0% found this document useful (0 votes)
101 views1 page

Water Tank

The document provides general notes for a construction project, including: 1. All dimensions are in mm and levels are in m unless noted otherwise. 2. Concrete shall be machine mixed and vibrated. 3. The safe bearing capacity of soil is 130 kN/m2 according to the geotechnical report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views1 page

Water Tank

The document provides general notes for a construction project, including: 1. All dimensions are in mm and levels are in m unless noted otherwise. 2. Concrete shall be machine mixed and vibrated. 3. The safe bearing capacity of soil is 130 kN/m2 according to the geotechnical report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

GENERAL NOTES:
1. ALL DIMENSIONS ARE IN mm AND LEVELS ARE IN m UNLESS MENTIONED OTHERWISE.
2. ANY DISCREPANCIES OR OMISSION OR CHANGES SHALL BE BROUGHT TO NOTICE PRIOR TO EXECUTION.
3. ALL CONCRETE SHALL BE MACHINE MIXED AND VIBRATED.
Ø8000 4. S.B.C. OF SOIL IS 130 kN/m2 IN REFERENCE TO THE SITE GEOTECHNICAL REPORT.
℄OF COLUMN C1 5. CONCRETE GRADE USED FOR ESR IS M30 AND FOR STAGING IS M25 UNLESS OTHERWISE MENTIONED. CONCRETE MIX
DESIGN SHALL BE AS PER PROJECT SPECS.
℄OF WALL ℄OF WALL MAX 1418 (TB1) 6. ALL MAIN AND STIRRUPS STEEL IS TMT TOR STEEL OF GRADE Fe 500 N/mm2.
A J J
LAP
J
7. ALL LAPS AND DEVELOPMENT LENGTH SHALL BE AS PER THE VALUES GIVEN BELOW AND SHALL BE STAGGERED. LAPS SHALL
BE CONSIDERED AS STAGGERED IF THE C/C DISTANCE OF THE SPLICES IS NOT LESS THAN 1.3 TIMES THE LAP LENGTH.
A
2Ld 7.1. Ø10 490 (Ld/LAP)
7.2. Ø12 590 (Ld/LAP)
Q1 3NOs-16# 7.3. Ø16 780 (Ld/LAP)

250
4-8# 7.4. Ø20 980 (Ld/LAP)
7.5. Ø25 1220 (Ld/LAP)
WALL 8. DE-SHUTTERING PERIOD SHALL NOT BE LESS THAN -
WALL 250 8.1. VERTICAL FACES OF COLUMN BEAMS & WALLS = 48 hrs
TIES 8.2. SLAB SPANNING UPTO 3.50 M. = 7 days

500
3NOs-16# 8.3. SLAB SPANNING OVER 3.50 M. = 14 days
50 2L TIES 8#@160 C/C 50 8.4. BEAMS = 21 days
SECTION J-J

Ld
9. STEEL CHAIRS SHALL BE PROVIDED TO KEEP TOP REINFORCEMENT IN PROPER AND CORRECT POSITION.
2L TIES 8#@100 C/C 50 10. CONSTRUCTION SHALL BE STRICTLY IN ACCORDANCE WITH IS 456-2000.
J J J SCALE 1:30
11. ANY SOFT OR LOOSE STRATUM MET WITH UNDER FOUNDATION, BASE SLAB ETC. SHALL BE EXCAVATED AND MADE GOOD
CJ 50
300
TIES WITH COMPACTED SOIL TO 95% PROCTOR DENSITY.
12. BACK FILLING SHALL BE DONE IN UNIFORM LAYERS ALL AROUND THE STRUCTURE.
Q1 13. FILLING UNDERNEATH THE STRUCTURAL ELEMENTS, WHEREVER REQUIRED, SHALL BE DONE IN LAYERS NOT EXCEEDING
ELEVATION OF BEAM - TOP RING BEAM SECTION Q1-Q1 150MM THICK OR AS PER CONTRACT SPECIFICATION/BOQ.
SCALE 1:40 14. LOCATION & ORIENTATION OF THE ESR PIPE PENETRATIONS, PIPE SUPPORT
SCALE 1:30
ARRANGEMENT SHALL BE AS PER APPROVED WTP/ESR LAYOUT AND THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
APPROVED GAD.
Ø8000 15. CONTRACTOR SHALL BE RESPONSIBLE FOR CONCRETE MIX, QUALITY, SHUTTERING DESIGN AND SAFETY, CONCRETE CURING,
WORKMANSHIP, SITE RISKS AND ACCIDENTS DUE TO PREMATURE DE-SHUTTERING, ALL LIABILITIES OF CONSTRUCTION RISKS.

℄OF WALL ℄OF WALL 16. CONTRACTOR OR HIS ENGINEER WILL BE RESPONSIBLE FOR WORK EXECUTION, SITE EXECUTION AND CHECKING AS PER THIS
DRAWING.
B 17. REFERENCE I.S. CODES:
1.1. IS 456-2000 - PLAIN AND REINFORCED CONCRETE.
B
185 LAP 185
ELEVATION OF BEAM - TB1 1.2. IS 1893-2016 - EARTHQUAKE RESISTANT DESIGN OF STR
K K K 1.3. IS 13920-2016 - DUCTILE DESIGN AND DETAILING OF REINFORCED CONC STR
2Ld SCALE 1:40 1.4. IS 11682-1985 (2003) - CRITERIA FOR DESIGN OF RCC STAGING FOR ESR.
2. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE: -
1.1. TOP DOME (WATER FACE) = 45mm

300
6-10# 1.2. TOP DOME (OUTER FACE) = 30mm
℄OF COLUMN C1 1.3.
1.4.
BOTTOM DOME (WATER FACE) = 50mm
BOTTOM DOME (OUTER FACE) = 30mm
300 1891 (TB2) 1.5. CYLINDRICAL WALLS (WATER FACE) = 50mm
50 2L TIES 8#@160 C/C 50 TIES 1.6. CYLINDRICAL WALLS (OUTER FACE) = 30mm
MAX
1.7. CONICAL WALLS (WATER FACE) = 50mm
1.8. CONICAL WALLS (OUTER FACE) = 30mm
K K K
SECTION K-K R1 3NOs-16# 1.9. RING BEAM (WATER FACE) = 50mm
SCALE 1:30 1.10. RING BEAM (OUTER FACE) = 30mm
1.11. BEAM ABOVE GROUND = 30mm
1.12. BEAM BELOW GROUND = 40mm
ELEVATION OF BEAM - MIDDLE RING BEAM 1.13. COLUMN = 40mm
1.14. WALKWAY = 30mm

500
SCALE 1:40
3NOs-16# 1.15. FOUNDATION (TOP & BOTTOM) = 50mm
1.16. WALL (EARTH FACE) = 30mm
2. AS PER IS1893 PART-2, R=2.5 IS USED FOR ANALYSIS AND DESIGN. DUCTILE DETAILING IS CARRIED OUT AS PER IS 13920:2016.

Ld
Ø6000 3. FOR REINFORCEMENT AROUND OPENING, WATERSTOP AND RAILING DETAILS REFER TO PROJECT STANDARD DETAIL
2L TIES 8#@100 C/C 50 GENERAL SHEET.
C ℄OF COLUMN C1 ℄OF COLUMN C1 ℄OF COLUMN C1 ℄OF COLUMN C1 CJ 50 300
TIES
SUBMITTED BY :- M/S DARA - ECO PROTECTION (JV)
C
LAP R1
L 2Ld L L SECTION R1-R1
SCALE 1:30
SIDE FACE REINFO.
4NOs- 20#

700
4NOs- 12#
SIDE FACE
4NOs- 20# ELEVATION OF BEAM - TB2 PROOF CHECKED BY:-
L L L SCALE 1:40
500 TIES
(5450) 4L TIES SECTION L-L
℄OF COLUMN C1
50 50 2400 (TB3)
8#@170 C/C SCALE 1:30
MAX
APPROVAL BY :-

D ELEVATION OF BEAM - BOTTOM RING BEAM S1


3NOs-16# D
SCALE 1:40

500
3NOs-16#

Ld
℄OF ℄OF 2L TIES 8#@100 C/C
COLUMN C1 COLUMN C1 50
3527 (GB1) CJ 300
TIES
50
S1
M1 M2 M1 SECTION S1-S1
SCALE 1:30
LAP ISSUED FOR
R0 14-Mar-23 RC. DRAWING FOR ESR APPROVAL
R.K. V.K.M.
3NOs-16# 3NOs-16#
Ld

Ld

ISSUED
REV DATE DESCRIPTION DRN CHK
500

500

FOR
ELEVATION OF BEAM - TB3
E (1188)2L TIES
8#@100 C/C
2L TIES (1188)2L TIES
8#@230 C/C 8#@100 C/C SCALE 1:40
ISSUE ABBR.: 'P'=PRELIMINARY, 'T'=TENDER, 'A'=APPROVAL,
E
50 50
M1 M2 M1 300
3NOs-16# TIES 300
3NOs-16# TIES 'C'=CONSTRUCTION,'AB'=AS BUILT

SECTION M1-M1 SECTION M2-M2 CLIENT


SCALE 1:30 SCALE 1:30
ELEVATION OF BEAM - GB1
SCALE 1:40 M/S STATE WATER & SANITATION
MISSION, LUCKNOW
℄OF COLUMN C1 3527 (BR)
℄OF COLUMN C1
SCHEME
N1 N2 N1
MATEIRIA KERMA WATER SUPPLY SCHEME IN
LAP
F 3NOs-16# 3NOs-16#
UTRAULA F
Ld

Ld

CONTRACTOR
500

500

50
(1189)2L TIES
8#@100 C/C
2L TIES (1189)2L TIES
8#@220 C/C 8#@100 C/C 50
M/S DARA - ECO PROTECTION (JV)
300
3NOs-16# TIES 300
3NOs-16# TIES
N1 N2 N1 SECTION N1-N1 SECTION N2-N2 STRUCTURAL CONSULTANT
SCALE 1:30 SCALE 1:30
ELEVATION OF BEAM - BR WSD CONSULTANT PVT. LTD.
SCALE 1:40 708, 7TH FLOOR, RDC, JAINA TOWER, RAJNAGAR,
GHAZIABAD, U.P.201002
EMAIL : [email protected] ;
MOBILE : 8506010400

G JOB TITLE G
PROPOSED OVERHEAD WATER TANK
Ø6000 100kL CAPACITY 12.0m STAGING AT
℄OF COLUMN/BEAM ℄OF COLUMN/BEAM MATEIRIA KERMA, UTRAULA
LAP
V V V 6NOs-16#
DWG TITLE
NUMERATION & RC DETAILING OF
ABBREVIATIONS:
700

6NOs-16#
BRM - BOTTOM RING BEAM
100kL-12M STAG. OHT AT
GB - GROUND BEAM (FIRST STAGING BEAM) FRB - FOUNDATION RING BEAM
H
50 5L TIES
8#@100 C/C
50
TIES
TB
BR
- TIE BEAM
- BRACING / STAGING BEAM
REINFO.
EF
- REINFORCEMENT
- EACH FACE
MATEIRIA KERMA, UTRAULA H
500
V V V BRB - BOTTOM RING BEAM TYP - TYPICAL
SECTION U-U NGL - NATURAL GROUND LEVEL APPROX - APPROXIMATE DRWN : R.K. CHECKED : V.K.M. APPROVED : N.K.
SCALE 1:30 FGL - FINISHED GROUND LEVEL TOC - TOP OF CONCRETE
TWL - TOP WATER LEVEL
ELEVATION OF BEAM - FOUNDATION RING BEAM TRB - TOP RING BEAM DATE : 14-Mar-23 SCALE AT A1
SCALE 1:40 MRB - MIDDLE RING BEAM
DRAWING NO: WSD/MKUL/01/2022/STR-004 SHEET 4 OF 4 REV: R0

1 2 3 4 5 6 7 8 9 10 11 12