Project - Rev1
Project - Rev1
Project
Declaration: Group/Individual
1. No part of this assignment has been copied from another source, (not from another group or
student, an internet source or a book)
2. When another person’s words are used, this is shown in the text with “…” and referenced.
3. No part of this assignment has been written by anyone other than the member(s) of the group
named below.
4. We/I have a copy of this assignment that we/I can produce if the first copy is lost or damaged.
N.B. The marker may choose not to mark this assignment if the above declaration is not signed.
1
Electrical Power Distribution (ELE-4333)
Design and analysis of Power Distribution Lay out for the given
drawing .
Objectives:
Assesment Strategy:
Guidelines:
2
Electrical Power Distribution (ELE-4333)
Fire Room
2 Lifts and lift lobby etc. as in the drawing.
In the Design,
1. Consider Separate DBs for all Flats (6 Nos-DBs 1 to 6).
2. Another One DB for common Services (DB-Service).
3. Calculate Connected load for all DBs and the Total Load.
4. Prepare Load Schedule for all DBs.
5. Select proper size of Cables and Breakers for all DBs.
6. Calculate the additional kVAR required for the Power factor correction from 0.8
to 0.95.
Fig. 1
3
Electrical Power Distribution (ELE-4333)
c. Power Ratings
Light: 100 W
C.Fan: 100 W
E.Fan:100 W
WH:1500 W
AC: 3000 W
(Note:You can have other Electrical appliances in th Villa)
e. Ambient Temperature 30 Co