Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
87 views
Price Indices August 2021
CIDA
Uploaded by
samitha505
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Price Indices August 2021 For Later
Download
Save
Save Price Indices August 2021 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
87 views
Price Indices August 2021
CIDA
Uploaded by
samitha505
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Price Indices August 2021 For Later
Carousel Previous
Carousel Next
Download
Save
Save Price Indices August 2021 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 32
Search
Fullscreen
Q a) State Ministry of Rural Housing and Construction & Building Materials Industries Promotion BULLETIN OF CONSTRUCTION STATISTICS VOLUME 31-AUGUST 2021 Construction Industry Development Authority CIDA Publication No. — CIDA/ID/0SConstruction Industry Development Authority Bulletin of Construction Statistics CIDA Publication No: CIDA/ID/05-Volume 31 August 2021 \ ISSN No 2792-1077 ALL RIGHTS RESERVED. This Bulletin for the Sri Lankan construction materials has been prepared by the Construction Industry Development Authority. Whilst all care and efforts have been made to ensure the proper production of this document and its contents, neither does the drafting committee nor the CIDA accept any liability for problems, difficulties or controversy arising from the usage of these bulletin.CIDA BULLETIN OF CONSTRUCTION STATISTICS CONTENTS, Guidelines for Use CIDA Bulletin Preamble Notes to Tables. TABLE 1: Price Indices for Construction Materials.. TABLE 2: Price Indices for Labour Wages... TABLE 3: Price Indices for Dry Hire Rate for Plant and Equipment and Fuel......... 22 TABLE 4: Cost Indices for Various Types of Construction and All Construction... 23 TABLE 5: Monthly Cost Indices for Various Types of Construction work. 224 Variations in Price Indices.Guidelines for Use CIDA Bulletin of Construction Statistics Construction Industry Development Authority (CIDA) has introduced the Price adjustment method called as CIDA formula method for adjustments to contract price due to fluctuations in prices in Materials, Labour and Plants. To use this method, CIDA publishes this specific document CIDA of Construction Statistics including monthly based indices focusing on Price Fluctuations Bul in the construction industry. Following are the documents which direct to use and guide this publication. A. CIDA Formula Method - [2nd Edition — June 2008] B. CIDA Standard Bidding Documents nuary 2007 B 1 CIDASBDI01 — Procurement or W. =[2ne Earn 2 January 2007 B 3 CIDA/SBDI03 — Min Clouse 13 im Instructions to B ‘ 10.10 ti ce 10.10 in Seneaus B 4 CIDAISBDI04 = Design & Buia Contracts [Tat Eaiion (Revises) May 2003] » 13.4 in Instructions to Biaa 13.4 in Bracing Dat 13.7 in Conaniens or Cantract 4OM 10 Convrooe Unt C Government Procurement Guideline & Manual Published by National Procurement Agency C1 Procurement Guigetine 2006 — Goods &Works Crouse 5.4.28 5.4.3 C2 Procurement Manuat 2006 = Goous &WorksA. CIDA Formula Method The Formula Method for Contract Exceeding Rs. 10 Million F = 0.966 X(V-Vna)/100) © Px (I xe— 1 xb)/I xb) F = Value of Price Fluctuation V_ = Value of Work done for the period P, = Input Percentage Vina = Value of non Adjustable Elements I = Base Index I xe = Current Index The Formula Method for Contract Not Exceeding Rs. 10 Million F= 0.869 (V—Vna) X (le = Its) / Teh) Ire -Current composite index for the type of work published by CIDA uy - Base composite index for the type of work published by CIDASTATISTICS FOR THE NATIONAL CONSTRUCTION INDUSTRY OF SRI LANKA 1 PREAMBLE, ‘The vision of CIDA is “To create a reliable and competent Construction Industry for Sri Lanka on par with global standards”. As such providing information and statistics for the stakeholders of the industry is a necessity forthe sustenance of the industry and has National importance. CIDA introduced a bulletin of Price and Cost Indices in the year 1990, capitalized it as the base year. Indices can be defined as indicators of inflation in construction inputs such as materials, labour and fuel. Currently, Price Indices of 61 items are published including 55 Materials (M indices), 03 Labour (L. indices), and 03 Dry Hire Rates for Plant & Equipment (P indices). Various Types of construction works are computed quarterly including “All Housing” (average of Modem Housing and Semi-Permanent Housing), “Non-Residential Building”, “All Civil Works (average of Irigation Major and Minor, Road Works, Water Supply and Drainage and other Civil Works) and “All Construction” (average of main 03 types). Cost Indices including Modern housing, Non-Residential Building and Water supply and Drainage are also published using the monthly variables. Updated monthly the details collected from designated places and suppliers, an online data collection system has also been Currently, the indices published in the Bulletin are applied in the Price Fluctuation formula in the monthly Bill for making claims in an inappropriate manner as given in the section “Adjustments for Changes in Costs” in the Standard Bidding Document published by CIDA. The Government has approved the adoption of the formula method for the reimbursement of price escalation, following CIDA publication No.ID/O7, which is mandatory for the state sector construction projects, with effect from Ist January 1993. Base Index and the Current Index are the two vital parameters used in the Price Fluctuation formula, as monthly variables. 12 SIGNIFICANT PRICE CHANGES OF THE CURRENT MONTH AUGUST 2021 Construction impacts everyone across the globe. Sri Lanka has high costs of construction as there are no price controls being imposed for most construction materials. Although the manufacturing companies have not increased the price of the materials, some of the dealers and shops who bought from those companies are selling at their own prices. Therefore, itis very hard to control the calculation of the actual inflation, In most recent years, the prices of construction materials are varying within shorter periods randomly owing to the impact of international raw material prices, the United States dollar exchange rate, the government restrictions and the pandemie situation, ‘The selling rate of the United States dollar was standing steadily up to the end of the month of August from the ‘month of July. However, most construction materials which are in the basket of the bulletin showed an inerease in the price in relation to the above -mentioned facts ‘The indices for M30A Bitumen 80/100(Bulk Form) and M30C Bitumen 60/70 (Bulk Form) increased based (on the price of private dealers as there are no stocks at Ceylon Petroleum Corporation.NOTES TO TABLES Source of information used for deriving of price indices given in Table | ~ 4 are explained in pages from 02 to 06. Table 1 1 3. 5. te 10. 1. 2. M1 Cement ~ Local (Ex-factory) Based on the ex factory price of @ S0kg bag (Puttalam) M2 Cement - Imported Based on the average price of a SOkg bag sold by public and private importers M3 Cement - Local (Market Price) Based on the average price of a S0kg bag sold by public and private dealers M4 Cement — Weighted Average Based on the weighted average price of a SOkg bag calculated as per consumption ratio of above categories (MI, M2 &M3). MS Cement Blocks Based on the average price of a 400 x 200 x 100 mm (solid) size block sold by public and private dealers. M6 Rubble Based on the average price of a cube (100 cubic feet) of 6” ~ 9” size rubble delivered to site by private dealers. M7 Metal Based on the average price of a cube (100 cubic feet) of 20 mm size aggregate delivered to site by private dealers. M8 Sand Based on the average price of a cube (100 cubic feet) of river sand delivered to site by private dealers. M9 Bricks — Hand Cut Based on the average price of 1000 Nos of s delivered to site by private dealers. M10 Bricks — Machine Cut Based on the average price of 1000 Nos of bricks delivered to site by private dealers. MII Calicut Tiles Based on the average price of 1000 Nos of Calicut tiles (Grade 1) delivered to site by private producers, M12 Lime Based on the average price of a metric ton of slaked lime sold by private dealers.1B. 14, 15, 16. 18, 19, 20. 21. 2. 23. 24, 25. 26. 27. M13 Reinforcement Steet Based on the average price of a hundreds weight of 12mm diameter Tor Steel bar sold by private dealers. M14 Structural Steel Based on the average price of a linear foot of 50 x 50 x 5 mm Angle Iron sold by private dealers. MIS GI Sheets Based on the average price expressed in square foot rate of a Gauge 26 corrugated sheet 30” x 84” sold by private dealers. M16 Asbestos Roofing Sheets Based on the average price of a 10° long corrugated sheet sold by public and private dealers. ‘MIT Asbestos Ceiling Sheets Based on the average price of a 4” x 4” plain sheet sold by public and private dealers, MI8 Sanitary Ware (Local) Based on the average total price of a white wash basin and water closet including accessories sold by private dealers. MI9 Sanitary Ware (Imported) Based on the average price of an imported wash basin including accessories sold by private dealers. M20 PVC Pipes Based on the average price of a linear meter of 20 mm diameter PVC water pipe sold by private dealers. M21 Formwork Timber Based on the average price of a linear foot of Class 3, 1” thick, 6” wide timber plank sold by private dealers, ‘M22 General Timber Based on the average price of a linear foot of Class 1 timber (100x75 mm size) sold by private dealers. ‘M23 Timber Products Based on the average price of a standard ordinary plywood door (11/4” thick, 2°9" x 6°9") sold by private dealers. M24 Glass Based on the average price of a square foot of 3mm plain glass sold by private dealers. M25 Door and Window Fittings Based on the average price of a pair of 100x75 mm brass butt hinges sold by publie and private dealers. M26 Electrical Wires Based on the average price of a 100 meter wire coil (1/044) sold by private dealers, ‘M27 Wall Paint Based on the average price of a liter emulsion paint sold by private dealers.28, 29. 30. 30A. 30B. 30. ai. 32. 36. 37. M28 Wood Paint Based on the average price of a liter enamel paint sold by private dealers. M29 Cadjan Based on the price of 100 pairs obtained from the Distri Colombo, Price Fixing Committee, M30 Bitumen 80/100 (Drum Form) Based on the price of a liter of Bitumen 80/100 (Drum form) sold by Ceylon Petroleum Corporation. M30A Bitumen 80/100 (Bulk Form) Based on the weighted average prices of a liter of Bitumen 80/100 (Bulk form) sold by Ceylon Petroleum Corporation & price of a liter of decanted Bitumen 80/100 sold by private dealers M30B Bitumen 60/70 (Drum Form) Based on the price of a liter of Bitumen 60/70 for (Drum Form) sold by Ceylon Petroleum Corporation. 'M30C Bitumen 60/70 (Bulk Form) Based on the weighted average prices of a liter of Bitumen 60/70 (Bulk Form) sold by. Ceylon Petroleum Corporation & price of a liter of decanted Bitumen 60/70 sold by private dealer. M31 Terrazzo Based on the average price of a square foot of in-situ terrazzo (dark colours) laid by contractors. M32 Floor Tiles Based on the price of a 300 mm x 300 mm homogeneous white floor tile supplied by local manufacturer. M33 Wall Tiles Based on the price of a 300 mm x 300 mm white wall tiles manufactured by local manufacturer. M34 Granite Tiles Based on the average price of a 300 mm x 300 mm tile sold by private dealers, M35 Colour Pigment Based on the average price of a Kilogram of Red Cement (imported) sold by private dealers. M36 Aluminium Doors, Windows & Partitions Based on the average price of a square foot of Aluminum door installed by contractors. M37 Aluminum Suspended Ceiling Based on the average price of a square foot of Aluminum framed acoustic paneling ceiling installed by contractors. M38 Electrical Fittings Based on the weighted average price of Ceiling Fan, Plug Base, Trip Switch sold by private dealers.39, M39 Ready Mixed Concrete Based on the average price of a cubic meter of Grade 20 ready mixed conerete sold by private dealers. 40. M40 High Tensile Steel Wire Based on the average price of a metric ton of imported 5 mm diameter high tensile steel wires. 41. M41 Pre-stressed Bridge Beams Based on average price of a 40°0” long bridge beam manufactured by SEC and SD & CC. 42, M42 Concrete Lamp Post (Pre-stressed) Based on average price of a 30° 0” long lamp post manufactured by SEC and SD & CC. 43. M43 Precast Concrete Components for Bridges, Roads and Building Based on weighted average price of Fence Posts, Paving Slabs, Kerbs Uprights, Handrails ‘manufactured by SEC and SD & CC. 44, M44 Hume Pipes Based on average price of a 3° 0” diameter 8° 0” Jong hume pipe manufactured by SEC. and SD & CC. 45, M45 Earth Based on average price of a cube (100 cubic feet) of Type II earth delivered to site by private supplier within 10 km distance. 46. M46 Zink Aluminum Sheets Based on average price of a square foot of 047mm coloured roofing sheets manufactured by private producer, 47, M47 Ductile Iron Pipe Based on average price of a meter of 80mm — 300mm diameter pipe imported from different countries, 48, M48 Aggregate Base Course (ABC) Based on average price of a cube (100cu.m) of ABC delivered to site by private dealers within 10km. 49, M49 Chain Link Based on average price of a linear foot of 4°0” high, Gauge 10 PVC coated chain link (green) sold by private dealers 50, M50 Stainless Steel Based on the average price of a linear foot of a 3 ft high standard hand rail. 51. MSI Cement Roof Tiles Based on average price of a standard type roof tile supplied by private dealers.52. M52. Quarry Dust Based on the average price of a cube (100cubic feet) of quarry dust supplied to the site by private dealers. 53. M53 Gabion Box Based on average price of a box made with 2.7mm diameter Zine coated and PVC coated wires (hexagonal type) supplied by private dealers. 54. M54 Geo-Textile Based on average price of a square meter of 280 g/m2 (2.5mm gauge) polypropylene Geo-textile sold by private dealers. 55. MSS Road Marking Paint Based on the average price of a kilogram of white and yellow colour reflectorized . thermoplastic Road Marking powder sold by private dealers. Table 2 1. LI Skilled Labour Based on average daily wage rate paid to masons, carpenters, plumbers, bar benders, electrician and plant operator by public and private contractors. 2. L2 Semi-Skilled Labour Based on average daily wage rate paid to mechanic helper by public and private contractors. 3. LB Unskilled Labour Based on average daily wage rate paid to unskilled labourers by public and private contractors. Table 3 1. PL Small Equipment Based on average of percentage increased in daily dry hire rates of Concrete mixer, Bob cat ,Air Compressor, Tractor with Trailer , Tractor with Bowser, Poker Vibrator, Generator, Water Pump, Boom Truck, Small Truck, Double Drum Roller & Rammer. 2. P2 Heavy Equipment Based on average of percentage increased in daily dry hire rates of Front end loader, Motor grader, Backhoe loader, Vibratory roller, Tipper, Water bowser, Crawler excavator, Crawler tractor, Mobile crane, Crawler crane, Asphalt paver, Pneumatic tyred roller, Bitumen distributer & Chip spreader 3. PB Fuel Based on dealer’s price of a liter of auto diesel. (Information from Ceylon petroleum, Corporation) Table 4 Cost indices of various types of construction work computed quarterly. Table S Monthly cost indices of various type of construction work.‘TABLE 1: PRICE INDICES FOR CONSTRUCTION MATERIALS MI_CEMENT- Local (Ex-factory Price ) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 1990 | 034 034, 054 034 O34 O34 034 1037 1087 1037 1178 1176) 1000 4991, 1992, 1993, 2010, 2041,2042,2013,2014,2016,2016 2017 | 6209 6209| 6209 6209/ 6209 6209 6209 6209 6209 6209 6209 6209 6209 2018 | 6209 620.9, 6409 6409 640.9 6409 6409 6409 6409 640.9 6876 6576 640.3 2019 | 6576 700.0, 731.0 7310 731.0 731.0, 731.0 731.0 731.0 731.0 7310 6966 7194 72020 | 6966 6966 6066 6966 6066 6056 6066 6956 6966 6956 c068 G96 6966 2021 | 6966 696.6 6965 6966 6966 6956 6966 6956 Mz_CEMENT- Imported YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | seP | ocr | NOV] DFC | avG 1990 | 915 91.3 882 000 989 1002 1007 1033 1188 1134 1043 1036 100.0 4991, 1992. 1993, 2010, 2011,2042,2013,2014, 2015,2016 207 | 4798 4708) 4708 4708) 4798 4798 4708 4798 4708 4798 4798 4708 479.8 2018 | 4708 479.8, 495.3 4963 496.3 4953 4953 4953 4953 4953 5082 5082 4049 2019 | 5082 541.0, 565.0 5650 565.0 565.0 5650 5650 565.0 5650 5650 5480 5568 72020 | 548.0 548.0 548.0 8480 548.0 5480 5480 6480 5480 5480 5480 5480 548.0 2021 | 5480 545.0, 548.0 5480 5480 548.0 548.0 5480 M3 CEMENT Local (Market Prices) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG 1990 | 032 932, 868 052 932 877 987 1042 1208 1181 1069 1053 1000 1991, 1992. 1993, srsvrsnsone ;2040 ,2011,2012,2013,2014,2018,2018 poi | 4021 4921] 4921 4021 / 492.1 4021, 402.1 4021 4921 4021 4921 4021) 4921 2018 | 4921 4921 5080 5080 6080 5080 5080 S080 5080 S080 S212 S212, S078 2019 | 5212 5548 5794 S704 5794 5794 S704 S794 5704 S794 S794 5680 571.5 2020 | 5680 568.0 5680 5680 568.0 5680 5680 S680 5680 S680 5680 5680 5680 2021 | 568.0 568.0 568.0 568.0 568.0 568.0 568.0 5680 M4 CEMENT (Weighted Average Prices) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG 1990 | 921 021, 604 O14, O82 081, 087 1036 1160 1117, 1077 1089, 100.0 4991, 1982. 1983, 2010 ,2011,2012,2013,2014 2015,2016 poi | 5122 5122] 5122 8122) 5122 5122, 8122 $122, S122 5122 $122 6122) 5122 2018 | 5122 5122 5287 5287 5287 5287 5287 5287 5287 S287 5425 5425 5283 2019 | 5425| 575) 6031 6031, 6031 6031 | 6091 6021 6031 6031 6031 S818) S041 2020 | 5818 581.8 5818 5818 S818 5818 5818 S818 S818 5818 S818 5818 5818 o2t | 5818 5818) S818 S818, S818 5818) S818 S818Table 1 Continues... ‘Base Year- 1990 (AVG) MS CEMENT BLOCKS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 1990 | 960/092 92) 960, 960 960 O79, O79 O77 1000 1124, 1119) 1000 4991, 1992, 1993, 2010 ,2011,2012,2013,2014 ,2015 ,2016 2017 | 6323, 6323) 6323 6923 6323 6323 6434 6434 6434 C434 —B434 434 6378 2018 | 6613 6613 6749 G79 6749 6749 6749 6834 6834 6834 6834 6834 6762 2019 | 6834 6834 683.4 6834 683.4 6834 683.4 6834 6834 6834 6834 6834 683.4 2020 | 6834 6834 6834 6834 6834 6834 6834 6834 7169 7169 7169 7169 6946 2021 | 7169| 7169 7808) 7808 7808 7808 7808 8192 M6 RUBBLE YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 1990 | 045 054 067 985 990 992 092, 1009 1017 1086 1045, 1087, 1000 1991, 1992. 1993, 2040 2011,2012,2013,2044 ,2016,2016 2017 | 6873) 6873) 6873 6873) 6937 6937 6937 6937 7047 7047 7047 704T | 6952 2018 | 7208, 7208 7208 7208 7330 7330 751.7 7517 7517 7817 751.7 7517) 7383 2019 | 7517| 7517 7517, 7517 7706 7708 7706 | 7708| 7708 7708 7706 | 7708) 7643 2020 | 7708 7706 7706 7706 7467 7467 7467 7467 | 7467 7467 7467 7487 7546 2021 | 7467) 8433 8433 8433 843.3 843.3 8686 8859 M7 METAL YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 1990 | O77 900 O77) 1019 088 O44 085 1008 1017 1011 1030 1063, 1000 1991, 1992. 1993 10,2011,2012,2013,2014 ,2015,2016 2oi7 | 3782, 3782 3782 3782 3820 3820 3860 388.0 3880 3880 3827 2018 | 3047 | 3047 3047 3047 3007 3007 4040 4040 4040 4040 4040 4040, 4002 2019 | 4060 404.0 4040 4040 4103, 4103 4103 4103, 4103, 4103 4103, 4103) 4082 zo20 | 4103) 4103 4103) 4103, 360.2 3802 3802 3802) 3802 3802 3802 3802) 3002 poz | 3602, 4052 4052, 4052 4052 4052 421.5 4209 M8 SAND YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG 1990 | 965 965 9468 965 931 951 1003 1003 1047 1025 1rd 1138, 1000 1991, 1902. 1993 2010 2011,2012,2013,2015 2016 2017 | 31004 | 31955) 31602 31602 32525 32758 33005 | 33409 34137 34974 S4B7.1 95024 | 32956 2018 | 35024 | 35024 3516.2 35162 3547.6 35526 35921 35921 35021 36126 36128 36128 35627 2019 | 36128 36128 36126 36125 36126 36128 36128 36128 36128 36128 36128 36128 36128 2020 | 36128 | 36128 34540 34540 34540 3454.0 34540 34540 3511.1 3511.1 3511.1 | 3631.1 35005 2021 | 3631.1 | 3631.1 3631.1 | 3631.1 | 3631.1 | 3897.9 3837.9 39208Bato Yoor 190 AVG) M9 BRICKS (Hand Cut) Year | JAN | FES | MAR | APR su. [aus | sep [ocr [ nov | bec | ave 1990 | 907 922 1035 1024 1991, 1992. 1993 2017 | 16987 | 16987 16987 16987 2018 | 1718 | 1771.8 1718 17850 2019 | 17850 17850 17850 17850 2020 | 1857.4 | 18106 18106 18106 2021 | 18106 18106 1987.1 1987.1 7013) 1011, 1014) 1029) 1005, 1018 1000, 10 ,2011,2012,2013,2014,2015,2016 17158 | 1730.0 | 1730.0 17512 | 1718 1771.8 17247 1785.0 17850 1785.0 17850 | 1785.0 17850 1781.7 17850 17850 1785.0 18408 16408 1857.4 1800.3 78106 | 18106 | 18106 | 18106 | 18108 | 18106 16145 2048.6 | 2048.6, MIO BRICKS (Machine Cut) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV] DEC | AVG 1990 | 962 942 1006, 1006 1006 1006 1006 1006 1011 1016, 1026 1026 1000 1991, 1992. 1993, 2010 ,2011,2012,2013,2014,2015,2016 207 | 4624 4824 4824 4024) 4046 4946 4046 4046 4986 4046 4979 407.9 491.1 2018 | 4979 5309 5309 5309 5399 $909 539.9 5309 5399 5309 5399 5309 596.4 2019 | 5309 5309 5399 5309 5399 5309 539.9 5309 5399 5309 5399 6290 5473 2020 | 6290 6290 6290 620.0 629.0 620.0 629.0 629.0 6290 6290 6290 6200 6200 2o2t_| 6290 6200 6402 6402 640.2, 640.2 640.2 8504 MII CALICUTTILES: YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 990 | 692, 892 1030) 1030, 1038, 990) 1035] 1028, 81 1017, 1083/1022, 1000 1991, 1992. 1993, 2010 ,2011,2012,2013,2014,2015,2016 zo | 8132, 8132 8132, 81a2 | 8528 e528 8528 8528 8528 8528 8753 8753 8434 2018 | 8753 930.0 9300 9300 30.0 930.0 930.0 930.0 | 930.0 930.0 9900 930.0 925.4 2019 | 9300 930.0 9300, 9300 930.0 930.0 930.0 930.0 9300 930.0, 900 920.0 930.0 2020 | 930.0, 930.0 9300 9300 9765 9755 9765 9765 9765 9765 9765 9765 961.0 zo2t_| 9765, 9765 9765 9765 9765, 9765 9765 976.5 2 LIME YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 057, 057 057) 054, 051) 051) 054) O51, 1199 096) 1008) 1701, 1000 1994, 1992 1993... rcncns- 2010 ,2011,2042,2013,2014 ,2015,2016 BT] 5129) 5129) 5129 S1a2/ s1a2| S182 ‘sia2 5182 ssi9 5319) S319 S319) S214 2018 | 5437 5437 5437 543.7 550.1 $50.1 550.1 5501 550.1 5501 5501 550.1 548.0 2o1e | 5501 5501 5501 5501 5501. S771 S771 S771, S771. S771| S771 S771, 5659 2020] 5771, 5909 5909) 5909 5909) 5909 5909 5009 5909 5009) 5909 5009| 5808 2021 | 5909, 5909 5009 5909 5009, 5009 5009 5009ase Year - 1990 AVG) MI3 REINFORCEMENT STEEL. YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 994 904 G94 004 904 O94 O84 O94 O78 1034) 1019 1028, 1000 1991, 1992. 1993 ,........ ,2010 2011,2012,2013,2044 ,2015,2016 2oi7_| 5604 | 5604) 5740) 5740) S74.0| 874.0 574.0| 6430 643.0 643.0 649.0 643.0 6004 2018 | 6430) 6430 6430 6430 643.0 6430 6430 6430 6522 7106) 7106 7148| 6074 aie | 7148/7148 7148) 7148) 7148) 7148) 7148) 7148| 7148) 7148| 7148) 7148) 7148 2020 | 7148) 7148 7148 7148 7148 7831 7831 7831 7831 7831, 7831 787.4 755.0 oat | e270) 8a74 axa) 37.4) 9282) 9760 10193 10800 MI STRUCTURALS' YEAR |_JAN MAR [APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV | DEC | AVG 1990 | 860° HG 946 1004 OBS, 985 O85 GBS 1102) 1169, 1174 1000 4994, 1992 1993... rrenrne 2010 2041,2012,2093,2014 2015 2016 Boi | 5154) 5154) S154) SiS4) S1s4 | 6172) S172) S172 8172) 5172) SI72| SI72 S164 2018 | 5200, 5200 5200, 5200 5200 5200 520.0 5200 5200 5200, 5200 520.0 5200 2019 | 5659 5620 5620 5620 5620 9620 5620 5620 5620 56201 5620 5620 5615 2020 | 5620 5620 562.0 5620 5620 5845 5845 S845 5845 5845 545 5845 575.1 2021 | 6176, 6176 6176 6176 GI76| 6485 7596 8736 MIS GISHEETS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 855/943 965, 998 998 O98 998 985 999 1015, 1048 1072, 1000 4991, 1992, 1998 os. 2010 ,2011,2012,2013,2014,2015,2016 Boi | 5126 5126 5126) 5126) S126 5126 5352 5352 5352 5352 5952 5952 6259 2018 | 5650 565.0 5650 5660 565.0 566.0 566.0 565.0 566.0 5660 5650 565.0 566.0 2019 | 566.0 580.0 5800 5800 580.0 580.0 580.0 580.0 580.0 580.0, 5800 5800 5789 2020 | 5800 580.0 5800 5800 580.0 580.0 580.0 $80.0 580.0 5800 5800 6883 580.1 zoat_| 7187, 7903 8304) 9105, 9105) 10051 | 1005.1 11190 M16 ASBESTOS ROOFING SHEETS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 955 956 056) 956 056 056 057 057 1080 1084) 1091 1087 100.0 1991, 1992. 1993, 2010 ,2011,2012,2013,2014,2015,2016 2017 | 4699| 4609 4699) 4009) 4699 4609 409.9 4699 4699 4099| 4609 469.0 4609 2018 | 4609 4609 4699 4609 4609 4609 460.9 4609 4699 4820 4026 4026 4747 2019 | 4926) 4954 4954) 4054 4954) 4954 4954 4954) 5129 5129| 5129 5129, 5010 zo20 | 5129, 5129 5129 S129 S129 $129 S129 5129 5129 5129| S129 5129 5129 2o21 | 5129, 5129 5129 5310 5655) 5655 5655 6221 10Table 1 Continues... Base Year -1990(AV0) MI7_ASBESTOS CEILING SHEETS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 955 955 055, 955, 955 055 055 O55 1072 1090) 1087 1114, 1000 1981, 1992. 1993... 2040 ,2011,2042,2013,2044,2015,2016 poi | 4528 | 4528) 4528) 4528) 4528) 4528 4528 4528 4528 4528| 4528 4528| 4528 zoe | 4528 4528 4528 4528 4528 4528 4528 4528 4528 4566 4508 459.8 4543 2019 | 4598 4508 4598 4508 4508 4598 4598 4598 4606 4606 4606 4606 460.1 2020 | 4606 4606 4606 4606 4606 4606 460.6 4606 4606 4606 4606 4606 4606 2o2t_| 4608 | 4606 4606 4606 4606 4828 4825 5534 MIS SANITARY WARE (Loc YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | O74 O74 O74) 985 O74 O85 952 B75 1019 082 1096 1214, 1000 1991, 1992 , 1993 .erronrnonn 2010 ,2011,2092,2013,2014 ,2018 2016 2017 | 3695, 3603 3693 3603 | 3728 3728 3728 3728 3728 3728 3728 3728 3356 2018 | 3728) 3728 3728, 3728 3728 3728) 3728) 3728, 3728 3728) 3728 3728, 3356 2019 | 3728 3728 3728 3728 3728) 8728 9015 | 3015 3915 3015) 9015 | 9915 3822 2020 | 3015) 3015 3018) 3015 3015) 3018) 4097 4097 4097 4097 | 4007 4097 4006 2021 | 4097 4007 4007 4007 4087, 4097 | 408.7 409.7 M19 SANITARY WARE (Imported) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 953 1036, 982, 1029, 1000 1991, 1992. 1993... 2010 ,2011,2042,2013,2014,2015,2016 2017 | 5691 5601 5691, 5601 5691 5691 500.6 | 5006 5908 5006 5806 5006 5798 2018 | 5008) 6145 6145) 6145) 6145) 6145 | 6145 6145) 6145) 6145| GI45 | 6145) 6125 219 | 6145 6145 GI145 6145 6145 G145 6255 | 6255 6255 6255 6255 6255 620.0 2020 | 6255 6255 6255 | 6255 6255 | 6380 6980 6280 6380 6280, 6980 6980 6328 2021 | 6380 6380 6699 669.9 669.9, 6699 669.9 6699 20 PVC PIPES: YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 956 004 076) 907 985, O18 1009 1008 1051 1020, 1007 1081, 100.0 1981, 1992. 1995 ,. 2010 ,2011,2012,2013,2014,2016 Doi | 81S) BS 811s) a5) B15) BS ‘BIS B15 B15 BS) BIS BIS 8115 2018 | 8368 8368 8368 8368 8507 8507 859.7 8507 8507 8507 8507 8597 8521 2019 | 8597) 9157 8937 8937 | 8937, BUST 8937 | 9332 9332 9332) 9932| B590| 9030 2020 | 8590 8590 8590 6500 858.0 8590 858.0 8590 8590 8590 8590 10174 8722 2021 | 10174 10174 11885 11885 | 11885 | 14316 14546 14086 "Bato Yoar- 1990 AVG) M21 FORMWORK TIMBER YEAR | JAN | FEB | MAR | APR | MAY | JUN | vuL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 635 636 636) 836 836 O36 836 1212 1212 1236) 1244 1244, 1000 1991, 19921993 nnn. ,2010 ,2011,2042,2013,2014 ,2015,2016 2017_| 9965 9963 9963, 9063 9965 995.3 1025.3 10253 10253 10253 10253 10463 10125 2018 | 1046.3 | 1046.3 10463 1046.3 1046.3 1046.3 1048.3 10842 10842 10842 1084.2 10842 1062.1 2019 | 10842 1084.2 10842 10842 1084.2 1084.2 10842 10842 1084.2 10842 | 10842 10842 10842 2020 | 10842 | 10842 1084.2 10842 1084.2 1145.1 | 1145.1 11451 | 1145.1 1145.1 | 11451 | 11451 | 11197 Boat | 1145.1 | 1145.1 1145.1 1145.1 1145.1) 1145.1 | 1145.1 1225.0 ‘Note : Unit conversion printing error for indices of Form work timber in February 2019 1734.0 shal read as 1084.2 M22 GENERAL TIMBER YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 773/773 73) 773, 73) 1134 144) 1144 1145) 1175) 1172) 1222, 1000 1994, 1992. 1993 ..-nn,2010 2011,2042,2013,2044 ,2018,2016 2017 | 1047.4 | 1047.4 1063.0 1063.0 | 1063.0 1095.2 1096.2 | 1095.2 1095.2 10952 | 11041 11041 1080.7 2018 | 11081 | 11041 11041 11041 | 11041 11041 | 1104.1 | 11086 | 11088 11086 | 11086 | 11086 | 1106.0 2019 | 1108.8 | 1397.1 1937.1 1397.1 1997.1 1962.0 13520 | 13520 1952.0 1362.0 | 1352.0 13620 13268 2020 | 1352.0 | 1352.0 13620 13520 13520 | 14196 14196 14196 14196 14196 14196 1419.6 | 13914 Boat | 14196 | 14196 14196 14196 | 14196 | 1607.1 | 1607.1 1607.41 23 TIMBER PRODUCTS, YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 1990 | 950, 950 050, 950 950, 1036, 1036 1036 1038 1036, 1036 1036, 1000 1991, 1992. 1993, 2011,2012,2013,2014 ,2016,2016 207 | 5462) 5462) 5462) S462) S462 5624 5624 | 5624. 5624 5624 5624 5809 5580 2018 | 5899, 5809 5899 5809 5899 5699 509.9 5809 5899 5809 5899 5899 5809 2019 | 5699| 601.0 6010 601.0 601.0) 60.0 601.0) 601.0, 6010) 601.0| 601.0 601.0 6001 2020] 6010 6010 6010 601.0 601.0 601.0 601.0 6010 6010 6010 601.0 601.0 6010 2021 | 601.0 601.0 601.0 601.0 601.0, 601.0 601.0 643.1 M24 GLASS. YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 955 983 992 902 O74 956 065 O72 107 1022) 1040 1044 100.0 1991, 1992. 1993, 12041,2012,2013,2014 ,2015,2016 2017 | 3665 | 3665) 3665) 3665 | 3655 3665 369.1] 3691 3691) 3601 | 9601 3601 3678 2018 | 3691/3601 9798) 3708 2798 3798, 798 3798 3798 3798) 3798 | 3798 3760 2019 | 3798, 3976 3076) 4119 4110) asia 4314) 4914 4914 4914) 4314) 4914) 4182 zo20 | 4314) 4314 4314) 4314) 4314) asia] 4314/4578) 4878) 4578| 4578 4578, 44z4 zoat | 4878 4578 7877 57.7 757.7 7877 _157.7_187.7 2Table 1 Continues.. ‘Base Yosr- 1990 (AVG) M25 DOOR & WINDOW FITTINGS. YEAR | JAN | FEB | MAR | APR MAY | JUN | JUL | AUG] SEP | OCT | NOV] DEC | AVG 1990 | 640 90.3, 1038 1039 1089 1038 1039, 1039 1030 998 998 088 1000 4991, 1992. 1993, »2040 ,2011,2012,2013,2014 2016 2016 2017 | 10328 | 1032.8 | 10328 10328 | 10328 10328 10328 | 10328 1051.7 1051.7 1051.7 1051.7 1030.1 2018 | 1051.7 | 1051.7 | 1051.7 1051.7 1051.7 1051.7 1051.7 | 1051.7 | 1051.7 1051.7 | 1051.7 | 1051.7 1051.7 2019 | 1051.7 1051.7 | 1061.7 1051.7 1051.7 1051.7 1051.7 | 1051.7 1051.7 1051.7 | 1051.7 | 1051.7 1051.7 2020 | 1051.7 | 1051.7 | 1061.7 1051.7 1051.7 1051.7 1051.7 | 1051.7 | 1051.7 1051.7 | 1051.7 | 1051.7 1051.7 zo2t | 10517 1051.7 10517, 10517 10517 11856 11856 1185.6 M26 ELECTRICAL WIRES YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 068 06.1) 07.1, 078 990, 090 1009) 1010 1085 1014, 1026 1018 1000 41991 , 1992. 1993 enn. 2040 ,2011,2012,2013,2014,2018,2016 2017 | 4538 4538] 4538 4538) 4538 4538 453.5 | 4538 4538 4538 4538 4538 4538 2018 | 4538 4786 | 4786 4786 4786 4786 4786) S15 S115 5115 S115 S115 4902 2019 | 5115 531.3, 5313 5313 S313 5913 5319 S813 5313 5313, 5313 531.3 5207 2020 | 5313) 591.3) S313) 6313 S313 5913 6313/5813, S313 5313| 5313/5858 5359 2021 | 5049 658.9 695.3, 6953 8134 10102 10102 10102 M27 WALL PAINT YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1990 | 654, 854, 854 O15 845 984 1043, 1044 1110 1110 1142, 1148 100.0 4991, 1992. 1993, 2010 ;2011,2012,2013,2014,2016,2016 poi | 7219, 7219] 7219 7219 7219 7219 7219) 7219 7219 7219 7703 7793 7314 2018 | 7793, 7793) 7793 7703 7793 7793 7793 7793 7193 7793, 7793 7793 7793 2019 | 7793, 9012) 9012 9012 901.2 9070 907.0| 907.0 9070 9284 9284 9284 8907 72020 | 9284 028.4 10218 1024.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1006.3 2021 | 1021.8 | 1021.8 10218 10218 10218 11445 1167.4 1167.4 M28 WOOD PAINT YEAR| JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1900 | 654 654, 654) 015 965 984 1043/1044 1110 1110 1142) 1148 1000 4991, 1992. 1993, 2010 ,2011,2012,2013,2014,2015,2016 por | 78) 78) ris! 718) 718) 7i18) 7i18| 7118 7i18) 718) 7446) 7448 7172 2013 | 7446, 7446) 7445 7446 7446 7446 7446 7448) 7446 7446| 7446 | 7446 7446 2ora | 7446) 763.1, 7631 7831 7631 7914 7014 7o14 7914 8023, 6023 8023. 7674 2020 | 8023, 8023, 8023 8023 6023 8023 8023 | 8023 8023 8023 8023 8023 8023 2021 | 8023/0023, 8023 8023 8023 8825 000.1, 900.1 3Table 1 Continues... ‘Base Yost -1990(AV) M29 CADJAN YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 1990 | 635 653, 653 B17 B17 626 888 880 1233 1946 1333 1319 1000 4991, 1992. 1993, 2010 ,2011,2012,2013,2014,2015,2016, 2017 | 1086.1 | 1086.1 | 1086.1 1066.1 | 1056.1 1066.1 | 1066.1 1068.1 | 1086.1 1086.1 1066.1 1068.1 1066.1 2018 | 1086.1 1066.1 1086.1 1066.1 1056.1 1086.1 1066.1 1068.1 1086.1 1086.1 1066.1 1068.1 1066.1 2019 | 1086.1 1066.1 1086.1 1066.1 1056.1 1086.1 1066.1 10681 1086.1 1086.1 1066.1 1068.1 1066.1 72020_| 1086.1 | 1066.1 | 1086.1 1066.1 1056.1 1086.1 1066.1 1068.1 1086.1 1086.1 1066.1 1068.1 1066.1 2021 | 1066.1 | 1066.1 | 1066.1 1066.1 | 1066.1 1086.1 1066.1 1172.7 M30 BITUMEN 80/100 (Drum Form) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG tooo | 020 02.0 020 020, 920, 020 020 1056 10568 1056 1107 1197, 1000 4991, 1992. 1993, 2010,2091,2012,2013,2014,2016,2016 2017 | 5086) 5086] 5056 S086) S06 S086 S086 S086 S086 5086 S086 S086 | 5086 2018 | 5086 508.6 5986 5086 5086 5086 S0B6 S986 7752 9070, 9361 9961) 6953 2019 | 9261 956.6 9566 9561 936.1 9361 96.1 0981 9361 0361 9361 9381 930.5 2020 | 936.1 036.1 936.1 036.1 036.1 036.1 936.1 6361 936.1 036.1 0361 9361 9961 2021 | 9361 936.1 9361 9361) 036.1 036.1 9361 0361 Base Month January 200% M30A_BITUMEN 80/100 (Bulk Form) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG 2001 | 1000 100.0, 1000 1000 1000 1000, 1000 1000 1000 1000, 1000 1000, 100.0 12002 , 2003, ...... ,2010,2011,2012,2013,2014 ,2015,2016 Boi7_| 3862 3062) 3862 3062 3862 3862 306.2 3062 3862 3062 3862 3062 3862 2018 | 3652 366,2/ 386.2 3862 986.2 3852 3862 3862 3011 4085. 414741473932 019 | 4147 410.1 4101 4076) 407.6 3052) 3052 3052 3052 3074, 3074 3074) 401.0 2020-| 3974 397.4, 3748 362.4 962.4 3624 328.0 3280 3280 3280 3280 3570 3545 021 | 3007 4735 4735 4735 4735 4735 47355185 Base Month January 2001 M30B BITUMEN 60/70 (Drum Form) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2001 | 1000 100.0, 100.0 1000 1000 1000, 1000 1000 100.0 1000, 1000 1000, 100.0 2002, 2003, ...- ,2010,2041,2012,2019,2014,2016,2016 Boi | 2252 2052) 2252 2262 2252 2252 2252 2623 2523 2623 2523 2623 2365 2018 | 2523/2523) 2623 2523 2523 2523/2073 2973 3208 3754 3874 3874 2983 2019 | 3674 395.9 3059 3874 387.4 3874 3874 9674 3874 3674 3874 3874 3688 "2020-| 3874) 387.4) 3874 267.4) 987.4 3874) 267.4 3674) 3874. 3674) 367.4) 3874) 387.4 ort | se74 367.4, 3874 367.4 387.4 3874 387.4 3874 ‘Base Month January 2001 M30C_BITUMEN 60/70 (Bulk Form) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2001 | 1000 100.0, 1000 1000 1000 1000) 1000 1000 1000 1000, 1000 1000, 1000 2002 , 2008, ...... ,2010,2014,2012,2013,2014,2015,2016 2017 | 3535 9535 9535 3535 950.5 3535 3535 3535 3535 3635 9535 9535 353.5 2018 | 3788 3788 3788 3788 S788 3788 3788 3788 3828 300.3 4053 4053 385.3 2019 | 4053 429.3 4203 3087 9987 3773 3773. 3773 3773 3793 3703. 3703, 3924 2020 | 3793 | 3793) 3677 3460 346.0 3460 3131 3131 3131 3131 3131 3408) 3384 po2t | 3615 452.0 452.0 452.0 452.0 4520 452.0 4049 Note: Indices of MOA, M308, & MOC were introduced from October 2008 and back dated to January 2001 Weighted average price has been used for 30A &M30C from September 2007 4Table 1 Continues... ‘ase Month - Api 1995, M31_TERRAZZO YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 103 | ———=SO 1000/8) 18d 1133113373) 1206 1206) 1208, 1134 1994, 1995 1996... 2040 ,2011,2012,2013,2014 2018, 2016 2017 | 8777 8915) 8915 8915 8915 8915 8915 8915 9508 9508 9508 9508 910.1 2018 | 9508 9508 9878 9678 967.6 9678 967.8 9878 97S 9678 987.8 9878 9816 2019 | 9878, 901.9 9919) 0919 01.9) 9919 0919 9919 e919 om1.9 0919) 9919) 9916 2020 | 9919 9919 9919 9919 9919 9919 9919 9919 9919 9919 o919 9919 919 2o2t_| e019) 9019 9919) 0919) 001.0) e919 091.9 10415 M32 FLOOR TILES YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 103 | ~~ | 1000, 1000, 1000 1098 1098 1098 1008 1098 1098) 1065 1984, 1995,1996 ... ,2010 ,2011,2012,2013,2014,2015,2016 2017 | 2511, 2611) 2511) 2511 251.1 251.1 251.1 2511 2511 2611 251.1 2611, 2514 201s | 2511, 2511 2511 2511 2551 2551 255.1 2551 2551 2551 2551 2551 2538 2019 | 2551 | 2551 2551 2551 2551 255.1 259.5 | 2595 2595 2505 2595 2595 2573, 2020 | 2595 2505 2595 2505 2505 2505 250.5 2505 2595 2505 2505 2505 2505, zo2t| 2595 2505 2595 2505 259.5 2505 259.5 259.5 M33 WALL TILES: YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 1993 | 100.0, 100.0, 1000 100.0, 1000 100.0 1000 100.0, 1009, 1000 1994, 1995 1996 2010 ,2011,2012,2013,2014 2015,2016 2017 | 9448 | 9448) 44a 448) 448 9448 S448 9448 G448 S448 O48 O44 OHS 2018 | 9468 0448 9446 9448 G14 9614 9614 9614 G14 9614 9614 9614 9559 2019 | 961.4 | 12462 124682 12462 12482 12462 1273.1 12731 | 12731 12731 12731 12731 | 12359 2020] 1273.1 12731 1273.1 1273.4 1273.1 12731 1273.4 12731 | 1273.1 12731 12731 12731 | 1273.4 Boat | 1273.1 | 12731, 12734) 12734 | 1273.4 12731 1273.1 | 12734 M34 GRANITE TILES YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | ocT | NOV | DEC | AVG 1993 | 70001008, 1013 1018 1024 1003, 1003 1003, 1008 1008 1994, 1995. 1996 , 2010 ,2011,2042,2013,2014,2015,2016 Zor | 6299 6799) 6239 6209 / G29 6209 ‘6799 6299 6299 ‘6812 6612 66126377 2018 | 6612 6612 6512, 6612, 695.4 6954 695.4 6954 6954 6954 6954 | 6954 6840 2019 | 6954) 695.4 6954 6954 6954 6954 6954 695.4 6954 6054 6954 6954 695.4 2020 | 695.4 695.4 6954 6954 6054 605.4 6954 6954 6054 605.4 6954 6954 695.4 2021 | 695.4, 695.4 6954) 6954 6054 765.0 765.0 7650 6M3S COLOUR PIGMENT YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1993 | —- = (1000 1000, S77 1099/1106 1053 1053 1068 1083, 1049 1994, 1995. 1996, . 2010 ,2011,2012,2013,2014,2016,2016 zoir| 3304/ 3304 3304) 3304 | 3304/ s304| 3304| 3904 3304) 3304) 3904 3904) 3304 2018 | 3304, 678 3478 M478 3478 GATS 3478 ATS GATS 3478 3478 3878 34583 zoe | 3478) 3478 3478 M78 3478 BATS M478) BATS MTS 3478 MATH 8478, BATS 2020 | 3478 678 3478 M478 3478 GATS 9478 SATB BATS BATS 3478 3478 SATB zont | 3478, 3478 3478 M78 M78) 3712, 3712, 3712 M36_ALUMINIUM DOORS WINDOWS & PARTITIONS, YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1993 | — = == 1000, 1000) 1000) 1000) 1000) 100.0, 1000) 1001) 1001 1000 1994, 1995. 1996 2010 ,2011,2012,2013,2014,2015,2016 2017 | 6761 | 696.9 6969) 6960| 6960) 6969 6959) 6959 696.9) 6969 6969 6969 6051 zoe | 7219, 7219 7219, 7219 7219 7219 7219 7492 7492 7492 7402 7492 7333 2oie | 7492| 7402 7492) 7402 7492) 7492 780.1| 7801, 780.1, 7801| 7801, 7601, 7647 2020 | 760.1, 780.1 7801 780.1 780.1 8581 858.1 8581 855.1 8581 8581 8581 8256 2021 | 8581 8581 8581 858.1 8581, 0440 9723 0723, ‘M37_ALUMINIUM SUSPENDED CEILING YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV | DEC | AVG 193 | == 100.0, 1000, 1000 100.0, 1009 1000) 1000 100.0, 100.0 1000 1994, 1995. 1996 y .srrnnnnn 2010,2011,2012,2013,2014 ,2015,2016 zor | 5074) 5309 5309) 5309 5309 5309 530.9| 5309) 5309 5309 5309 530.9 5200 2018 | 5552 5582 5562 5562 S582 6582 5582 5792| 5792 5792| S792 5792 5669 201s | 5792, 5792 5792, S792 S792, 5792 6529 8529 6529 6529 6529 6529 616.1 2o20 | 6529/ 6529 6529 6529 6529 7182 7182) 7182| 7182 7182| 7182 7162\ 691.0 zoat_| 7182, 7182 7182, 7182, 7182, 7900 8137 8137 M38 ELECTRICAL FITTINGS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 193 | — = 100.0, 1000, 1005 1034, 1045 1033, 1033, 1034, 1034 1023 4994 , 1995 . 1996 ycrenennvsnr ,2040,2091,2042,2013,2014,2016,2016 poi | 2312| 2512) 2427| 2627 2427) 2427| 2427| 2a27| 2427| 2427| 2427 2427) 2408 2018 | 2427| 2447 2447 | 2447 | 2447 2447 | 264.7 2447) 2467 2467 | 2447 2447) 2445 2019 | 2487 2447 2511) 251.1 2511) 2511 251.1 251.1) 2511) 2511) 2511 251.1 2501 2020 | 2511 | 2511 2511) 251.1 2637 2637 | 2637 2637) 2637 2637 | 2637 | 2637) 2505 2021 | 2637 | 2637 2637 2637 2637 2803 280.3 2007 16Baso Month - Apri 1993 M39 READY MIXED CONCRETE YEAR | JAN | FEB | MAR | APR | MAY | JUN | vUL | AUG | SEP | ocT | NOV] DEC | AVG 193 | — == | 1000, 1005) 1026 1026) 1084 1084) 1110) 1084) 1084 1056 1994, 1995. 1996, 1010,2011,2042,2013,2014,2016,2016 2oi7| 4373| 4373) 4400) 4400 4400 440.0 440.0| 440.0 4400) 440.0) 4400 | 4400) 4306 201s | 4408) 4406 4406 4406 4406 4408 443.3 4466 446.6 4468 | 4456 4456 443.3 2019 | 4466 4613 4615 4649 4640 4649 464.9 4649 484.9 4649 464.9 4649 4627 2020 | 4649| 4649 4649 4649 4649 4549 464.9 4649 404.9 4649 464.9 4649 464.9 Zo2t| 4649) 4649 4649, 4649 4752 4752 4752 4924 M40 HIGH TENSILE STEEL WIRE YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1993 == 100.0 100.0, 1000 100.0, 1000 1000 1051, 1051, 1051 1017 1994, 1995. 1996 »2010,2011,2042,2013,2014,2018,2016 zor | 8324 6324 6324 6924 6324 6924 6924 6324 6324 6324 6924 6824 6924 zoe | 6324) 6324 6324 6324 6324 6324 6324 | 6324 G518 G518 6518 6518 6388 2o1e | 6518 855.1 855.1 655.1 655.1 855.1 855.1 855.1 855.1 855.1 855.1 8445 837.3 2020 | 8445 8445 8445 8445 8445 8608 803.5 9080 9115 9115 8115 S115 8783 port | 9115) 9115 9115) 9770, 877.0) 9770 977.0 10747 STRESSED BRIDGE BEAMS Jan | FEB | MAR | APR MAY | JUN | JUL | AUG | SEP | OcT | NOV DEC | AVG == | = == | 1000) 1000) 100.0 1053 1053, 1053 1053/1053 1053, 1036 1984, 1995. 1996 , 2010,2011,2012,2013,2014,2015,2016 2oi7_| 9671 | 9671) 9671) 967.1) 967.1 9671 967.1) 9671 967.1 9671) 9671 967.1 967.1 2018 | 967.1 9671 967.1 967.1 967.1 9671 967.1 9671 985.1 9831 9831 9631 9724 2019 | 985.1 | 1226.6 12266 12266 12266 12266 12256 12266 12266 12266 12266 12025 | 12043 2020 | 12025 | 1202.5 12025 12025 12025 12335 12626 12709 12728 12728 12728 12728 | 12302 oat | 12728 1272.8 12728 13238 13238 | 1923.8 1323.8 1300.0 M42 CONCRETE LAMP POST (Pre‘Stressed) YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 1983 [| = = = 1000, 1000, 1000) 1000) 1017 1017 1017, 1017, 1017, 1009 1984, 1995. 1996 ,. 2010,2011,2012,2013,2014,2015,2016 B07] 7335) 7335 7335 7335| 7395) 7338 7335 | 7335 7335 7335 7335 7335 7335 2018 | 7335) 7335 7335) 7335 7335 7338 733.5 | 7335 005.0 805.0 8050 6050| 7573 2019 | 8050 9552 9532 9532 9532 9532 953.2 9532 953.2 9532 9532 9345 9303 2020 | 9345 | 924.5 9345 9345 0345 0541 9724 9801 9819 9819 081.9 981.9 9589 2021 | 9819 981.9 9819 9848 9848 9848 084.8 1015.1 "Note a0; MGT & waz of uly 2020 pabicatons are increctSo plese use Be correctable ere 7Table 1 Continues... Base Month - Apri 1083, M43 PRECAST CONCRETE COMPONENTS FOR BRIDGES,ROADS & BUILDING YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 1993 100.0, 100.0 1000 1087 1087 1087 1087 1087, 1087 1058 4994, 1995, 1996 1010 ,2011,2012,2013,2014,2016,2016 2017 | 4084 406.4] 498.4 4084 / 490.4 4084) 4084 4084 4084 4084 4984 4984 4984 2018 | 4054 498.4 495.4 4084 498.4 4084 4084 4084 S118 S118 5118 5118 5029 2019 | 5118) 5047) 5047 5047) S047 5047| 5047 S047 5047 SOAT| 5047 S014) 5050 2020 | 5014 501.4 S014 S014 S014 5224 542.1 S443 5449 5449 5449 5449 5246 2021 | 5449 5449) 5449 5597 S597 5587 S597 S735 Mad HUME PIPES YEAR | JAN | FEB 1993 JUN | JuL | AUG | SEP | oct | NOV | DEC | AVG 70001043 1043 1043 1043, 1043, 1043, 1029 2040,2011,2042,2013,2014, 5004 590.4 5904. 5004 5004 5904 5004 5904 5004 5004 500.4 5968 5068 5068 5968 5025 5965 596.8 5068 5986 5068 5968 5850 5958 6080 6205 642.3 6454 6454 6454 6454 6155 7754 715.4 1976 2017 | 5004 | 500.4 2018 | 5004 500.4 201s | 5968 596.8 2020 | 585.0 585.0 2o2t | 645.4 645.4 ‘Rave Month - January 1996 MaS EARTH. YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV DEC | AVG 1996 | 1000 100.0, 1000 1000, 100.0 1000, 1000 1000 1000 1000 1067 1087 104.1 1997 , 1998 1999, .... ,2010,2011,2012,2013,2014 ,2015,2016 Boi | 10427 10427 | 10427 1042.7) 1109.3 11093 | 11003 11987 11387 11600 11600 11600 11047 2018 | 11600 1173.3 11733 11733 1200.0 1200.0 | 1235.2 12352 12352 1259.2 12592 12869 12159 2019 | 1286.9 1286.9 1286.9 12869 1286.9 12869 1286.9 12060 12869 12069 12869 12869 12069 2020 | 12659 1266.9 1286.9 1286.9 1286.9 12869 1286.9 12669 13933 1393.3 13333 19333 13024 2021 | 1393.3 1395.3 1303.3 1993.3 1903.3 1393.3 | 193.3 14000 ‘Base Month - January 2001 M46 ZINK ALUMINIUM SHEETS YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC | AVG 2001 | 1000 100.0/ 1000 1000) 1000 1000, 1000 1000 1000 1026, 1026 1026, 100.7 _--2010,2011,2012,2013,2014,2018,2016 2017 | 1742 160.0, 1800 1800 1800 1800 1873 1873 1873 1873 1873 1873 1832 2018 | 1902/ 1902) 1902 1902 1902 1902| 1902 1948 1948 1948 1948 1948/1921 2019 | 1048 181.1 181.1 1865 1865 1865 1865 1865 1865 1865 1865 1865 1863 2020 | 1865 | 196.5 1865 1865 1900 1900) 1900 1900 1900 1900, 1900 1900, 1989 zo2t | 2028 2129, 2129 2129, 2129 238.0 23802976 8MA7_DUCTILE IRON PIPE ‘Base Month May 2008 YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2008 [=~ 1000 10TH, «OKT. «O11 ~079, 1101 1103, 1047 2010,2011,2012,2013,2014,2015,2016 2017] 2358 2358 2358 2358 2358) 2358 2414 2814 2414 2814 2414 2414 2386 2018 | 2414) 2414) 2414 2414 2414 2414) 2414) 2414 2414 2717 2717 2717 249.0 pore | 2717) 2717) ar7, arn? ar) 2747 | ar7| MT 217-277, -amk7 2893 273.1, 2020 | 3091 3091 3091 3091 3091 3167, 3167 3167 3167 3167 3167 3167 3135 2021 | 3167, 3167 3167 3167 3194 3194 3104 3104 Base Month January 2000 M48_AGGREGATE BASE COURSE (ABC) YEAR| JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2000 | 775| 776, 780 762 784, 783\ 785, 785, 786 783, 788 789, 802 2004 2002. 200,201 1,2012,2013,2014,2015 2016, Beir | 1902) 1902) 1902) 1902 1934| 1934) 1034) 1034 1957 1957) 1957 1957) 193.4 2018 | 1990, 190.0 1990 1990 2009 2009| 2009 2009 2008 2008 2008 2009 200.3 2019 | 2009, 2009) 2314 2314 2314 2914) 2314) 2914 2314 2914) 2314 2314) 2263 2020 | 2314) 2314 2314 2314 2199 2199, 2199 2199 2199 2199 2199 2199 2237 zoat | 2ig9| 2412] 2412] 2412] 242] 2412] 2484] 2534 Month Apa 2007 Mao CHAIN YEAR | JAN | FEB way | JUN | JUL | AUG | SEP | oct | NOV | DEC | AVG 2007 | 100.0, 1000) 100.0, 1000 1095 1087 1106, 1113) 1046 ‘2008, 2008, 2010,2011 ,2012,2013,2014,2015,2016 207 | 2300/2300 2390 2390 2409, 240.9| 2409, 2409 2409 2409 2409 240.1 2018 | 2409 2409 242.5 242.5 2425 | 242.5 2425 | 2425 2425 2425 2425 2422 201s | 2425 260.2 260.2 260.2 2602 269.2 2682 2602 2692 2692 2602 267.0 2020 | 2692, 2692 2692 269.2 2692 269.2 2682 2602 2682 2692 2692 269.2 zo2t_| 2939| 2999] 2999 200.0] 3256| 3256] 308.1 'Bas0 Month - Soptombor 2007 MS0 STAINLESS STEEL. YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 207 |= 100-0 1000 «1000 =~ 10001000 ‘2008 2009 ,2010,2011,2012,2013,2014,2016,2016 zo | 1729 1729 1729) 1729 1729 1729| 1729) 1729 1729 1729 1729 1785 1734 2018 | 1785 1785 1785 1765 1785 1785| 1785 1785 1785 1785 | 1785 1785 1785 2019 | 1785) 1785 1785 1786 1785 1785, 1785 | 1870 1870 1870 1870 1870 1820 2020 | 1870, 1870 1870 187.0 187.0 1892, 180.2 1802 1802 1802 1892 1802 1883 2021 | 1e02| 1802] 1892] 1892] t892| 2176] 2t7e| 2176 Base Month June 2007 MSI CEMENT ROOF TILE: YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2007 | = == == 1000) 1000 1000 1000, 1000 1000 1068 101.0 ‘2008 , 2009 ,2010,2014,2042,2013,2014,2016,2016 poi | 1487) 1487) 1487) 1487 1407) 1487| 1487) 1487 1487 1487 1487 1487) 1487 2018 | 1487) 1487) 1487) 1487 1407) 1487) 148.7) 1487 | 1487 1487) 1487 1487) 1487 2019 | 1487 1606 1606 1606 1606 1606 1606 1606 1606 1606 1608 1606 1596 2020 | 1606) 1606 1606 1606 1606 1606, 1606 1606 1606 1606 1608 1606 1606 2021 | 1606 1606 1606 1606 1606 1606 1606 1621 9Table 1 Continues. Base Month: January 2008 Ms2___ QUARRY DUST. YEAR | JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 2009 | 1000 1012, 1012 1012 1020 1024, 1041 1057 1057 1081 1088 1089, 1036 2010, 2011,2012,2015,2014,2016,2016 D7 | 1635 1633 1633) 1633) 1661 1651| 1661) 1681 1686 1686 1686 1686| 1660 aoe | 1714) 1714) 1714) A71a) 172.7 1727) ATA) ATTA) 477A 177A) A774) ATTA) 1745 oro | 1774 ATTA ATTA ATTA, ATTA ATTA) ATTA ATTA 477A ATTA AA AVAL ATZA 020 | 1774) 77a 1774 ATTA) ATA ATTA) ATA ATTA ATTA ATTA) AA ATTA ATA 2021 | 1771 1935) 1935 1035) 1935 1984 1084 2023 Base Month - May 2011, MS3_GABION Box YEAR| JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG 2011 700.0, 1009 100.0, 1000, 1000 1000 1000, 100.0) 1000 2010, 2011,2012,2013,2014,2015,2016 2017 | 1037 | 1037 1037 1037) 1087 1037 | 1037 1037 1037 1037 | 1037 1037, 1037 2018 | 1037 1075 1135 1135 1195 1135 1135 1135 1135 1135 1135 1135) 1122 219 | 1135 1135 1135 1135 1135 1135 1135 1135 1135 1135 1135 1135) 1135 2020 | 1135 1135 1135 1135 1261 1281 1261 1261 1281 1281 1261 1264, 121.9 port | 1313 1313 1313 1313, 1313 1374 13741374 Note * Indices of MSS-Gabion Box are ntoduced in October 2011 and back dated to May 2011 ‘ase Month - January 2042 Mst__GEO TEXTILE. YEAR | JAN | FEB ‘APR | MAY | JUN | JUL | AUG | SEP | OcT | NOV] DEC | AVG on | = 2011, 2012,2013,2014 ,2015,2016 2017 | 1000 1000 | 1000 1000 1000 1000 | 1000 1000 100.0 1000 1000 1000 | 100.0 2018 | 100.0 100.0 | 100.0 100.0 100.0 100.0 1000 100.0 100.0 100.0 | 100.0 100.0 | 100.0 aoe | 0s 1175 1175 175 75 7S 7S ITS 7S 17S | 7S 1175 116.9 poo | 7s 1175 175 175 75 «7S 7S 17S 175 1175 | 127.0 1270 119.0 2021 | 127.0 1270 | 127.0 1270 | 127.0 —*127.0~| +1270 «127.0 Note : Indices of M4.Geo Texte are invoduced in October 2011 and back dated to May 2011 ‘Base Month - January 2014 MSS_ROAD MARKING PAINT YEAR| JAN | FEB | MAR | APR_[ MAY [JUN | JUL | AUG [ SEP | OGT | NOW | DEC [ AVG 203 [| 2044 2015,2016 2017 | 1000 100.0 | 1000 | 1000 | 1000 1000 | 1000 1000 100.0 1000 1000 1000 | 100.0 2018 | 1000 1000 1000 1000 1000 1000 1218 1215 1215 1215 1218 1215 | 1108 aie | 1215 1225 | 1225 1225 | 1225 1225 1225 1225 1225 1225+ «122.5 (1225 | 1224 2020 | 1215 1215 | 1215 1218 1215 1218 121 21S 1S 1S 1S 21S 121.5 Boat | 1215 121.5 | 121.5 1215 | 1215 1215 | 1215 1260‘TARLE 3: PRICE INDICES FOR DRY HIRE RATES FOR PLANTS AND EQUIPMENTS ‘ase Year - 1990 (AVG) PL_SMALL EQUIPMENT. YEAR| JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV] DEC | AVG 1990 | 1000 100.0, 100.0 1000 1000 1000 1000 1000 1000 1000 1009 1000, 1000 4991, 1992. 1993, .2040,2011,2042,2013,2014,2016,2016 2017 | 4008 4008| 4008 4450) 445.0 4450 4450 4450 445.0 445.0 4450 4450 433. 2018 | 4450 445.0 445.0 4450 445.0 445.0 4450 4450 4450 A712 A712 A712) 451.5 ore | 4712) 471.2) 4712) A712) 47.2)
You might also like
Bulletin of Construction Statistics January 2025 Fi
PDF
No ratings yet
Bulletin of Construction Statistics January 2025 Fi
33 pages
Instant ebooks textbook Spon s Civil Engineering and Highway Works Price Book 2022 Spon s Price Books 36th Edition Aecom download all chapters
PDF
100% (3)
Instant ebooks textbook Spon s Civil Engineering and Highway Works Price Book 2022 Spon s Price Books 36th Edition Aecom download all chapters
65 pages
Full Thesis Final Version 2021 Anushka
PDF
No ratings yet
Full Thesis Final Version 2021 Anushka
341 pages
Cida Bulletin of Construction Statistics January 2021
PDF
100% (1)
Cida Bulletin of Construction Statistics January 2021
29 pages
SLIA PART III Exam - Case - Study - Chapter 01
PDF
No ratings yet
SLIA PART III Exam - Case - Study - Chapter 01
12 pages
Updated Business Information System
PDF
50% (2)
Updated Business Information System
10 pages
C&W Building Code KPK Government PDF
PDF
No ratings yet
C&W Building Code KPK Government PDF
296 pages
Fidic Construction Contract
PDF
No ratings yet
Fidic Construction Contract
3 pages
ALL ICTAD Bulletin 2017 PDF
PDF
100% (2)
ALL ICTAD Bulletin 2017 PDF
32 pages
Standard - ICTAD Publications PDF
PDF
No ratings yet
Standard - ICTAD Publications PDF
4 pages
Cida Bulletine 2023 December
PDF
No ratings yet
Cida Bulletine 2023 December
33 pages
All CIDA Bulletin - January 2020
PDF
No ratings yet
All CIDA Bulletin - January 2020
32 pages
Cida Bulletin - April 2019
PDF
No ratings yet
Cida Bulletin - April 2019
32 pages
ICTAD Bulletin - 2017 March
PDF
100% (1)
ICTAD Bulletin - 2017 March
29 pages
ICTAD Review
PDF
0% (1)
ICTAD Review
48 pages
Fleet The Tradition About The Corporeal Relics of Buddha
PDF
No ratings yet
Fleet The Tradition About The Corporeal Relics of Buddha
19 pages
CIDA Price Adjustment formula and method
PDF
No ratings yet
CIDA Price Adjustment formula and method
58 pages
Estimating and Valuation.
PDF
83% (6)
Estimating and Valuation.
133 pages
BSR 2024
PDF
No ratings yet
BSR 2024
68 pages
Ictad 2008
PDF
100% (1)
Ictad 2008
219 pages
LCC Assignment
PDF
No ratings yet
LCC Assignment
11 pages
Road Classification in
PDF
No ratings yet
Road Classification in
3 pages
Is 15658 2006
PDF
No ratings yet
Is 15658 2006
27 pages
To Give A Reasonably Accurate Idea of The Cost
PDF
No ratings yet
To Give A Reasonably Accurate Idea of The Cost
6 pages
1
PDF
No ratings yet
1
2 pages
Literature Study
PDF
No ratings yet
Literature Study
12 pages
ARTICLE, 2002 - Causes-of-Construction-Delay
PDF
No ratings yet
ARTICLE, 2002 - Causes-of-Construction-Delay
7 pages
Conflict Situations When Applying SLS573 Standards Methods of Measurements Into Real World
PDF
73% (11)
Conflict Situations When Applying SLS573 Standards Methods of Measurements Into Real World
34 pages
Public Participation Improvement in Kalmunai Municipal Council
PDF
100% (1)
Public Participation Improvement in Kalmunai Municipal Council
9 pages
BSR 2019
PDF
100% (3)
BSR 2019
109 pages
Icms Clean 2
PDF
100% (1)
Icms Clean 2
42 pages
Steel Insight 4
PDF
No ratings yet
Steel Insight 4
7 pages
Main Strengths of The QS Which Makes Them More Suitable For Commercial Manager Position
PDF
100% (1)
Main Strengths of The QS Which Makes Them More Suitable For Commercial Manager Position
1 page
PP1 Tutorial 2
PDF
No ratings yet
PP1 Tutorial 2
22 pages
Tender Documentation - Presentation
PDF
No ratings yet
Tender Documentation - Presentation
34 pages
Types of Footing
PDF
No ratings yet
Types of Footing
3 pages
SBD 02 2007 January - Second Edition
PDF
No ratings yet
SBD 02 2007 January - Second Edition
143 pages
F45T002 1 NCS
PDF
No ratings yet
F45T002 1 NCS
105 pages
1the Changing Role of Quantity Surveyors in The Procurement Process Final Version
PDF
No ratings yet
1the Changing Role of Quantity Surveyors in The Procurement Process Final Version
30 pages
Roads Sinhala Note 2
PDF
100% (1)
Roads Sinhala Note 2
32 pages
Presentation On Calculation of Price Escalation
PDF
No ratings yet
Presentation On Calculation of Price Escalation
22 pages
Chapter 21road and Road Structure
PDF
No ratings yet
Chapter 21road and Road Structure
14 pages
Valuing Construction Variation by Using PWA, FIDIC, ICWMF and CEDA Fluctuation Formula Mechanism
PDF
100% (1)
Valuing Construction Variation by Using PWA, FIDIC, ICWMF and CEDA Fluctuation Formula Mechanism
5 pages
Civil - Ele Specification
PDF
No ratings yet
Civil - Ele Specification
283 pages
BWK
PDF
No ratings yet
BWK
13 pages
B3 Tendering Rules PN6
PDF
No ratings yet
B3 Tendering Rules PN6
27 pages
Role of QS in Contemporary Times. How The Future QS Job Role Is Likely To Be Different From Today
PDF
No ratings yet
Role of QS in Contemporary Times. How The Future QS Job Role Is Likely To Be Different From Today
4 pages
Prabodhanam Explorer'09
PDF
No ratings yet
Prabodhanam Explorer'09
984 pages
Contract
PDF
No ratings yet
Contract
8 pages
HKSMM4
PDF
No ratings yet
HKSMM4
219 pages
Effects of Variation Orders
PDF
No ratings yet
Effects of Variation Orders
3 pages
Cida Bulletin of Construction Statistics February 2021
PDF
100% (1)
Cida Bulletin of Construction Statistics February 2021
29 pages
BULLETIN OF CONSTRUCTION STATISTICS -OCTOBER 2024
PDF
100% (1)
BULLETIN OF CONSTRUCTION STATISTICS -OCTOBER 2024
33 pages
All CIDA Bulletin - July 2019
PDF
No ratings yet
All CIDA Bulletin - July 2019
29 pages
01. ICTAD Bulletin - January 2018
PDF
No ratings yet
01. ICTAD Bulletin - January 2018
29 pages
Cida Bullein of Construction Statistics October 2020
PDF
No ratings yet
Cida Bullein of Construction Statistics October 2020
28 pages
Statistical Tables On CMWPI For December 2021
PDF
No ratings yet
Statistical Tables On CMWPI For December 2021
8 pages
W2 - Cost Index
PDF
100% (6)
W2 - Cost Index
45 pages
Statistical Tables on CMRPI February 2024
PDF
No ratings yet
Statistical Tables on CMRPI February 2024
7 pages
CCI Methodology
PDF
No ratings yet
CCI Methodology
17 pages
CMWPI Tables November 2018
PDF
No ratings yet
CMWPI Tables November 2018
11 pages
Technical Data Sheet - Pile Driving Analyzer
PDF
No ratings yet
Technical Data Sheet - Pile Driving Analyzer
2 pages
Survey - Rason Proforma Detailed
PDF
No ratings yet
Survey - Rason Proforma Detailed
3 pages
Lab - SpECtite RS60 TDS PDF
PDF
No ratings yet
Lab - SpECtite RS60 TDS PDF
2 pages
Lab - Hypercrete HS New
PDF
No ratings yet
Lab - Hypercrete HS New
2 pages
Nadi Thera Kumariya
PDF
No ratings yet
Nadi Thera Kumariya
72 pages
201311QAQC Monthly Report
PDF
No ratings yet
201311QAQC Monthly Report
9 pages
Sikadur - 31 SBA S-02 MY
PDF
No ratings yet
Sikadur - 31 SBA S-02 MY
4 pages
Concrete - Superplasticizers
PDF
No ratings yet
Concrete - Superplasticizers
1 page
BS 5450 (1977) - Specification For Sizes of Hardwoods and Methods of Measurement
PDF
No ratings yet
BS 5450 (1977) - Specification For Sizes of Hardwoods and Methods of Measurement
8 pages
Asme Sec Ix PT QB Article Xiv - Brazing Data
PDF
No ratings yet
Asme Sec Ix PT QB Article Xiv - Brazing Data
24 pages
BUDDHIST ERA 2556 - 2557: Victory Belongs To The Most Persevering
PDF
No ratings yet
BUDDHIST ERA 2556 - 2557: Victory Belongs To The Most Persevering
1 page