Tender Excel To PDF
Tender Excel To PDF
2 Small Panel
2.1 Main Power Distribution Panel : Power distribution Panel (IP 41) for Lighting, Receptacle Outlet & etc Set 1 - - -
Metal sheet thick 4 mm. Cable entry from bottom. with incomer MCCB
200A (3ph, 4W), with indication lamps and metering, Din Rail, terminal
block, etc.
- Outgoing MCCB 100A x 3
- Outgoing MCCB 63A x 3
- Outgoing MCCB 50A x 3
2.4 Local Control Panel : Local Control Panel for Motor Set 5 -
Standard steel box with start switch, stop switch and emergency stop
switch. (with NO & NC contact)
2.5 Welding Box with one MCCB 63 A Set 1 -
5 Control Cables
5.1 NYHF 9C x 2.5mm2 Lm 710 -
5.2 NYHF 3C x 6mm2 Lm 400 -
5.3 NYHF 3C x 2.5mm2 Lm 400 -
5.4 NYHF 2C x 2.5mm2 Lm 150 -
6 Signal Cables
6.1 NYCHF 8T x 1.5mm2 : For RTD and Thermistor Lm 150 -
Underground Installation of power and control cables shown in the cable schedules, The pay item shall be per linear meter of cable
installed, tested and inspected measured nett point to point from the drawings.
7 Cable Armored, 0.6/1kV, N2XRHF
7.1 4C-16mm2 underground cable. Installation including excavation, back filling and marker with sand and bricks as per APP std. Lm 100 -
2,
7.2 4C-16mm installation above piperack Lm 500 -
1C-120 mm2 (BCC) earthing cable. Installation including excavation, back filling and marker with sand and bricks as per APP
7.3 Lm 700 -
std.
SUBTOTAL - III - -
IV Cable Termination
MV Cable termination: Special and certified skill workers are required to do this work. Contractor to provide terminal lugs
accordingly. Contractor to provide Hi-Pot and Megger and test all 20 kV and 6.3 kV cables and submit test reports (QA/QC)
C.1 MV CABLE TERMINATION
2
1 - Power Cable XLPE 1C - 400mm , 20kV, Standard type Set 18 -
2
2 - Power Cable XLPE 4C - 240mm , 6.6kV, Standard type. Contractor provide lugs Set 2 - -
2
3 - Power Cable XLPE 4C - 120mm , 6.6kV, Standard type. Contractor provide lugs Set 2 - -
2
4 - Power Cable XLPE 3C - 70mm , 6.6kV, Standard type. Contractor provide lugs Set 6 - -
2
5 - Power Cable XLPE 1C - 400mm , 20kV, Plug -In Type GIS Panel Set 0 -
(Vimal K. Malhotra / Bayani M. Monzon) (Yen Chun Wei) (Clement V Samuel / Rathinam K P) (Babu Thomas/Jen Tseng Chao) (Kosim Sutiono) (Hendri Gunawan)
Electrical Lead Engineering Div. Head Deputy / Project Manager Deputy / Project Leader Finance Mill Head
2 Small Panel
2.1 Main Power Distribution Panel : Power distribution Panel (IP 41) for Lighting, Receptacle Outlet & etc Set 1 - -
Metal sheet thick 4 mm. Cable entry from bottom. with incomer MCCB
200A (3ph, 4W), with indication lamps and metering, Din Rail, terminal
block, etc.
- Outgoing MCCB 100A x 3
- Outgoing MCCB 63A x 3
- Outgoing MCCB 50A x 3
2.4 Local Control Panel : Local Control Panel for Motor Set 5 - -
Standard steel box with start switch, stop switch and emergency stop
switch. (with NO & NC contact)
2.5 Welding Box with one MCCB 63 A Set 1 - -
3 Panel Base Frames & Supports
Contractor to fabricate support from C-channel 100 x50 x 6mmT
3.1 6.3 kV MCC : Base Frame for 6.3 kV MCC Set 1 - -
3.2 400 V MCC & VFD ( 1 line up ) : Base Frame for 0.4 kV MCC & VFD Panel Set 1 - -
3.3 Marshalling Panel : Base Frame for Marshalling Panel Set 1 - -
3.4 Main Power Distribution Panel : Support for Lighting Distribution Panel Wall Mount Type Set 1 - -
3.5 Lighting Panel : Support for Lighting Panel Wall Mount Type Set 1 - -
3.6 Bolt & Nut for Fixing all these Panels Lot 1 - - -
3.7 6.3KV Transformer 2500Kva : Base Frame for 6.3 kV MCC Set 1 - -
B Cable installation
Installation of power and control cables shown in the cable schedules, The pay item shall be per linear meter of cable installed,
tested and inspected measured nett point to point from the drawings.
1 N2XSEHF-12/20kV, Un-Armored Cable
2
1.1 1C-400 mm Lm 1560 - -
Page 1 of 6
th
PINDO DELI PROJECT BILL OF QUANTITY FOR SERVICE CONTRACT ELECTRICAL Date: Aug 7 , 2019, Rev.0
5 Control Cables
2
5.1 NYHF 9C x 2.5mm Lm 710 - -
2
5.2 NYHF 3C x 6mm Lm 400 - -
2
5.3 NYHF 3C x 2.5mm Lm 400 - -
2
5.4 NYHF 2C x 2.5mm Lm 150 - -
6 Signal Cables
2 :
6.1 NYCHF 8T x 1.5mm For RTD and Thermistor Lm 150 - -
Underground Installation of power and control cables shown in the cable schedules, The pay item shall be per linear meter of
cable installed, tested and inspected measured nett point to point from the drawings.
7 Cable Armored, 0.6/1kV, N2XRHF
2
7.1 4C-16mm underground cable. Installation including excavation, back filling and marker with sand and bricks. Lm 100 - -
2,
7.2 4C-16mm installation above piperack Lm 500 - -
7.3 1C-120 mm2 (BCC) earthing cable. Installation including excavation, back filling and marker with sand and bricks. Lm 700 - -
C Cable Termination
MV Cable termination: Special and certified skill workers are required to do this work. Contractor to provide terminal lugs
accordingly
C.1 MV CABLE TERMINATION
2
1 - Power Cable XLPE 1C - 400mm , 20kV, Standard type Set 18 - -
2
2 - Power Cable XLPE 4C - 240mm , 6.6kV, Standard type. Contractor provide lugs Set 2 - - -
2
3 - Power Cable XLPE 4C - 120mm , 6.6kV, Standard type. Contractor provide lugs Set 2 - - -
Page 2 of 6
th
PINDO DELI PROJECT BILL OF QUANTITY FOR SERVICE CONTRACT ELECTRICAL Date: Aug 7 , 2019, Rev.0
Installation of cable tray/ladder including assembling, fitting, fixing (clamp/ stopper), cutting, splice plate installation, cover and
other miscellaneous work (tee, elbow, riser, etc fabrication). The pay quantity shall be linear meter of tray / ladder installed
complete, measured point to point form the drawing. APP will supply angel bar, c-chanel, cable tray jointing c/w bolt & nut.
Page 3 of 6
th
PINDO DELI PROJECT BILL OF QUANTITY FOR SERVICE CONTRACT ELECTRICAL Date: Aug 7 , 2019, Rev.0
E Lighting System
Lighting & receptacle material & installation : Include building lighting, street lighting, Room lighting & electrification, switch &
power socket (Cable by owner, other material by contractor). 20% of those normal lighting shall be equipped with battery back
up for 2 hours (emergency lighting)
1 Lamp & Fixtures : Highbay Lamp (LED 85W) Pendant Mounted Set 6 - -
2 Lamp & Fixtures : Highbay Lamp (LED 85W) Stanchion Mounting, Outdoor IP 65 Set 8 - -
3 Lamp & Fixtures : Flood Lighting LED 250W, IP65 Set 7 - -
4 Lamp & Fixtures : Street Lamp LED 150W, IP65 Set 8 - -
5 Lamp & Fixtures : TL Lamp & Fixture (T8 LED tube 2x22W) Recessed Installation Set 12 - -
6 Lamp & Fixtures : TL Lamp & Fixture (Essential T8 LED tube 2x22W) Recessed Installation Set 4 - -
7 Lamp & Fixtures : TL Lamp & Fixture (T8 LED tube 2x22W) Pendant Installation Set 4 - -
8 Switch & Socket : One gang Switch, 230V, 16A, inbow Panasonic (for room indoor) Set 3 - -
9 Switch & Socket : Socket outlet, 230V, 16A, Flush Installation (for room indoor) Set 8 - -
10 Lighting Junction Box : Roundbox knock out Set 20 - -
11 Conduit : Flexible conduit (DN 3/4") m 30 - -
12 Conduit : Conduit, Hot Dip Galvanized steel (DN 3/4") m 300 - -
13 Lighting Pole : Street Lighting Pole 9M single arm (5"x3m, 4"x3m, 2.5"x3m) pcs 0 - -
14 Lighting Pole : Flood Lighting Pole 10M double arm (5"x3m, 4"x3m, 2.5"x3m) pcs 4 - -
15 With accessories: Lot 1 - -
- Connector
- Coupling
- Screw connector
- Hanger rod
- Wire nut, red colour for cable 2 sqmm and 4 sqmm
- etc
Page 4 of 6
th
PINDO DELI PROJECT BILL OF QUANTITY FOR SERVICE CONTRACT ELECTRICAL Date: Aug 7 , 2019, Rev.0
Page 5 of 6
th
PINDO DELI PROJECT BILL OF QUANTITY FOR SERVICE CONTRACT ELECTRICAL Date: Aug 7 , 2019, Rev.0
Page 6 of 6
EXTERNAL SERVICE PURCHASE REQUISITION (ESPR) BILL OF QUANTITY
PROYEK TITLE : PD2 - CONVERTING TISSUE MACHINE # 6 & 7 PHASE - 2
PROYEK NO. : PD2 -KT2M-3522-2101
LOKASI : PD2 -PT. PINDO DELI 2
NOTIF/WBS CAPEX : PD2 -KT2M-3522-2101
TANGGAL : 26 Oct 2022
Bayani M. Monzon (Yen Chun Wei) ( Prasetiyo ) (Babu Thomas /Jen Tseng Chao) (Kosim Sutiono) (Hendri Gunawan)
Electrical Lead Engineering Div. Head Converting Head Deputy / Project Leader Finance Mill Head