This document is a bill of quantities (BOQ) for strengthening work at the Warangal Super Speciality Hospital. It includes 7 items: [1] Providing a steel cuplock system and support system for structural elements, [2] Supporting structural elements temporarily during repair work, [3] Conducting reinforcement scans, applying alloy strips and laminates to beams, [4] Installing carbon fiber laminates on beams, [5] Installing carbon fiber laminates on bottom of beams, [6] Strengthening structural elements with fiber wrapping, and [7] Applying fireproofing material. The document provides descriptions, quantities, units, rates and amounts for each work item.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
303 views2 pages
BoQ-Beam Retrofitting Works LandT
This document is a bill of quantities (BOQ) for strengthening work at the Warangal Super Speciality Hospital. It includes 7 items: [1] Providing a steel cuplock system and support system for structural elements, [2] Supporting structural elements temporarily during repair work, [3] Conducting reinforcement scans, applying alloy strips and laminates to beams, [4] Installing carbon fiber laminates on beams, [5] Installing carbon fiber laminates on bottom of beams, [6] Strengthening structural elements with fiber wrapping, and [7] Applying fireproofing material. The document provides descriptions, quantities, units, rates and amounts for each work item.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
BOQ for the strengthening work for Warangal Super Speciality Hospital
Sr. No. Description Qty Unit Rate Amount Remarks
1 Providing & erecting sturdy steel cuplock system as per manufacturers specifications including necessary support system comprising of a combination of anchorage system and coupling QRO m 1000 arrangements to and from the adjoining structure, supports etc.till completion of work activity etc. complete. Material-L&T Scope. Installation-Vendor's scope Supporting the structural element temporarily using heavy-duty flat-headed steel props of minimum capacity 3 Ton and having height upto the bottom of the structural element erected vertically in plumb, braced horizontally and diagonally at center with each other using 40 Nb steel We are considering 2a. pipes and supporting a continuous 4" x 3" wooden runner just below the structural element, resting QRO m 1000 Horseen Make on a wooden block to support the structure provisionally during repair and jacketing, etc. and maintaining them in position till required as directed by the consultant (mode of measurement per floor per prop per rep). Material-L&T Scope. Installation-Vendor's scope Breaking, Removing of brickwork/ water proofing/ floor finish if required (Including plaster chipping 2b. within the brick area, tiles) work by low impact Hammer, Breaker without damaging the structure. QRO m 1000 Material-L&T Scope. Installation-Vendor's scope Advanced 3D Reinforcement Scanning of RCC element: Conducting adequate no's. of 300mm deep scan passes (concrete penetrating radar scans) to detect the steel reinforcement or prestressing cables in existing RCC elements by using 3a. ground/ Wall penetrating radar system to avoid the damages to the main bars during drilling for inserting bolts etc. complete. using Hilti PS300/PS1000 machine/equivalent make, with localisation accuracy of ±10 mm 3 Application of structural grade adhesive putty in between near surface high strength (450MPa) 3b. alloy strips and concrete surface with necessary surface cleaning filling of the gaps etc (Material Make : SRMPL : SRM SA/ Equivalent Make) We are considering 380 m 4500 1710000 Providing, transporting, lifting, cutting in 100mm wide- & 12 mm thick SRM HS Plates (High strength Horseen Make alloy strips of minimum 450MPa) of required length, including surface preperation for alloy 3c. plate, including fixing inposition on beams by maintining proper alignment as per detailed drawing etc complete (Bolts to be paid under separte item). (Material Make : SRMPL : SRM HS Plates/ Equivalent Make) 3d. Providing, Supplying, transporting, drilling holes upto 18 mm dia, 100mm depth by rotary hammer drill, dust removing. (i) 16 mm dia mechanical anchor (5.8 grade & above), up to 85 mm embedded/ up to18 mm dia hole. (Material Make :Wurth / Klimas / SRMPL/Equivalent Make) Installation of Laminates on top of beams Providing and applying the marked application area with surface primer compatible with proposed FRP laminate system and allowing it to cure as per manufacturers specification. Based on 4 drawings, the precured FRP elements are to be trimmed to the required application / working lengths and applied with even and laminar layer of structural grade, non sag, epoxy adhesive and placed in position as per manufacturers specification. Clearing of the spilled over epoxy from sides of laminate and filling of gaps of upto 2 mm thick if any, etc complete. Note: Single and continous laminate to be used for application i.e., lapping not allowed (Rate including wastages if any). SRM C/Equivalent make Lam 100 x 5 Carbon Laminate NPS, with characteristic tensile strength of We are considering 225 m 5500 1237500 atleast 1500MPa, Ef > 140GPa, Transverse flexural strength of atleast 70MPa with inter laminar shear Horseen Make 4a. strength of atleast 65MPa, fiber volume fraction of 65%, made under strict quality controlled thermoset epoxy resin pultrusion process Non prestress Anchor system : Providing and fixing in position suitably designed, system compatible non corrosive aluminium alloy end anchor plate of H9 Grade of required size with M12 4b. to M16 point anchorage including structural grade, non sag, epoxy adhesive, compatible mechanical anchors as per manufacturers specifications. (i) SRM AP H9NP 250x150x12(or Equivalent make) (ii) SRM AP H9NP 350x150x12(or Equivalent make) BOQ for the strengthening work for Warangal Super Speciality Hospital Sr. No. Description Qty Unit Rate Amount Remarks 5 Installation of Laminates on bottom of beams SRM C Lam 100 x 5 Carbon Laminate NPS (or Equivalent make), with characteristic tensile strength We are considering of atleast 1500MPa, Ef > 140GPa, Transverse flexural strength of atleast 70MPa with inter laminar 775 m 4100 3177500 5a. Horseen Make shear strength of atleast 65MPa, fiber volume fraction of 65%, made under strict quality controlled thermoset epoxy resin pultrusion process PosiTest AT-M with 50mm C1583 Kit (or Equivalent make): Carrying out Pull-Off Adhesion Testing with Automatic Adhesion Testers confirming to ASTM C1583 (tensile strength of concrete overlays). 6a. Including using 50mm C1583 Kit, ideal for measuring the tensile strength of concrete surfaces and concrete repairs and overlay material. To be conducted on each beam on vertical surfaces where wrapping is to be performed. 2 tests per beam. Application of structural grade putty to builtup the surface with necessary surface cleaning filling of 6b. the gaps etc (Material Make : SRMPL/Equivalent Make) Strengthening structural elements with non metallic composite fiber wrapping system comprise of fiber sheet and compatible saturant, by dry/wet layup system including, Surface preparation: Grinding/ moulding concrete substrate, cleaning it with wire brush removing oil, laitance if present, rounding sharp edges to min 25 mm radius etc. complete. Profiling: Applying compatible primer on prepared substrate, Filling the holes and uneven surface with We are considering thixotropic putty with Compatible flat metal pointless spreader etc. complete Wrapping: 810 sqm 5200 4212000 Horseen Make 6c. Wrapping the fiber sheet to structural element at desired orientation using Compatible flexible spring type steel core oscillate tool to avoid any air voids etc. repeat the same procedure for multiple layers(if any) with the interval of 8 hrs. Sand pasting on outer most wrap: Applying second coat of saturant after min. 12 hrs, rectify air voids if any paste the river sand on it to make surface rough to take any further finishes (Mode of measurement: surface area of Fiber sheet Consumed and not surface area of RCC elements, overlaps to be measured seperately) Material make : SRMPL/Equivalent Make (i) SRM-C-WRAP UD900 Uni-directional carbon fiber wrap Providing and fixing of cabon anchors SRM C Anchors , 75 mm embedment, 150 mm flay with minimum 8 petals at 300 mm c/c or required spacing including drilling of holes, cleaning of dust 6d. with air blowers, fixing of anchor with epoxy saturant, adhesive or putty and allowing it to cure in position. Providing and applying pre packed cementitious fire proofing material for 2 hours fire rating 640 sqm 2250 1440000 over strengthened area at a 7 thickness of upto 25mm for structural members. Material make: Carboline/Sika/SRMPL/Equivalent Make Total Amount Excluding Taxes: 1,17,77,000.00