0% found this document useful (0 votes)
753 views

Daily Construction Report Rev2

1) This is the daily construction status report for the Cavite-Laguna Expressway Project in the Cavite Segment dated December 30, 1999. 2) No manpower, materials testing/quality control activities, or special events/delays were reported for the day. 3) No description of work performed, equipment status, environmental/safety issues, or site photos were provided.

Uploaded by

SRC Construction
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
753 views

Daily Construction Report Rev2

1) This is the daily construction status report for the Cavite-Laguna Expressway Project in the Cavite Segment dated December 30, 1999. 2) No manpower, materials testing/quality control activities, or special events/delays were reported for the day. 3) No description of work performed, equipment status, environmental/safety issues, or site photos were provided.

Uploaded by

SRC Construction
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

REPORT

DAILY CONSTRUCTION STATUS REPORT No Date


CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment) 30-Dec-99

1. Contract Details
Owner MPCala Holdings Inc. Principal Contractor E.C. de Luna Construction Construction Manager (ECDLCC) Antonio P. Aguilar
Corp.
Designer DCCD Engineering Corporatio Grantor DPWH NTP 24-Aug-20

Independent Consultant UTCP/FDSC Client Representative Danilo R. Ignacio Finish Date 30-Dec-99

2. Manpower 3. Other Details

Designation No No of Hours Weather Legend:


Fair
15
Project Manager Date
Road Manager Shower
1
Field Engineer Night
Time Cloudy
Material Engineer Work Shift NORMAL OT
Safety Officer
Surveyor Working Hours 8:00AM - Day Rain/
Time Storm
Survey Aides 5:00PM -
HE Operators
Mason/Carpenter
Steelman
Welder
Mechanics/Electricians 4. Materials Testing and Quality Control Activities
Dump Truck Driver 1 None
Plant Clerk 2
Labor 3
Utility
Service Driver
Security Guard 5. Special Events/ Delay & Downtime
Office Staff & Support 1 None
2
Total Manpower 3

6. Description of Work Performed

Stations
Pay Item Description Location Length (m) Area (m²) Volume (m³) Remarks
From To

TOTAL 0.00

7. Equipment 8. Environment, Health and Safety

Equipment Description Active Idle Total Remarks 1

1 Crushing/Screening Plants 150 t/hr 0 0 2

2 Screening/Washing Plant 150 t/hr 0 0 3

3 Concrete Batch Plant 60 cu. m/hr 0 0 4

4 Asphalt Batching Plant 120 t/hr 5

5 Bulldozer Crawler 302 hp

6 Motor Grader 155 hp-195 hp

7 Crawler Backhoe

8 Wheel-type Backhoe 9. Site Issues and Concerns


9 Vibratory Roller 1

10 Concrete Paver 2

11 Concrete Vibratory 3

12 Payloader 4

13 Plate Compactor 5

14 Dump Truck
15 Fuel Truck

16 Water Truck

17 Welding Machine

18 Tower Light

19 Generator Set
20 Service Vehicle

Total

F-CON-002a Rev 2 Dec 12, 2020 Page 1 of 7


REPORT
DAILY CONSTRUCTION STATUS REPORT No Date
CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment) 30-Dec-99

10. Site Photos

Consolidated by: Checked by: Noted By:


Office Engineer Quantity Engineer Project Manager MPCala

F-CON-002a Rev 2 Dec 12, 2020 Page 2 of 7


REPORT
DAILY CONSTRUCTION STATUS REPORT No Date
CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment) 30-Dec-99

F-CON-002a Rev 2 Dec 12, 2020 Page 3 of 7


CONTRACT STATUS REPORT - Err:508

CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment) Page 1 of 2

1. Contract Details
Design Manager: DPWH Package Manager: UTCP/FDSC Design Consultant: E.C. de Luna
Construction Corp.
Contract Admin: Antonio P. Aguilar Finish Date $0
Project Controls: Danilo R. Ignacio 0 $0 Sub-Contrator:
2. Key Dates Contract Target Wks Achieved 3. Possession Status
### #REF! #REF! #REF! #REF! #REF! ###
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! ###
### #REF! #REF! #REF! #REF! #REF! ###
### #REF! #REF! #REF! #REF! #REF! ###
### #REF! #REF! #REF! #REF! #REF! ###
### #REF! #REF! #REF! #REF! #REF! ###
4. Significant Events 5. Trend/Change Control Status
####REF! Trends raised this week: 2

####REF! Overall Trend Status (Post Period 5):

####REF! Raised to date: 13

####REF! Approved: 11

####REF! Pending: 2

6. Key Quantity Tracking

Yards/No. Series1 Series2 Series3 Resource


1.2

0.8

0.6

0.4

0.2

0
1

6a. Key Quantity Tracking Charts

Signalling - Signalling - Signalling - Signalling - Signalling - Signalling -


Move Signals Reprofile Co-Acting Signal Veg' Claerance TPWS OSS AWS

Signalling - Signalling - Signalling - Signalling - Signalling -


TPWS TSS AWI Magnet Data mods Banner Repeaters IBJ Move

Ver. 02a
CONTRACT STATUS REPORT - Week ?

CAVITE-LAGUNA EXPRESSWAY PROJECT (Cavite Segment) Page 2 of 2

7. AFC by Resource Code

Signalling - New Signals


Signalling - Move Signals

Note: AFC Period 8 £2,665,161


AFC includes Birse Structure and Murphys AFC Period 7 £2,665,161 Difference £0.00

8. WIP Current Week


Scope Poss'
Ref. No.
Total Description Location Qty

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

Look Forward - Next Week


Scope Poss'
Ref. No.
Total Description Location Qty

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

11. CIAR
Prev' Wks
Item Description Reference
Late
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

12. Actions
Description Action By
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Ver. 02a
#REF! #REF! #REF!
#REF! #REF! #REF!

Ver. 02a