1 en 1090 1 Questionnaire
1 en 1090 1 Questionnaire
EN 1090-1
Company Name
Address
Management Rep.
Please complete the following checklist and submit to NSAI with your documentation for the
preliminary assessment.
6.3.1 General
Have you documented your FPC system?
6.3.2 Personnel
Who has overall responsibility for the FPC and its
implementation?
6.3.3 Equipment
Do you have a list of essential equipment used for
production?
Complaints
How are customer complaints received and responded
to and is this documented in a procedure?
Sub‐contracting
What sub‐contractor(s) of services or activities are
used, if any, as part of the manufacturing process
(e.g. welding, inspection, non‐destructive testing, heat
treatment, galvanising, surface treatment, structural