Part 1
Part 1
Appendices
Bridge No. 10 Photo No. ( ∼ )
Code of authority -
Route name - DRR
Bridge name Krung Thon Bridge No. -
Authority
from Khat Bang Phlat from km+ 0
Place Distance Survey date 2009/10/24
to Khet Dusit to km+ 0
Bridge type(1) main road ・ side road ・ ramp Camber deform yes ・ no Item Type State
Bridge type(2) bridge ・ viaduct ・ plank pass Difference in glade yes ・ no Main girder Truss Corrosion, Deterioration of proofing, deformation by collis
Bridge properties
Bridge type(3) 6-span steel truss Continuous of barrieryes ・ no Cross beam I section steel -
Total length 360.00 (m) Continuous of curve yes ・ no Stringer I section steel Deterioration of proofing
Span 58 + 58 + 64 + 64 + 58 + 58 (m) Noise yes ・ no Cross frame T section steel Expansion by corrosion
Survey result
Nos. of span 6 span Space change yes ・ no Lateral brace − -
Joint
Width 12.00 (m) / (m) difference grade yes ・ no Slab Crack, free lime, Exfoliation
Outline of damage
Completion 1958 draining damage yes ・ no Abutment - -
Blocked drainage yes ・ no Pier Rectangular -
Ap-145
Horizontal Straight ・ incli(θ= 1.7 %) ・ Curve (R m) Crack of pavement yes ・ no Bearing Pin bearing Corrosion, accumulation of soil, flucture of locker bearing
Gradient Damage of lighting yes ・ no Trapezoidal Flucture of edge
Road information
Impressions
9.Waterway 10.Parking 11.Bike parkin 12.Park ・Condision of painting is not bad, but some plate thickness was reduced by corrosion
13.Vacant 14.Harbor Name ( Chao Phraya ) Especially flange of bracket should be take care a strength.
1.Inspection car 2.Falsework 3.On ground 4.Ladder 5.Lift car ・Deformation by ship collision was found at 1 center span.
Superstructure
6.On boat 7.Special camera 8.Others( ) Height of girde about 8.5m
Access method
1.Inspection car 2.Falsework 3.On ground 4.Ladder 5.Lift car ◆ Deterioration of bridge ◆
Substructure
6.On boat 7.Special camera 8.Others( ) deficient ・ fair ・ good
Diagnosis
・All bridge section is on the water ◆ Noticeable point ◆ ・Detail survey was finished on Sep.2009
History of repair;
Reason ・If inspection car is not available, false work ・Exfoliation of slab Repaint; − yy − mm
will be required ・Reduce thickness by corrosi Surveyor; Mr,Chujo, Mr.Kudo
Appendices
Present state ( 1 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 1
Span 1
Member Side view
Picture No. 2
Span 1
Member View on road
Picture No. 3
Span 1
Member View under girder
Ap-146
Appendices
Present state ( 2 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 4
Span 1
Member Side view of 1 span
Picture No. 5
Span 1
Member View of walkway
Picture No. 6
Span 1
Member Expansion joint
Ap-147
Appendices
Present state ( 3 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 7
Span 1
Member Expansion joint
Picture No. 8
Span 1
Member Side barrier
Picture No. 9
Span 1
Member Sign
Ap-148
Appendices
Present state ( 4 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 10
Span 1
Member Newel
Picture No. 11
Span 1
Member Approach bridge
Many scratch
Picture No. 12
Span 1
Member Approach bridge
Ap-149
Appendices
Present state ( 5 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 13
Span 1
Member Water supply
Picture No. 14
Span 1
Member Bottom chord
Picture No. 15
Span 1
Member Bottom chord
Ap-150
Appendices
Present state ( 6 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 16
Span 1
Member slab
Picture No. 17
Span 1
Member Bearing
Approach bridge
Picture No. 18
Span 1
Member Bearing
Approach bridge
Ap-151
Appendices
Present state ( 7 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 19
Span 1
Member Bearing
Fructure of edge
Approach bridge
Picture No. 20
Span 1
Member Bearing
Approach bridge
Picture No. 21
Span 1
Member Bearing
Ap-152
Appendices
Present state ( 8 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 22
Span 1
Member Bearing
Picture No. 23
Span 1
Member Bearing
Picture No. 24
Span 1
Member Bearing
Ap-153
Appendices
Present state ( 9 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 25
Span 1
Member Bearing
Picture No. 26
Span 1
Member Cross frame
Peeling of paint
Picture No. 27
Span 1
Member Bearing
Accumulation of soil
Ap-154
Appendices
Present state ( 10 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 28
Span 1
Member Bracket
Picture No. 29
Span 1
Member Bracket
Picture No. 30
Span 1
Member Chord member
Ap-155
Appendices
Present state ( 11 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 31
Span 1
Member Stringer
Peeling of paint
Picture No. 32
Span 1
Member Chord member
Fracture of concrete
Picture No. 33
Span 1
Member Chord member
Ap-156
Appendices
Present state ( 12 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 34
Span 1
Member Chord member
Picture No. 35
Span 1
Member Chord member
Corrosion
Picture No. 36
Span 1
Member Bottom chord
Ap-157
Appendices
Present state ( 13 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 37
Span 1
Member Upper chord
Picture No. 38
Span 1
Member Vertical member
Picture No. 39
Span 1
Member Cross frame
Adjustment of height?
Ap-158
Appendices
Present state ( 14 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 40
Span 1
Member Chord member
Picture No. 41
Span 1
Member slab
Picture No. 42
Span 1
Member Slab
Ap-159
Appendices
Present state ( 15 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 43
Span 1
Member Slab
Picture No. 44
Span 1
Member Slab
Exposure of rebar
Picture No. 45
Span 1
Member slab
Exposure of rebar
Ap-160
Appendices
Present state ( 16 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 46
Span 1
Member Slab
Exposure of rebar
Picture No. 47
Span 1
Member slab
Crack on walkway
Picture No. 48
Span 1
Member Slab
Walkway. Crack
0.4mm∼0.75mm
Ap-161
Appendices
Present state ( 17 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 49
Span 1
Member Under bridge
Bangkok side
Picture No. 50
Span 1
Member Slab
Consultant is Norconsultant
Picture No. 51
Span 1
Member Substructure
Ap-162
Appendices
Present state ( 18 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 52
Span 1
Member Slab
Picture No. 53
Span 1
Member slab
Picture No. 54
Span 1
Member Slab
Ap-163
Appendices
Present state ( 19 / 19 )
Authority DRR Address Bangkok Data 24-Oct-09
Bridge Krung Thon Bridge
Picture No. 55
Span 1
Member Slab
Picture No. 56
Span 1
Member Water supply
Picture No. 57
Span 1
Member
Ap-164
Inspection sheet of visual survey
Appendices
Bridge No. 11 Photo No. ( ∼ )
Code of authority -
Route name - BMA
Bridge name RAMA VIII Bridge No. -
Authority
from Khat Bang Phlat from km+ 0
Place Distance Survey date 23-Oct-2009
to Khet Phra Nakhon to km+ 0
Bridge type(1) main road ・ side road ・ ramp Camber deform yes ・ no Item Type State
Bridge type(2) bridge ・ viaduct ・ plank pass Difference in glade yes ・ no Main girder Composite I girder -
Bridge properties
Bridge type(3) 4-span composite 2 I girder cable stayed bridge Continuous of barrieryes ・ no Cross beam I section steel -
Total length 475.00 (m) Continuous of curve yes ・ no Stringer - -
Span 75 + 50 + 50 + 300 (m) Noise yes ・ no Cross frame - -
Survey result
Nos. of span 4 span Space change yes ・ no Lateral brace - -
Joint
Width 29.20 (m) / (m) difference grade yes ・ no Slab - (cannot see from outside due to decorative plate)
Outline of damage
Completion 2002 draining damage yes ・ no Abutment - -
Blocked drainage yes ・ no Pier Rectangular Free lime at cross beam
Ap-165
Horizontal Straight ・ incli(θ= 2 %) ・ Curve (R m) Crack of pavement yes ・ no Bearing Slide bearing -
Gradient Damage of lighting yes ・ no Steel Generally healthy
Road information
Impressions
9.Waterway 10.Parking 11.Bike parkin 12.Park
13.Vacant 14.Harbor Name ( Chao Phraya )
1.Inspection car 2.Falsework 3.On ground 4.Ladder 5.Lift car
Superstructure
6.On boat 7.Special camera 8.Others( Inspection vehicle ) Height of girde about 10m
Access method
1.Inspection car 2.Falsework 3.On ground 4.Ladder 5.Lift car ◆ Deterioration of bridge ◆
Substructure
6.On boat 7.Special camera 8.Others( Inspection vehicle ) deficient ・ fair ・ good
Diagnosis
Present state ( 1 / 8 )
Authority BMA Address Bangkok Data 23-Oct-09
Bridge RAMA VIII
Picture No. 1
Span 1
Member Side view
Picture No. 2
Span 1
Member View on road
Picture No. 3
Span 1
Member View under bridge
Ap-166
Appendices
Present state ( 2 / 8 )
Authority BMA Address Bangkok Data 23-Oct-09
Bridge RAMA VIII
Picture No. 4
Span 1
Member Pylon
Picture No. 5
Span 1
Member Expansion joint
Modular type
Picture No. 6
Span 1
Member Expansion joint
Lack of bolt
Soil dump
Ap-167
Appendices
Present state ( 3 / 8 )
Authority BMA Address Bangkok Data 23-Oct-09
Bridge RAMA VIII
Picture No. 7
Span 1
Member View of cable
Picture No. 8
Span 1
Member Cable
Picture No. 9
Span 1
Member Cable
Ap-168
Appendices
Present state ( 4 / 8 )
Authority BMA Address Bangkok Data 23-Oct-09
Bridge RAMA VIII
Picture No. 10
Span 1
Member Cable fixing structure
Picture No. 11
Span 1
Member Cable fixing structure
Picture No. 12
Span 1
Member Cable fixing structure
Ap-169