Nails = 0 Kgs.
Blind Rivets = 0 Box
Cement Bonded Board = 0 Pcs.
CABINET WORKS

2.5
m

2.5

Thickness = 0.5 m

total number of Cabinets = 0


CABINET - Bedrooms CABINET - Kitchen
Total Area = 0 Total Area = 3

3/4" Marine Plyboard (2.4x1.2) = 0 pcs. 1" Marine Plyboard (2.4x1.2)


1 1/2 Finishing Nails = 0 kgs. 1 1/2 Finishing Nails
2x4 Cabinet Hidden Hinges = 0 sets 2x4 Cabinet Hidden Hinges
Cabinet Handle = 0 sets Cabinet Handle
Stickwell = 0 pcs. Stickwell
1" Finishing Nails = 0 kgs. 1" Finishing Nails

0.5 0.5 0.5 0.5

Thickness = 0.5 m
total number of Cabinets = 0

0.4 0.4 0.4 0.4


Thickness = 0.5 m
total number of Cabinets = 0
oard (2.4x1.2) = 2 pcs.
Nails = 1 kgs.
dden Hinges = 0 sets
= 0 sets
= 1 pcs.
ils = 1 kgs.

0.5 0.5

0.6 TOP

0.4 0.4

BOTTOM

0.8
0.8
PAINTING WORKS

Total Area to be Painted (Cement Wall) = 201.04 sq.m.


Total Area of Ceiling and Drywall = 25 sq.m.
Total Area of Cabinets = 3 sq.m.
Total Area of Steel

PAINTING WORKS
LATEX PAINT
Skim Coat = 5 bags
Penetrating Sealer = 6 gals
Liquid Tile Primer = 6 gals
Flat Latex = 10 gals
Semi-Gloss Latex = 10 gals
Latex Color = 3 pint
#3 Paint Roller = 3 sets
#4 Paint Roller = 2 sets
#7 Paint Roller = 2 sets
#1 Paint Brush = 2 pcs.
#2 Paint Brush = 3 pcs.
#3 Paint Brush = 2 pcs.
#4 Paint Brush = 3 pcs.
Musking Tape = 5 pcs.
Tex-A-Kot Primer = 1 gals
Epoxy Primer = 6 gals
Polituff = 6 gals
Mesh Tape = 1 pcs.
Epoxy Non-Sag = 1 gals

ENAMEL PAINT
Polituff = 1 gals.
Flat Wall Enamel = 1 gals.
Semi Gloss Enamel = 1 gals.
Oil Tinting Color = 1 pint
Enamel Primer = 1 gals.
Wood Sealer = 1 gals.
Sanding Sealer = 1 gals.
Wood Stain = 1 gals.
#1 Paint Brush = 1 pcs.
#2 Paint Brush = 1 pcs.
#3 Paint Brush = 1 pcs.
#4 Paint Brush = 1 pcs.
TILE WORKS C.R. 1
Total Floor Area of House = 30 sq.m.
Floor Area of Tiles for C.R. 1 = 25.71 sq.m.
Floor Area of Tiles for C.R. 2 = 10.32 sq.m.
Floor Area of Tiles for C.R. 3 = 0 sq.m.
Total Floor Area of Exterior Flooring = 0 sq.m.

TILE WORKS
MAIN HOUSE TILES

0.6 X 0.6 Granite Tiles = 86.0 Pcs.


0.3 x 0.6 Granite Tiles = 207.0 Pcs.
Tile Adhesive (Heavy Duty) = 30.0 bags
Cement = 12.0 bags
Sand = 9.0 Cu.m.
0.6 X 0.6 Granite Tiles = 0.0 Pcs.
Tile Grout = 5.0 Packs

C.R. 2
C.R. 3
C.R. 1

Height of Tiled Area in C.R. =

C.R. DOOR
0.7

Door
Area = 25.71
3.7

C.R. 2

Height of Tiled Area in C.R. =

C.R. DOOR
0.7

1.5
Door
Area = 10.32
2.1

C.R. 3

Height of Tiled Area in C.R. =

C.R. DOOR
0.7

1.2

Door
Area = 1.47
2.3
1.2 m

C.R. WINDOW
0

0.0

2.1
Area = 0

No. of C.R. = 1

25.71

1.2 m

C.R. WINDOW
0

0.0
2.1
Area = 0

No. of C.R. = 1

10.32

0 m

C.R. WINDOW
0.6

0.6

2.1
Area = 0.36

No. of C.R. = 0

1.47
ROOFING WORKS

Aera of Roofing = ln.m.

TRUSS-1
no. of trusses 0.0

Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 0.0 m


Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins 0.0 m

2.8 m
2.0 m 1.8
1.0 m 1.2

TRUSS-2
no. of trusses 0.0

Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 0.0 m


Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins 0.0 m

1.6 m
1.0 m 0.9
0.6 m 0.7
ROOFING WORKS

1.4 X 2.0 X 4.0 Cee Purlins = 49.0 Length


1.2 x 2.0 x 3.0 Cee Purlins = 30.0 length
Welding Rod = 63.2 kgs.
Blind Rivets = 7.9 Box
Teckscrew = 15.8 Box
Ribtype Pre-Painted Longspan Roofing = 0.0 Ln.m.
Wall Flashing = 0.0 Pcs.
Roof Gutter = 0.0 Pcs.
Ridge Roll = 0.0 Pcs.
Insulation = 0.0 Rolls
Vulcaseal = 0.0 Pcs.
Water Proofing = 0.0 Gals
#4 Paint Brush = 0.0 Pcs.
Cutting Disc = 0.0 Pcs.
Epoxy Primer Black = 0.0 Gals
#16 G.I. Tiewire = 0.0 kgs.
1.2 x 2.0 x 3.0 Cee Purlins = 0.0 length
1" Flat Bar = 0.0 Length
3.1 m
1.6
3.0 m
2.5 2.5
1.8
1.2

3.5

2.1 m
1.4
2.0 m
1.5 1.5
0.9
0.7

3.5
0.8

OTHER
HALF TRUSS-1
no. of trusses 17.0
.
Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 268.6 m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins 163.2 m
7.2 m

m 1.9
1.6
1.2 0.8
0.8
0.5 m

7.0 m

HALF TRUSS-2
no. of trusses 0.0

Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 0.0 m


Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins 0.0 m
6.4 m

m 1.8
1.4
1.2
0.8
0.4 m

4.9 m
HALF TRUSS-3
no. of trusses 0.0
Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 0.0 m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins 0.0 m

3.6 m

m 1.8
1.4
1.2
0.8
0.4 m

2.2 m

OTHER TRUSSES
1.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins 0.0 m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
2.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
3.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
4.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
5.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
6.0 Total Legnth of 1.4 x 2.0 x 4.0 Cee Purlins m
Total Legnth of 1.2 x 2.0 x 3.0 Cee Purlins m
1.2 1.6
m m

0.8 1.2
m m
0.8 1.2
m m