The document provides a bill of quantities (BOQ) for extension work on a factory shed in Gujarat, India. It includes 15 line items with descriptions and quantities for excavation, backfilling, concrete work, masonry, reinforcement, formwork, flooring, plastering, groove cutting, and foundation bolt fixing up to the plinth level of the structure.

Uploaded by

Harsh Bhavsar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views

BBS Esr

The document provides a bill of quantities (BOQ) for extension work on a factory shed in Gujarat, India. It includes 15 line items with descriptions and quantities for excavation, backfilling, concrete work, masonry, reinforcement, formwork, flooring, plastering, groove cutting, and foundation bolt fixing up to the plinth level of the structure.

Uploaded by

Harsh Bhavsar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 43

BOQ OF EXTENSION WORK FOR FACTORY SHED-GUJARAT INFRA PIPE PVT LTD

AREA 4136.39325 SQM


PLINTH HEIGHT 0.9 RMT

SR.NO. DESCRIPTION OF ITEMS QTY. RATE UNIT AMOUNT

A UPTO PLINTH LEVEL


1 SURFACE DRESSING / SITE CLEANING
Labour charges for grubbing and clearing Road / land including clearing top soil,
including all plants, vegetations, dirts etc. complete,etc with dumping all the nonuseful
stuff materials into the plot boundary , as per instruction of site engg. for the location 4136.39 smt 0.00
[Max depth @ 150 mm assumed ]

2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class
of soil / murrrum except rock up to a depth of 1.50 mtrs. Including shoring, strutting,
dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.
a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 1284.86 cmt. 0.00
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 905.15 cmt. 0.00
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O cmt.

3 BACK FILLING WORK


Filling in foundation & in Plinth with selected(Non Expansive) earth spread in layers of
150 to 230 mm thickness to achieve required level and slope / gradient and compacted to
95% of proctor density and leveling finally as per the instruction of Engineer-In-Charge
inclusive cost of soil, transportation and all taxes and royalties .
a Available soil 1662.16 cmt 0.00
b Earth brought from outer side for Plinth filling
Murrum filling 1630.32 cmt 0.00

4 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well
compacted with power roller without damaging foundation filling voids with quarry dust,
watering, ramming, compacting if required for edges and corners use plate compactor etc. 827.28 cmt 0.00
complete as directed by Engineer In charge.

5 PLAIN CEMENT CONCRETE [M10-1:3:6]


Providing and laying cement concrete in foundation and plinth M:10 [Site mix] and curing
complete including cost of formwork as directed by Engineer In charge.
Total Qty. for Metal concrete(PCC) 381.04 cmt 0.00

6 RCC work [ in M25 Grade ]


Providing and laying controlled reinforced Cement Concrete of M25 grade with
20mm down size graded crushed stone aggregate including scaffolding, opening, recesses,
chamfering, finishing top surfaces vibrating, machine mixing tamping, curing (excluding
centering and shuttering) etc. complete as per the specifications, drawings and instruction of
Engineer - in- charge (excluding cost of reinforcement) for all elements of concrete

a Total Qty. for RCC footings 364.74 cmt. 0.00


b Total qty. for RCC columns (Pedestal ) 156.25 cmt. 0.00
c Total Qty. for RCC groundbeams 59.64 cmt. 0.00
d Total Qty. for copping beams 6.32 cmt. 0.00

7 BRICK MASONARY WORK


Providing and constructing Conventional Brick masonry in CM 1:6 (1 Cement and 6
Coarse sand) upto plinth with conventional size bricks having minimum crushing
strength of 35 Kg / Sq. Cm. including scaffolding, racking out joints, curing, watering etc.,
complete as directed by Engineer IN charge.
a Total qty. of brick work upto P.L. (230 mm thick) (1:6) proportion 10.72 cmt. 0.00

PAGE NO:1
8 REINFORCEMENT STEEL FE 500
Providing & Supplying & fixing in position High yield deformed bar Reinforcement
confirming to IS – 1139 or cold Twisted bars, TOR steel / TMT / or Equivalent
Reinforcement bars confirming to IS – 1786 for RCC construction including transporting
(i.e. loading & unloading) the steel from store/issue points to site of works including
unloading from Trucks/Trailers, cleaning, de coiling, cutting, bending to required shape
and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding
wire, placing with proper cover block, support chairs, overlap, spacers, etc. complete in all
respect as directed by Engineer IN charge in foundation and up to Plinth level.

a 8MM DIA 1.75 MT 0.00


b 10MM DIA 1.19 MT 0.00
c 12MM DIA 0.58 MT 0.00
d 16MM DIA 1.30 MT 0.00
e 20MM DIA 0.00 MT 0.00
f 25MM DIA 0.00 MT 0.00

9 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of
approved quality for all type of concrete elements vertical, horizontal or inclined including
scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary nails, wires,
locking pins,Guggus etc keeping in position till concrete is laid and members have 1342.63 sqm 0.00
acquired required strength, removal thereafter, applying shuttering oil etc. complete as
directed by Engineer-in-Charge.

10 RCC Tremix Flooring [M:25] --only concrete pourng work


Providing and laying conventional cement concrete M-25, 200 mm thick in alternate
panels for flooring. Panels shall be formed by MS channel 100 mm depth on all four sides
and bolted adequately to make the panel size as required. Entire concrete mass shall be
vibrated with screed vibrators and levelled etc ,including the cost of form work but 827.28 cmt 0.00
excluding cost of reinforcement, and curing by pounding the surface of concrete,
complete as directed by Engineer IN charge..

11 Outside Double coat Sand faced Plaster OR Mala Plaster


Providing and applying 20 mm th. double coat sandfaced or mala cement plaster on any
surface, consisting of 12 mm thick backing coat in CM 1:3 with water proofing compound
(1:Cement and 3:Coarse sand) & 8 mm thick finishing coat in CM 1:1 with water proofing
compound (Q 200ml /bag as dosage)(1:Cement and 1:Coarse sand) to walls, beams,
column, drain, bends, moulds, making grooves, pattas and all brick and RCC surfaces
164.74 smt. 0.00
including raking joints, scaffolding, curing finishing.The plaster surface shall have rough
finish by using sponge on all types of surfaces in line level and including all scaffolding
and curing & level at all level above plinth and upto ground floor level complete as
directed by Engineer IN charge

12 TRIMIX WORK-Final finisihing work


Extra for using "Tremix system " (vacuum dewatering system and smooth finishing and
after that smooth finish with power trowel) in flooring.etc complete incl.all cost and as per 4136.39 smt 0.00
instruction of Engg Incharge .

13 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including
saw cutting of concrete floors / pavement to the required depth, filling the same with 2068.20 rmt 0.00
polysulpide, etc. complete.as per instruction of Engg in charge.

14 Foundation Bolt Fixing


Labour charges for Positioning Foundation Bolts in the pedastals maintaining all the line
& level , confirming from the responsible Engineer etc as per detailed drawing, to keep
the bolts in position as required ,etc. complete as directed by Engineer In Charge. 722.00 nos 0.00

15 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I
grout to consume shall confirm to company Equavalient of SIKA make / Fair mate / Dr.
fixit etc. as per I S Specification including the all the over head expesnes and the edges 3.24 cmt 0.00
shall be shampered etc completed as directed by Engineer Incharge.

16 Re-bar
Providing, drilling & fixing anchor bars in concrete using Hilti HY-150 chemical grout as
per as per manufacturer's specifications. [ necessary pull out test --if recommended by
consulltant have to be proved , which rate shall not be extra paid etc complete as
directed by engg. incharge .

PAGE NO:2
a 8mm dia #NAME? NOS #NAME?
b 16mm dia 110.00 NOS 0.00

TOTAL AMOUNT FOR CIVIL WORK #NAME?

PAGE NO:3
FOOTING

Sr.
Particular Shape of Bar
no. L B H

1 F1 2.200 2.200 0.600

0.150
Number of foundation 4.000

0.150
BAR BENDING SCHEDULE - FOOTING

Dia of
No. of No. of Spacing Length in
Shape of Bar Bar in
bar item in mtr mtr
mm

10 14 4 0.150 2.400
0.150

2.100

10 14 4 0.150 2.400
0.150

2.100

GRAND TOTAL
Weight in Kg
Total Total wt Total wt Total wt
length in Total wt Total wt
8mm 10mm 16mm
mtr 12mm 20mm
(0.395 (0.617 (1.58
(0.89 kg/mt) (2.47 kg/mt)
kg/mt) kg/mt) kg/mt)

134.400 - 82.925 - - -

134.400 - 82.925 - - -

TOTAL 0.000 165.850 0.000 0.000 0.000


GRAND TOTAL 165.850
Total wt
25mm
(3.85
kg/mt)

0.000
COLUMN
Sr.
Particular Shape of Bar
no. L B H

1 C1 ( SIZE IN MM) 350 350 15350


→ SIZE IN METER 0.350 0.350 15.350

Number of column 4.000


15.276

→ TIES TYPE 1 (FULL)

1-SET 0.270

→ TIES TYPE 2
1-SET
0.270

TIES TYPE 3
1-SET
0.270

TIES TYPE 4
1-SET
0.070

LINK TYPE 1

1-SET

0.270

LINK TYPE 2
1-SET

0.270
BAR BENDING SCHEDULE - COLUMN

Dia of
No. of No. of Spacing Length
Shape of Bar Bar in
bar item in mtr in mtr
mm

0.100
12 8 4 15.826
0 8 4 15.726

0.450

0.270
0.075 8 104 4 0.075 1.230
0.075 0.270 8 46 4 0.150 0.960

0.270

0.120
0.075 0 104 4 0.075 0.930
0.075 0.270

0.120

-0.080
0.075 0 150 4 0.075 0.530
0.075 0.270

-0.080

0.270
0.075 0 150 4 0.075 0.830
0.075 0.070

0.270

0.075 8 150 4 0.075 0.420

0.075

0.075 8 150 4 0.075 0.420

0.075

GRAND TOTAL
MN

Weight in Kg
Total Total wt Total wt Total wt Total wt
length in 8mm 10mm 12mm 16mm
mtr (0.395 (0.617 (0.89 (1.58
kg/mt) kg/mt) kg/mt) kg/mt)

506.432 - - 450.724 -
503.232 - - - -

511.680 202.114 - - -
176.640 69.773 - - -

386.880 - - - -
318.000 - - - -

498.000 - - - -

252.000 99.540 - - -

252.000 99.540 - - -

TOTAL 470.966 0.000 450.724 0.000


GRAND TOTAL 921.691
n Kg

Total wt Total wt
20mm 25mm
(2.47 kg/mt) (3.85 kg/mt)

- -
- -

- -
- -

- -
- -

- -

- -

- -

0.000 0.000
TIE BEAM
Sr.
Particular
no. L B H

1 GB1 (SIZE IN METER) 3.700 0.230 0.400



Number of beams 2.000

Extra top bars

→ STIRRUPS

2 GB2 3.700 0.230 0.400



Number of beams 2.000
Extra top bars

→ STIRRUPS

3 CGB2 1.100 0.230 0.400



Number of beams 1.000

Extra top bars

→ STIRRUPS

4 TB1 3.700 0.230 0.400



Number of beams 6.000
Extra top bars

→ STIRRUPS

5 TB2 3.700 0.230 0.400



Number of beams 6.000

Extra top bars

→ STIRRUPS
6 CTB2 7.200 0.230 0.400

Number of beams 1.000

Extra top bars

→ STIRRUPS
BAR BENDING SCHEDULE - GB/PB

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 3.650 0.250 16 3 2

0.250 3.650 0.250 16 2 2

0.250 1.825
16 1 2

0.180
0.075 8 38 2
0.350 0.075 0.350

0.180

0.250 3.650 0.250 16 3 2

0.250 5.475 0.250 16 2 2


0.250 2.738
16 1 2

0.180
0.075 8 26 2
0.350 0.075 0.350

0.180

0.250 1.050 0.250 16 2 1

0.250 2.625 0.250 16 3 1

0.250 1.313
0 2 1

0.180
0.075 8 12 1
0.350 0.075 0.350

0.180

0.250 3.650 0.250 16 3 6


0.250 3.650 0.250 16 2 6

0.250 1.825
16 1 6

0.180
0.075 8 38 6
0.350 0.075 0.350

0.180

0.250 3.650 0.250 16 3 6

0.250 5.475 0.250 16 2 6

0.250 2.738
16 1 6

0.180
0.075 8 38 6
0.350 0.075 0.350

0.180
0.250 7.150 0.250 16 2 1

0.250 17.875 0.250 16 3 1

0.250 8.938
16 2 1

0.180
0.075 8 73 1
0.350 0.075 0.350

0.180
ING SCHEDULE - GB/PB

Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

4.150 24.900 - -

4.150 16.600 - -

2.075 4.150 - -

0.100 1.210 91.960 36.324 -

4.150 24.900 - -

5.975 23.900 - -
2.988 5.975 - -

0.150 1.210 62.920 24.853 -

1.550 3.100 - -

3.125 9.375 - -

1.563 3.125 - -

0.100 1.210 14.520 5.735 -

4.150 74.700 - -
4.150 49.800 - -

2.075 12.450 - -

0.100 1.210 275.880 108.973 -

4.150 74.700 - -

5.975 71.700 - -

2.988 17.925 - -

0.100 1.210 275.880 108.973 -


7.650 15.300 - -

18.375 55.125 - -

9.188 18.375 - -

0.100 1.210 88.330 34.890 -

TOTAL 319.749 0.000


GRAND TOTAL 111
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

- 39.342 - -

- 26.228 - -

- 6.557 - -

- - - -

- 39.342 - -

- 37.762 - -
- 9.441 - -

- - - -

- 4.898 - -

- 14.813 - -

- - - -

- - - -

- 118.026 - -
- 78.684 - -

- 19.671 - -

- - - -

- 118.026 - -

- 113.286 - -

- 28.322 - -

- - - -
- 24.174 - -

- 87.098 - -

- 29.033 - -

- - - -

0.000 794.701 0.000 0.000


1114.449
SLAB BEAM
Sr.
Particular
no. L B H

1 B1 (SIZE IN METER) 4.100 0.300 0.650



Number of beams 4.000

Extra top bars

→ STIRRUPS

2 B2 2.600 0.230 0.400



Number of beams 4.000
Extra top bars

→ STIRRUPS

3 BR1 3.000 0.230 0.400



Number of beams 1.000

Extra top bars

→ STIRRUPS
BAR BENDING SCHEDULE - SLAB BEAM

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 4.050 0.250 16 3 4


12 2 4

0.250 4.050 0.250 16 2 4

0.250 2.025
16 2 4

0.250
0.075 10 42 4
0.600 0.075 0.600

0.250

0.250 2.550 0.250 16 3 4


12 2 4

0.250 2.550 0.250 16 2 4


0.250 1.275
16 1 4

0.180
0.075 10 18 4
0.350 0.075 0.350

0.180

0.250 2.950 0.250 16 3 1


0 2 1

0.250 4.425 0.250 16 5 1

0.250 2.213
0 5 1

0.180
0.075 8 31 1
0.350 0.075 0.350

0.180
G SCHEDULE - SLAB BEAM

Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

4.550 54.600 - -
4.550 36.400 - -

4.550 36.400 - -

2.275 18.200 - -

0.100 1.850 310.800 - 191.764

3.050 36.600 - -
3.050 24.400 - -

3.050 24.400 - -
1.525 6.100 - -

0.150 1.210 87.120 - 53.753

3.450 10.350 - -
3.450 6.900 - -

4.925 24.625 - -

2.463 12.313 - -

0.100 1.210 37.510 14.816 -

TOTAL 14.816 245.517


GRAND TOTAL 648
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)

- 86.268 - -
32.396 - - -

- 57.512 - -

- 28.756 - -

- - - -

- 57.828 - -
21.716 - - -

- 38.552 - -
- 9.638 - -

- - - -

- 16.353 - -
- - - -

- 38.908 - -

- - - -

- - - -

54.112 333.815 0.000 0.000


648.260
REINFORCEMENT STEEL CONSUMPTION STATEMENT
REINFORCEMENT STEEL Total Qty
Sr. No. Item Description
8mm 10mm 12mm 16mm 20mm 25mm
1 FOOTING ----- 165.850 ----- ----- ----- ----- 165.850
2 COLUMN 470.966 ----- 450.724 ----- ----- ----- 921.691
3 GB/PB 319.749 ----- ----- 794.701 ----- ----- 1114.449
4 BEAM 14.816 245.517 54.112 333.815 ----- ----- 648.260
5 WALL&SLABS 717.567 619.515 ----- ----- ----- ----- 1337.081

Total in kg :- 1,523.098 1,030.881 504.836 1,128.515 ----- ----- 4,187.331


WASTAGE 15% 228.465 154.632 75.725 169.277 ----- ----- 628.100

Total in MT :- 1.752 1.186 0.581 1.298 ----- ----- 4.815


TANK WALL BBS

Dia of tank = 5340 mm


Ht of tank = 3050 mm
HOOP STEEL
hoop steel length = 16.7676 m
dia of bars = 8 mm
spacing of hoop = 170 mm
No of bars = 38 NOTE- CONSIDERED 2 LAYERS
Total length = 637.1688 m
Wt of steel = 251.4137 kG
vertical STEEL
Vert steel length = 4850 mm
dia of bars = 8 mm
spacing of bars = 170 mm
No of bars = 197
Total length = 955.45 m
Wt of steel = 377.0009 kG

TOTAL wt = 628.4147 kG

TOP DOME EXTRA


DIA 5340 MM
DIA OF BA 8 MM
SPACING O 170 MM
SPACING O 170 MM

TOP CIRCUMFERENCIAL BAR


LENGTH NO. TOTAL LENUNIT WT. TOTAL WT.
0.6 100 60 0.395 23.67 KG
16.77 4 67.07 0.395 26.465 KG
BOTTOM BAR

4.73 29 274.4126 0.395 108.28 KG NOTE- CONSIDERED BOTH WAYS


TOTAL WT. 50.14 KG

BOTTOM DOME EXTRA


DIA 5340 MM
DIA OF BA 10 MM 8 MM
SPACING O 150 MM
SPACING O 150 MM

TOP BAR
LENGTH NO. TOTAL LENUNIT WT. TOTAL WT.
0.75 113 170 0.617 104.81 KG
16.77 4 67.07 0.395 26.465 KG
EXTRA TOP OVER MAIN BEAM

1.50 37 111 0.617 68.43 KG NOTE- CONSIDERED BOTH WAYS


TOTAL WT. 199.71 KG

ITEM DESCREIFORCEMENT STEEL TOTAL QTY.


8MM 10MM 12MM
TOP DOME 50.139 223.135 0.000 273.274
TANK WAL 628.415 0.000 0.000 628.415
GALLARY S 12.548 0.000 0.000 12.548
BOTTOM 26.465 396.38 0.000 422.844

TOTAL IN 717.567 619.515 0.000 1337.081


ADD 7% W 50.230 43.366 0.000 93.596

TOTAL IN 0.768 0.663 0.000 1.431

SLABS
TOP SLAB 5170 5170 THK. 150 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 5.17 10 150 35 180.95 0.617 111.567
BOTTOM 5.17 10 150 35 180.95 0.617 111.567
BTM SLAB 5170 5170 THK. 200 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 5.17 10 150 35 180.95 0.617 111.567
BOTTOM 5.17 10 150 35 180.95 0.617 111.567
GALLARY S 1200 1800 THK. 120 MM
BARS LENGTH(mDIA(mm) SPACING( NO TOTAL LENUNIT WT. TOTAL WT.
TOP 1.2 8 150 13 15.6 0.395 6.156
BOTTOM 1.8 8 150 9 16.2 0.395 6.393
TOTAL WT. (TOP & BOTTOM) 12.548