General Plan - Rumah Tinggal Semarang 2 - 8X19 - 09012023
General Plan - Rumah Tinggal Semarang 2 - 8X19 - 09012023
Version 09.01.2023
G
I
UP
Garden
Mini Bar
H
H
Powder Room
Dining &
Rinse Area
F
Dry Kitchen Master Bedroom
E
Dining Room
FL ±0.000
FL ±0.000
G
Master Bathroom
FL -0.020
F
1 2 3 4 5 6 7 8 9 10 11
UP
FL -0.350
AKSES
AKSES
E
Guest Bathroom
FL -0.020
D
D
Living Room
FL ±0.000
Guest Bedroom
FL ±0.000
Terace FL -0.020
C
C
FL -0.200
B
B
Carport
A
A
1 2 3
1 2 3 4 5
01 LAYOUT PLAN 1ST FLOOR
SKALA 1 : 100
CLIENT : - DATE : 9 Januari 2023 1. Drawings are design intent only. 4. Qualified person must be employed where applicable
2. Production drawings to be completed by the main 5. All dimensions and final finishes to be subjected to
contractor and to be checked by the design consultant checking and approval.
PROJECT : RUMAH TINGGAL SCALE : 1 : 100 DESIGN : - prior to construction 6. Do not scale off drawing, dimensions to be verified on site. 0.1
3. Contractor to ensure all materials used and electrical work Any disrepancies to be reported to the designer
SHEET TITLE : DRAWN : - CHECK : - compiles with local authority regulations. immediately.
LAYOUT PLAN 1ST FLOOR
G
I
UP
Sky Light
Wet Kitchen DN
1 2 3 4 5 6 7 8 9 10 11
H
+3.980
F
BATHROOM 2
Living Room
Bathroom 1
E
FL +3.680
Bedroom 2 Bedroom 1
FL +3.700 FL +3.700 +3.700
G
GUEST BEDROOM
F
1 2 3 4 5 6 7 8 9 10 11
UP VOID
DN
22 21 20 19 18 17 16 15 14 13 12
E
Living Room
FL +3.700
D
+4.000
Bedroom 4 Bedroom 3
FL +3.700 FL +3.700
MASTER BATHROOM
Bathroom 2 +3.980
FL +3.680
C
C
MASTER BEDROOM
+3.700
B
B
FL +3.680
A
A
1 2 3
1 2 3 4 5
01 LAYOUT 2ND FLOOR
SKALA 1 : 100
CLIENT : - DATE : 9 Januari 2023 1. Drawings are design intent only. 4. Qualified person must be employed where applicable
2. Production drawings to be completed by the main 5. All dimensions and final finishes to be subjected to
contractor and to be checked by the design consultant checking and approval.
PROJECT : RUMAH TINGGAL SCALE : 1 : 100 DESIGN : - prior to construction 6. Do not scale off drawing, dimensions to be verified on site. 0.2
3. Contractor to ensure all materials used and electrical work Any disrepancies to be reported to the designer
SHEET TITLE : DRAWN : - CHECK : - compiles with local authority regulations. immediately.
LAYOUT PLAN 2ND FLOOR
G
I
Service Area
FL +7.380
Void
FL +7.400 DN
H
Maid Bathroom
FL +7.380
F
Maid Room Maid Room
FL +7.400 FL +7.400
Dry & Service
FL +7.350
E
Dog Cage
G
Maid Bathroom Laundry Room
FL +7.380
FL +7.400
F 1 2 3 4 5 6 7 8 9 10 11
Pets Area
FL +7.400 VOID
FL +7.400
Storage
FL +7.400
DN
22 21 20 19 18 17 16 15 14 13 12
E
Cat Cage
D
D
FL +7.380
Roof Garden
FL +7.350
Roof Garden
C
C
FL +7.350
Aviary Aviary
B
B
A
A
1 2 3
1 2 3 4 5
CLIENT : - DATE : 9 Januari 2023 1. Drawings are design intent only. 4. Qualified person must be employed where applicable
2. Production drawings to be completed by the main 5. All dimensions and final finishes to be subjected to
contractor and to be checked by the design consultant checking and approval.
PROJECT : RUMAH TINGGAL SCALE : 1 : 100 DESIGN : - prior to construction 6. Do not scale off drawing, dimensions to be verified on site. 0.3
3. Contractor to ensure all materials used and electrical work Any disrepancies to be reported to the designer
SHEET TITLE : DRAWN : - CHECK : - compiles with local authority regulations. immediately.
LAYOUT PLAN 3DR FLOOR
G
I
Void Void Water Torent
H
F
Dry & Service
E
Sky Light
G
F
Sky Light
E
D
D
50
50
500
500
50
50
600
600
Roof Garden Roof Garden
50
50
600
600
50
50
600
600
C
C
50
50
600
600
50
50
600
600
50
50
B
B
Dak Cor Dak Cor
FL +11.150 FL +11.150
A
A
1 2 3
1 2 3 4 5
01 ROOF TOP PLAN
SKALA 1 : 50
CLIENT : - DATE : 9 Januari 2023 1. Drawings are design intent only. 4. Qualified person must be employed where applicable
2. Production drawings to be completed by the main 5. All dimensions and final finishes to be subjected to
contractor and to be checked by the design consultant checking and approval.
PROJECT : RUMAH TINGGAL SCALE : 1 : 50 DESIGN : - prior to construction 6. Do not scale off drawing, dimensions to be verified on site. 0.3A
3. Contractor to ensure all materials used and electrical work Any disrepancies to be reported to the designer
SHEET TITLE : DRAWN : - CHECK : - compiles with local authority regulations. immediately.
ROOF TOP PLAN