0% found this document useful (0 votes)
25 views

01 Feb 2023

Uploaded by

alemar factory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
25 views

01 Feb 2023

Uploaded by

alemar factory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
SAMPLING & QUALITY CONTROL OF FRESH CONCRETE REPORT CLIENT Invelligent System General Contracting Co. Taal cy (SS Tab RefNo: Q/P/0121/23 PROJECT : SVC 380/115 Kv BSP - Qaisummah Date: _I-Feb-2023 Sample Description: Fresh Concrete ‘Test Request No: Design Strength: C38 MPa, Sample No: = Type of Cement: SRC Cement Content: _440+MS_Ke/m’ Source : AL Bemar Readymix Sampling Date: __1-Feb-2023 Test Method : As Above Sampled By: RGF Rep. (_P.M_) Sample Test Method : Location test performed : at Site (Concrete Check point) Test duration: 5.0 Hours Sample Test Ret: zi Env. Condition Temp. : _18.0°C to 22.5 °C Humidity : 68% CONCRETE PLACEMENT | TRUCK | TICKET | TIME ~_TEMPERATURE | ‘CONC. one LocaTion xo | xe feavcuepsawened AI | CONC Quaxtiry] Remarks 1 HY. Pedestals is | se | isi | 1420 | 25 | 280 80 __ [Casted (6) Cys. Set 2 Control Building Tech, 2 | 60 [1402 [143s | 290 120 3 Transformer -2 Pads or | 1269 | 15:54 | 1625 | 200 | 285 90 4 Columns & Pedestals o | on | v2 [i740 | iso [ 25 | 9s 20 Taal: 0 P Remarks: ... Note: Res relate oe sap xed Th Ta re shited to Labon vehide No: VJ B 6621 Dates 2Feb-2003- Bir Muhammad _ ge Approved By : GleckediReviewed By Ent Report Tested By (QPPnY.CONC.0-04R) RIVADH GEOTECHNIQUE & FOUNDATIONS CO. fz STH TCHAD CLIENT : intelligent System General Contracting Co. stall GAY gill AS pli AS Lab Ref No: _Q/P/0121/23 PROJECT: SVC 380/115 Kv BSP - Qaisumah Date: _1-Feb-2023 Test Method : As Above Test Request No. - Text performed Location : Pyle Labaniog Biryaah Semple Tent Ret STRUCTURE: HV. Pedestals, Control Building Trech, eatomer = Pas — Columns & Pedestals psig StmeNCrIE NE“ HH Conent74AT7MS Oigeum) Type af Cenent_SRC Supple: AL Eamar Remix one Tiarico4res_fab205 ar rast DURATION: Mii now tine Ba vans DIAMETER/BREADTH: _ 150.0_mm. LENGTH: _300.0_ mm. CROSS SEC. AREA: 17671.5 mm? SanPLE | WIGHT | UNIT WEIGHT MAX] cour. | AVECOMP. ] —TYFEOF No toap | sraencra | steexcra | FRACTURES tom | age | ‘ary _| ve MPa TAT [am [220 [| sma aia Te 3 Type 1 ‘Type2 ‘Types I Type 4 ‘Types ‘Type 6 Ta) Cylinders casted by RGF Technician, Cylinder casted and delivered to Lab. By client representative REMARKS: Any defect in specimen or in capping: No Defect INote: Result is related tothe sample tested. The Lab. is responsible forall information inthe report > ; cept the information provided by client Hag Nawaz, rested By, BFOUNDATH ge — Sheet 1/1 appnovin sine End of Report Conia oT Ts ce OT ROE Tay nl OUT 5 ‘ry-concon.ourn) iy Gotenique and Foution Co{RGP Pe 01125 ‘ulin 6964, King Sen Ron, Sana Ava, Baryéah AMQasin | RIVADH GEOTECHINIQUE & FOUNDATIONS CO. Gg Fem. BE ee TEST REPORT CONCRETE COMPRESSION TEST (ASTM GCM 21 CLIENT : Intelligent System General Contracting Co, Aaa) ental eth tN 52 PROJECT: ‘SVC 380/115 Ky BSP - Qaisumah ‘Test Method : As Above Test performed Location : Physical Laboratory Buraydah STRUCTURE: HY. Pedestals, Control Building Trech, ‘Transformer - 2 Pads Columns & Pedestals (QP/0121/23 1-Feb-2023 }8_ Cement : 440+MS (kg/eum) Type of Cement:_SRC_ Supplier : AL Eemar Readymix T-Feb-2023, 8-Feb-2023, AGE: 7 Days TEST DURATION: 4 _ Minutes 23.4 numirry: 43% DIAMETER/BREADTH: __150.0_mm, LENGTH: _300.0_mm, — CROSSSEC.AREA:_1767L5__mm* ‘SAMPLE | WEIGHT | UNIT WEIG MAX comp.) AVE. COMP. ‘YPE OF No. LOAD | STRENGTH | STRENGTH FRACTURES (ems) (kg/CM), (kN) MPa. MPa, LA 12368 2.333 5578 31.6 ‘Type- 3 TH] Cylinders casted by RGF Technician. Cylinder casted and delivered to Lab. By client representative REMARKS: Any defect in specimen or in capping : No Defect |Note: Result is related to the sample tested. The Lab. is responsible forall information inthe report, Except the information provided by client Sultan ul Mull Tested By Sheets 1/1 oprah oF as ean oy ROP W may St be apo ‘orv-conc.on.ourt Rach Gesesiqe and Fondaon Co(RGR, Be 0 as Bulg 626, King Salman Rod, Sana As, raya Asin Intelligent System General Contracting Co. CEE He 2 PN RIYADH GEOTECHNIQUE & FOUNDATIONS CO. (ASTM C39/C39M-21) La yaw AGS Lab Ref Ne (QyP/0121/23 PROJECT: SVC 380/115 Kv BS! P = Qaisumalh Date: _1-Feb-2023, Test Method : As Above ‘Test performed Locatio hysical Laboratory Buraydah “Test Request N ‘Sample Test Ref. : STRUCTURE: H.V. Pedestals, “Transformer - 2 Pads ‘Control Building Trench, ‘Columns & Pedestals DESIGN STRENGTH:__C- 38 Cement: 4404MS (kg/eusm) Type of Cement: _SRC_ Supplier : AL Bear Readymix CASTING DATE: 1023 TESTING DATE:__I-Mar-2023 AGE: 28 Days ST DURATION: 10 _ Minutes ROOM TEMP.: 230°C numprty: 41% DIAMETER/BREADTH: _150.0_mm, LENGTH: _300.0_mm, CROSS SEC. ARWA:_1767L.5_mm" ‘SAMPLE ] WEIGHT | UNIT WEIGHT | MAX ‘COMP. ‘AVE. COMP. TYPE OF No. LOAD | STRENGTH | STRENGTH FRACTURES, (a) (kg/CM), kN) MPa. MPa. Lc 12st 2.360 699.8 39.6 Type- 3 1-D 12486 2.355 705.1 39.9 Type- 2 LE 12523 2362 254 410 Type- 2 40.2 Note: Result is related to the sample tested. The Lab, is responsible forall informa Typed Types ‘Types Tal Ghlinders casted by ROF Technician, () Cylinder casted and delivered to Lab. By client representative REMARKS: Any defect in specimen or in capping!” NoDefeet ation inthe report Excep the information provided by client eth 2 AM RIVADH GEOTK 2 FOUNDATIONS APPROYEU REPORT Checked/Reviewed By ith Gevtecaigu and Fomton Co(RO) Buin 656, King Salon Rod, Sana Arn, erayésh ALQas

You might also like