2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class
of soil / murrrum except rock up to a depth of 1.50 mtrs. Including shoring, strutting,
dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.
a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 1284.86 cmt. 0.00
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 905.15 cmt. 0.00
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O cmt.
4 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well
compacted with power roller without damaging foundation filling voids with quarry dust,
watering, ramming, compacting if required for edges and corners use plate compactor etc. 827.28 cmt 0.00
complete as directed by Engineer In charge.
PAGE NO:1
8 REINFORCEMENT STEEL FE 500
Providing & Supplying & fixing in position High yield deformed bar Reinforcement
confirming to IS – 1139 or cold Twisted bars, TOR steel / TMT / or Equivalent
Reinforcement bars confirming to IS – 1786 for RCC construction including transporting
(i.e. loading & unloading) the steel from store/issue points to site of works including
unloading from Trucks/Trailers, cleaning, de coiling, cutting, bending to required shape
and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding
wire, placing with proper cover block, support chairs, overlap, spacers, etc. complete in all
respect as directed by Engineer IN charge in foundation and up to Plinth level.
9 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of
approved quality for all type of concrete elements vertical, horizontal or inclined including
scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary nails, wires,
locking pins,Guggus etc keeping in position till concrete is laid and members have 1342.63 sqm 0.00
acquired required strength, removal thereafter, applying shuttering oil etc. complete as
directed by Engineer-in-Charge.
13 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including
saw cutting of concrete floors / pavement to the required depth, filling the same with 2068.20 rmt 0.00
polysulpide, etc. complete.as per instruction of Engg in charge.
15 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I
grout to consume shall confirm to company Equavalient of SIKA make / Fair mate / Dr.
fixit etc. as per I S Specification including the all the over head expesnes and the edges 3.24 cmt 0.00
shall be shampered etc completed as directed by Engineer Incharge.
16 Re-bar
Providing, drilling & fixing anchor bars in concrete using Hilti HY-150 chemical grout as
per as per manufacturer's specifications. [ necessary pull out test --if recommended by
consulltant have to be proved , which rate shall not be extra paid etc complete as
directed by engg. incharge .
PAGE NO:2
a 8mm dia #NAME? NOS #NAME?
b 16mm dia 110.00 NOS 0.00
PAGE NO:3
FOOTING
Sr.
Particular Shape of Bar
no. L B H
0.150
Number of foundation 4.000
0.150
BAR BENDING SCHEDULE - FOOTING
Dia of
No. of No. of Spacing Length in
Shape of Bar Bar in
bar item in mtr mtr
mm
10 14 4 0.150 2.400
0.150
2.100
10 14 4 0.150 2.400
0.150
2.100
GRAND TOTAL
Weight in Kg
Total Total wt Total wt Total wt
length in Total wt Total wt
8mm 10mm 16mm
mtr 12mm 20mm
(0.395 (0.617 (1.58
(0.89 kg/mt) (2.47 kg/mt)
kg/mt) kg/mt) kg/mt)
134.400 - 82.925 - - -
134.400 - 82.925 - - -
0.000
COLUMN
Sr.
Particular Shape of Bar
no. L B H
1-SET 0.270
→ TIES TYPE 2
1-SET
0.270
TIES TYPE 3
1-SET
0.270
TIES TYPE 4
1-SET
0.070
LINK TYPE 1
1-SET
0.270
LINK TYPE 2
1-SET
0.270
BAR BENDING SCHEDULE - COLUMN
Dia of
No. of No. of Spacing Length
Shape of Bar Bar in
bar item in mtr in mtr
mm
0.100
12 8 4 15.826
0 8 4 15.726
0.450
0.270
0.075 8 104 4 0.075 1.230
0.075 0.270 8 46 4 0.150 0.960
0.270
0.120
0.075 0 104 4 0.075 0.930
0.075 0.270
0.120
-0.080
0.075 0 150 4 0.075 0.530
0.075 0.270
-0.080
0.270
0.075 0 150 4 0.075 0.830
0.075 0.070
0.270
0.075
0.075
GRAND TOTAL
MN
Weight in Kg
Total Total wt Total wt Total wt Total wt
length in 8mm 10mm 12mm 16mm
mtr (0.395 (0.617 (0.89 (1.58
kg/mt) kg/mt) kg/mt) kg/mt)
506.432 - - 450.724 -
503.232 - - - -
511.680 202.114 - - -
176.640 69.773 - - -
386.880 - - - -
318.000 - - - -
498.000 - - - -
252.000 99.540 - - -
252.000 99.540 - - -
Total wt Total wt
20mm 25mm
(2.47 kg/mt) (3.85 kg/mt)
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.000 0.000
TIE BEAM
Sr.
Particular
no. L B H
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
6 CTB2 7.200 0.230 0.400
→
Number of beams 1.000
→ STIRRUPS
BAR BENDING SCHEDULE - GB/PB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
0.250 1.825
16 1 2
0.180
0.075 8 38 2
0.350 0.075 0.350
0.180
0.180
0.075 8 26 2
0.350 0.075 0.350
0.180
0.250 1.313
0 2 1
0.180
0.075 8 12 1
0.350 0.075 0.350
0.180
0.250 1.825
16 1 6
0.180
0.075 8 38 6
0.350 0.075 0.350
0.180
0.250 2.738
16 1 6
0.180
0.075 8 38 6
0.350 0.075 0.350
0.180
0.250 7.150 0.250 16 2 1
0.250 8.938
16 2 1
0.180
0.075 8 73 1
0.350 0.075 0.350
0.180
ING SCHEDULE - GB/PB
Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
4.150 24.900 - -
4.150 16.600 - -
2.075 4.150 - -
4.150 24.900 - -
5.975 23.900 - -
2.988 5.975 - -
1.550 3.100 - -
3.125 9.375 - -
1.563 3.125 - -
4.150 74.700 - -
4.150 49.800 - -
2.075 12.450 - -
4.150 74.700 - -
5.975 71.700 - -
2.988 17.925 - -
18.375 55.125 - -
9.188 18.375 - -
- 39.342 - -
- 26.228 - -
- 6.557 - -
- - - -
- 39.342 - -
- 37.762 - -
- 9.441 - -
- - - -
- 4.898 - -
- 14.813 - -
- - - -
- - - -
- 118.026 - -
- 78.684 - -
- 19.671 - -
- - - -
- 118.026 - -
- 113.286 - -
- 28.322 - -
- - - -
- 24.174 - -
- 87.098 - -
- 29.033 - -
- - - -
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
BAR BENDING SCHEDULE - SLAB BEAM
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
0.250 2.025
16 2 4
0.250
0.075 10 42 4
0.600 0.075 0.600
0.250
0.180
0.075 10 18 4
0.350 0.075 0.350
0.180
0.250 2.213
0 5 1
0.180
0.075 8 31 1
0.350 0.075 0.350
0.180
G SCHEDULE - SLAB BEAM
Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
4.550 54.600 - -
4.550 36.400 - -
4.550 36.400 - -
2.275 18.200 - -
3.050 36.600 - -
3.050 24.400 - -
3.050 24.400 - -
1.525 6.100 - -
3.450 10.350 - -
3.450 6.900 - -
4.925 24.625 - -
2.463 12.313 - -
- 86.268 - -
32.396 - - -
- 57.512 - -
- 28.756 - -
- - - -
- 57.828 - -
21.716 - - -
- 38.552 - -
- 9.638 - -
- - - -
- 16.353 - -
- - - -
- 38.908 - -
- - - -
- - - -
TOTAL wt = 628.4147 kG
TOP BAR
LENGTH NO. TOTAL LENUNIT WT. TOTAL WT.
0.75 113 170 0.617 104.81 KG
16.77 4 67.07 0.395 26.465 KG
EXTRA TOP OVER MAIN BEAM
SLABS
TOP SLAB 5170 5170 THK. 150 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 5.17 10 150 35 180.95 0.617 111.567
BOTTOM 5.17 10 150 35 180.95 0.617 111.567
BTM SLAB 5170 5170 THK. 200 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 5.17 10 150 35 180.95 0.617 111.567
BOTTOM 5.17 10 150 35 180.95 0.617 111.567
GALLARY S 1200 1800 THK. 120 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 1.2 8 150 13 15.6 0.395 6.156
BOTTOM 1.8 8 150 9 16.2 0.395 6.393
TOTAL WT. (TOP & BOTTOM) 12.548