SAMPLING & QUALITY CONTROL OF FRESH CONCRETE REPORT
CLIENT Invelligent System General Contracting Co. Taal cy (SS Tab RefNo: Q/P/0121/23
PROJECT : SVC 380/115 Kv BSP - Qaisummah Date: _I-Feb-2023
Sample Description: Fresh Concrete ‘Test Request No:
Design Strength: C38 MPa,
Sample No: =
Type of Cement: SRC Cement Content: _440+MS_Ke/m’
Source : AL Bemar Readymix
Sampling Date: __1-Feb-2023
Test Method : As Above Sampled By: RGF Rep. (_P.M_) Sample Test Method :
Location test performed : at Site (Concrete Check point) Test duration: 5.0 Hours Sample Test Ret: zi
Env. Condition Temp. : _18.0°C to 22.5 °C Humidity : 68%
CONCRETE PLACEMENT | TRUCK | TICKET | TIME ~_TEMPERATURE | ‘CONC.
one LocaTion xo | xe feavcuepsawened AI | CONC Quaxtiry] Remarks
1 HY. Pedestals is | se | isi | 1420 | 25 | 280 80 __ [Casted (6) Cys. Set
2 Control Building Tech, 2 | 60 [1402 [143s | 290 120
3 Transformer -2 Pads or | 1269 | 15:54 | 1625 | 200 | 285 90
4 Columns & Pedestals o | on | v2 [i740 | iso [ 25 | 9s 20
Taal: 0 P
Remarks: ...
Note: Res relate oe sap xed Th Ta re
shited to Labon vehide No: VJ B 6621 Dates 2Feb-2003-
Bir Muhammad _ ge Approved By :
GleckediReviewed By
Ent Report
Tested By
(QPPnY.CONC.0-04R)RIVADH GEOTECHNIQUE & FOUNDATIONS CO.
fz STH TCHAD
CLIENT : intelligent System General Contracting Co. stall GAY gill AS pli AS Lab Ref No: _Q/P/0121/23
PROJECT: SVC 380/115 Kv BSP - Qaisumah Date: _1-Feb-2023
Test Method : As Above Test Request No. -
Text performed Location : Pyle Labaniog Biryaah Semple Tent Ret
STRUCTURE: HV. Pedestals, Control Building Trech,
eatomer = Pas — Columns & Pedestals
psig StmeNCrIE NE“ HH Conent74AT7MS Oigeum) Type af Cenent_SRC Supple: AL Eamar Remix
one Tiarico4res_fab205 ar
rast DURATION: Mii now tine Ba vans
DIAMETER/BREADTH: _ 150.0_mm. LENGTH: _300.0_ mm. CROSS SEC. AREA: 17671.5 mm?
SanPLE | WIGHT | UNIT WEIGHT MAX] cour. | AVECOMP. ] —TYFEOF
No toap | sraencra | steexcra | FRACTURES
tom | age | ‘ary _| ve MPa
TAT [am [220 [| sma aia Te 3
Type 1 ‘Type2 ‘Types I
Type 4 ‘Types ‘Type 6
Ta) Cylinders casted by RGF Technician,
Cylinder casted and delivered to Lab. By client representative
REMARKS: Any defect in specimen or in capping: No Defect
INote: Result is related tothe sample tested. The Lab. is responsible forall information inthe report
> ;
cept the information provided by client
Hag Nawaz,
rested By, BFOUNDATH ge
— Sheet 1/1 appnovin sine End of Report
Conia oT Ts ce OT ROE Tay nl OUT 5
‘ry-concon.ourn) iy Gotenique and Foution Co{RGP
Pe 01125 ‘ulin 6964, King Sen Ron, Sana Ava, Baryéah AMQasin| RIVADH GEOTECHINIQUE & FOUNDATIONS CO.
Gg Fem. BE ee
TEST REPORT CONCRETE COMPRESSION TEST
(ASTM GCM 21
CLIENT : Intelligent System General Contracting Co, Aaa) ental eth tN 52
PROJECT: ‘SVC 380/115 Ky BSP - Qaisumah
‘Test Method : As Above
Test performed Location : Physical Laboratory Buraydah
STRUCTURE: HY. Pedestals, Control Building Trech,
‘Transformer - 2 Pads Columns & Pedestals
(QP/0121/23
1-Feb-2023
}8_ Cement : 440+MS (kg/eum) Type of Cement:_SRC_ Supplier : AL Eemar Readymix
T-Feb-2023, 8-Feb-2023, AGE: 7 Days
TEST DURATION: 4 _ Minutes 23.4 numirry: 43%
DIAMETER/BREADTH: __150.0_mm, LENGTH: _300.0_mm, — CROSSSEC.AREA:_1767L5__mm*
‘SAMPLE | WEIGHT | UNIT WEIG MAX comp.) AVE. COMP. ‘YPE OF
No. LOAD | STRENGTH | STRENGTH FRACTURES
(ems) (kg/CM), (kN) MPa. MPa,
LA 12368 2.333 5578 31.6 ‘Type- 3
TH] Cylinders casted by RGF Technician.
Cylinder casted and delivered to Lab. By client representative
REMARKS: Any defect in specimen or in capping : No Defect
|Note: Result is related to the sample tested. The Lab. is responsible forall information inthe report, Except the information provided by client
Sultan ul Mull
Tested By
Sheets 1/1
oprah oF as ean oy ROP W may St be apo
‘orv-conc.on.ourt Rach Gesesiqe and Fondaon Co(RGR,
Be 0 as Bulg 626, King Salman Rod, Sana As, raya AsinIntelligent System General Contracting Co.
CEE He 2 PN
RIYADH GEOTECHNIQUE & FOUNDATIONS CO.
(ASTM C39/C39M-21)
La yaw AGS Lab Ref Ne
(QyP/0121/23
PROJECT: SVC 380/115 Kv BS!
P = Qaisumalh Date: _1-Feb-2023,
Test Method : As Above
‘Test performed Locatio
hysical Laboratory Buraydah
“Test Request N
‘Sample Test Ref. :
STRUCTURE: H.V. Pedestals,
“Transformer - 2 Pads
‘Control Building Trench,
‘Columns & Pedestals
DESIGN STRENGTH:__C- 38 Cement: 4404MS (kg/eusm) Type of Cement: _SRC_ Supplier : AL Bear Readymix
CASTING DATE: 1023 TESTING DATE:__I-Mar-2023 AGE: 28 Days
ST DURATION: 10 _ Minutes ROOM TEMP.: 230°C numprty: 41%
DIAMETER/BREADTH: _150.0_mm, LENGTH: _300.0_mm, CROSS SEC. ARWA:_1767L.5_mm"
‘SAMPLE ] WEIGHT | UNIT WEIGHT | MAX ‘COMP. ‘AVE. COMP. TYPE OF
No. LOAD | STRENGTH | STRENGTH FRACTURES,
(a) (kg/CM), kN) MPa. MPa.
Lc 12st 2.360 699.8 39.6 Type- 3
1-D 12486 2.355 705.1 39.9 Type- 2
LE 12523 2362 254 410 Type- 2
40.2
Note: Result is related to the sample tested. The Lab, is responsible forall informa
Typed Types ‘Types
Tal Ghlinders casted by ROF Technician,
() Cylinder casted and delivered to Lab. By client representative
REMARKS: Any defect in specimen or in capping!” NoDefeet
ation inthe report Excep the information provided by client
eth 2 AM
RIVADH GEOTK
2 FOUNDATIONS
APPROYEU REPORT
Checked/Reviewed By
ith Gevtecaigu and Fomton Co(RO)
Buin 656, King Salon Rod, Sana Arn, erayésh ALQas