Check List Handover Rev.0

This document is a checklist for a construction project. It lists 10 items to check regarding the civil construction works and equipment foundations. The checklist includes fields to mark each item as accepted, rejected, or not applicable. Signatures are required from the subcontractor, quality control personnel, and the joint venture to verify completion of the checks. Any approved deviations or attached reports are noted in the remarks section.

Uploaded by

Ali Mari Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Check List Handover Rev.0

This document is a checklist for a construction project. It lists 10 items to check regarding the civil construction works and equipment foundations. The checklist includes fields to mark each item as accepted, rejected, or not applicable. Signatures are required from the subcontractor, quality control personnel, and the joint venture to verify completion of the checks. Any approved deviations or attached reports are noted in the remarks section.

Uploaded by

Ali Mari Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTRACTOR CONTRACT

NAME: NO:

PROJECT REPORT
PROJECT NO:
NAME: NO:

TYPE OF
LOCATION DATE:
STRUCTURE:
REF.
DRAWING O.

ITEM NO. DESCRIPTION OF WORKS ACCEPTED REJECTED N/A REMARKS

1 Is Civil Construction works completed?

Is Equipment foundation as per Approved


2
drawing?
Are Anchor bolts size, type, location, and
3
projection as per approved drawing?

4 Level has been checked and confirmed?

5 Surface Preparation acceptable

Painting, Coating, Epoxy flooring completed,


6
inspected and accepted by concerned parties
Control points and benchmark have been
7
verified?

Any template is used?


8
If yes – orientation has been approved?

9 Survey data is approved and attached to this


check list?

10 Is there any deviation approved by TQ?


If yes include TQ number in remarks
Remarks:

SUBCONTRACTOR CONS CIVIL SUBCONTRACTOR MECH CTJV CIVIL CONS

Full Name:

Signature:

Date:

SUBCONTRACTOR QC CIVIL SUBCONT QC MECH CTJV MECH QC

Full Name:

Signature:

Date:

NB: All reports shall be attached to this check list