Pd1096 Quiz

This document provides specifications and safety guidelines for construction projects, including requirements for canopies, ladders, scaffolding, excavations, and building features. Some key points include permissible dimensions for overhead structures, lighting levels for work areas, slope ratios for access ramps and walkways, and safety distances for electrical lines and excavation supports. Personnel and first aid requirements are also outlined.

Uploaded by

Dustine Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views6 pages

Pd1096 Quiz

This document provides specifications and safety guidelines for construction projects, including requirements for canopies, ladders, scaffolding, excavations, and building features. Some key points include permissible dimensions for overhead structures, lighting levels for work areas, slope ratios for access ramps and walkways, and safety distances for electrical lines and excavation supports. Personnel and first aid requirements are also outlined.

Uploaded by

Dustine Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PD 1096

Study online at https://quizlet.com/_6a91x3

1. Awning A movable shelter supported entirely from the exterior wall


of a building and of a type which can be retracted, folded,
or collapsed against the face of a supporting building.

2. Canopy/Marquee Permanent roofed structure above a door attached to and


supported by the building and projecting over a wall or
sidewalk.

3. 300 Horizontal clearance between the outermost edge of the


marquee and the curb line (mm)

4. 3.00 The vertical clearance between the pavement or ground


line and the under face of any part of the canopy/marquee
(m)

5. Tag line/guide This shall be used on all loads being hoisted or lowered.
rope

6. watchman gives warning at places where pedestrians and workers


are likely to pass under the operation. A man employed to
look after an empty building, especially at night.

7. relief worker Stationed close at hand to assist the worker in case of


accident.

8. 200Lux Sufficient light for scaffolds, canopied walkways, work or


storage areas, and equipment used.

9. 500Lux Average light intensity for the locations where tools and/or
machinery are used.

10. 2 times the Supports for the overhead sheave of the hoist shall be
weight of the designed to carry?
hoist

11. 1.80 Base of every hoist tower shall be screened or otherwise


protected on all sides to a height of not less than? (m)

12. 10.00

1/6
PD 1096
Study online at https://quizlet.com/_6a91x3
Every hoist shall be secured in not less than four (4)
directions against swaying or tipping at intervals of not
more than? (m)

13. 6 Guy derricks shall have the top of the mast held by not less
than how many steel guy cables?

14. 1/6 Cables, ropes, chains and blocks shall be of such size
that the maximum load supported by them will not exceed
______ of their breakig strength.

15. 6 Maximum lenght of single ladder? (Meters)

16. 1.20 Ladder landings shall be at least _____sqm and equipped


with handrails and toe boards

17. 300 Ladder rungs spacing? (mm)

18. 900 Ladders leading to floors, stagings or platforms shall ex-


tend at least ______mm above the level of such floors,
stagings or platforms.

19. 1.00 Ladders serving traffic for both directions simultaneously


shall be at least _____m wide?

20. 3.00 Clearance between the established grade line of the street
and/or sidewalk and the lowest under surface of any part
of the balcony. (m)

21. 3.00 Arcaded pedestrian walkways shall have a clear height of


______(m)

22. 2.40 Vertical clearance between the undermost surface of the


awning and the pavement or ground line (m)

23. 1/50 Rule VIII. Sidewalk pavement shall have a non-slip surface
and shall slope down from the building line towards the
curb line at not more than ______ and shall level off the
curb.

2/6
PD 1096
Study online at https://quizlet.com/_6a91x3
24. 200 Planting strip for grass and shrubs. (mm)

25. 300 Planting strip for trees. (mm)

26. 1/12 Slope of the street does not exceed _____ the sidewalk
grade shall follow the level or slope of the street.

27. 1/10 Whenever the slope of the street is _____, the sidewalk
shall maintained level for every 20.00-40.00m of run.

28. 1/6 The 20.00-40.00 of run for maintained level of sidewalk


shall be joined by means of a ramp having a slope not
exceeding _____

29. 1/3 to 1/4 The slope of the entry ramp of the driveway connecting the
roadway surface to the sidewalk surface

30. 1/8 If curb is more than 200mm, driveway shall be joined to


the sidewalk by means of a ramp of rough finish having a
slope of not more than _____

31. 1/10 Entrance or exit ramp slope

32. 300 Entrance or exit steps minimum thread (mm)

33. 2 Entrance or exit minimum number of steps

34. 100 Entrance or exit maximum riser (mm)

35. 10.00 Basement can be constructed if the minimum RROW


width is _____m

36. 3.00 The primary ventilation shaft (vertical) of the basement


shall have a clear distance of at least _____m

37. 1.20 The secondary ventilation shaft (angular) of the basement


shall have a clear distance of at least _____m

38. 60 The basement angular shafts shall be ay an angle of


_____

3/6
PD 1096
Study online at https://quizlet.com/_6a91x3
39. 2.40 The protective canopy for construction site shall have a
clear unobstructed height of _____m above the walkway

40. 30 Removal. Every protective fence or canopy shall be re-


moved within _____days after such protection is no longer
required as determined by the Building Official.

41. 5.00 No person, firm or corporation, either personally or


through an employee or agent of another shall operate
or move any machinery, equipment, materials, scaffolds,
closer than _____m to any energized high voltage over-
head electrical facilities. Unless authorize by the Electrical
Inspector.

42. 200 A properly equipped first-aid room and a physician or


competent nurse shall be in constant attendance for con-
truction sites having _____ workers are employed.

43. 2 risers, 1 tread, [,Section 1107. Maintenance and removal of protective


460, 700 devices,][,i. ladders and temporary stairways,]
The sum of the height of the ______ risers and the width
of ______ tread shall be not less than ________mm nor
more than _______mm

44. 900 Temporary stairways shall not be less than _____mm


wide.

45. 750 Landings for temporary stairways shall not be less than
_____mm long.

46. 3.60 Maximum vertical rise for temporary stairways (m)

47. 1:3 Maintenance and Removal of Protective Devices:


Runways and ramps shall have a slope not greater than
_____

48. 1.80 Maintenance and Removal of Protective Devices:


Total rise of runway or ramp between landings shall not
exceed ______m

4/6
PD 1096
Study online at https://quizlet.com/_6a91x3
49. Tell-tales A device used for measuring or monitoring cracks on
buildings during demolition or excavation.

50. Sump A channel at the bottom of the trench to allow water to


drain away

51. 7.50 Every trench, 1.50m or deeper shall be provided with


suitable means of exit or escape at least every ______m
of its length.

52. 10 Before commencing the excavation, the person making or


causing the excavation to be made shall notify in writing
the owners of adjoining buildings not less than _____days
before such excavation is to be made.

53. veneer Nonstructural facing of brick, concrete, tile, metal, plastic,


glass, or other similar approved materials attached to a
backing or structural components of the building for the
purpose of ornamentation, protection, or enclosure

54. Draft curtains Noncombustible barriers or dividers hung from the ceiling
in large open areas that are designed to minimize the
mushrooming effect of heat and smoke and impede the
flow of heat.

55. 300 Draft curtain shall enclose the perimeter of the unenclosed
opening and shall extend from the ceiling downwards at
least _____mm on all sides.

56. 600 AUTOMATIC SPRINKLERS shall be provided around the


perimeter of the opening and within a ______mm of the
draft curtain.

57. 1.80 The distance between the sprinklers in a draft curtain,


center-to-center (m)

58. Camber A slight convex curvature built into truss or beam to com-
pensate for any anticipated deflection so that it will have
no sag when under load.

5/6
PD 1096
Study online at https://quizlet.com/_6a91x3
59. 600 Opening of an Attic, it may be a square or circular (mm)

60. 800 Minimum clear headroom shall be provided above the


access opening of an attic (mm)

6/6