GSA Generic Lecture Rooms Assessment
GSA Generic Lecture Rooms Assessment
Assessment
School/Professional Location: (Site/ Building/ Room)
Support Area:
Task: Risk assessment for the activities associated with work in Lecture Rooms & Similar Teaching-Based Environments
1 of 7
What are the Who Risk Evaluation
Risk
might be Are the following control Rating
hazards? Yes/
harmed? What are the risks measures in place to eliminate or Corrective actions required Severity Likelihood Overall Low,
(See list of sample No
hazards) (e.g. reduce the risks? (1 – 5) (1 – 5) risk Medium
(S x L) or High
s. Staff, appliances prohibited unless subject
to appropriate checks to ensure
safe condition and use.
2 of 7
What are the Who Risk Evaluation
Risk
might be Are the following control Rating
hazards? Yes/
harmed? What are the risks measures in place to eliminate or Corrective actions required Severity Likelihood Overall Low,
(See list of sample No
hazards) (e.g. reduce the risks? (1 – 5) (1 – 5) risk Medium
(S x L) or High
Staff, GSA’s specific DSE procedure.
3 of 7
What are the Who Risk Evaluation
Risk
might be Are the following control Rating
hazards? Yes/
harmed? What are the risks measures in place to eliminate or Corrective actions required Severity Likelihood Overall Low,
(See list of sample No
hazards) (e.g. reduce the risks? (1 – 5) (1 – 5) risk Medium
(S x L) or High
Staff,
hours
Unauthorised personnel able Lone working activities and
to access room(s) or other activities being carried undertaken
areas of the building and outside normal working hours
potential impact on the subject to risk assessment,
personal safety of those lone particularly those involving students.
working or working outside
normal hours. Means of summoning emergency
assistance easily available (e.g. red
emergency telephone).
WORKING AT Those
HEIGHT / working Falls whilst working at height Proper access equipment available,
ITEMS at height to erect displayed material or e.g. step ladders.
STORED AT and access storage areas.
HEIGHT anyone Awareness of safe working at height
below Items stored or displayed at techniques.
items at height not securely
height. positioned and falling to Sufficient space around areas
ground. where work at height and others
kept away from vicinity whilst taking
4 of 7
What are the Who Risk Evaluation
Risk
might be Are the following control Rating
hazards? Yes/
harmed? What are the risks measures in place to eliminate or Corrective actions required Severity Likelihood Overall Low,
(See list of sample No
hazards) (e.g. reduce the risks? (1 – 5) (1 – 5) risk Medium
(S x L) or High
Staff, place.
5 of 7
What are the Who Risk Evaluation
Risk
might be Are the following control Rating
hazards? Yes/
harmed? What are the risks measures in place to eliminate or Corrective actions required Severity Likelihood Overall Low,
(See list of sample No
hazards) (e.g. reduce the risks? (1 – 5) (1 – 5) risk Medium
(S x L) or High
ANY OTHER Staff,
HAZARDS
IDENTIFIED?
Notes:
1. This template relates to section 8.2 Use of Generic and Dynamic Risk Assessments in the GSA Health and Safety Risk Assessment Procedure
available at: http://www.gsa.ac.uk/media/1278542/GSA-Health-and-Safety-Risk-Assessment-Procedure-v2.pdf
3. Where hazards, or risks particularly risks to health and safety associated within those hazards, are not applicable indicate this at the relevant part
within the ‘corrective actions required’ section.
6 of 7
LIKELIHOOD DESCRIPTION RATING SEVERITY DESCRIPTION
OVERALL RISK
(Based on Likelihood X Severity)
SEVERITY INDEX
1 2 3 4 5
5 5-MED 10-MED 15-HIGH 20-HIGH 25 -EXTREME
LIKELIHOOD
Medium risks should only be tolerated for the short-term and then only whilst further control measures to
5-10 MEDIUM mitigate the risk are being planned and introduced, within a defined time period.
High risks activities should cease immediately until further control measures to mitigate the risk are introduced.
12-20 HIGH The continued effectiveness of control measures must be monitored periodically.
Work should not be started or continued until the risk has been mitigated. Immediate action is required to
reduce exposure. A detailed mitigation plan must be developed, implemented and monitored by senior
25 EXTREME management to reduce the risk before work is allowed to commence
7 of 7