Penawaran PT Ethanol Indonesia Industri by CV Trijaya

This document is a bill of quantity from CV Tri Jaya for fabrication work. It contains specifications and costs for fabricating various pieces of equipment including air hoods, pipes, valves, supports, and other items. The total cost for all items and installation is IDR 516,620,375. It was generated on 7-Dec-22 for a customer.

Uploaded by

Trengginas Bima
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Penawaran PT Ethanol Indonesia Industri by CV Trijaya

This document is a bill of quantity from CV Tri Jaya for fabrication work. It contains specifications and costs for fabricating various pieces of equipment including air hoods, pipes, valves, supports, and other items. The total cost for all items and installation is IDR 516,620,375. It was generated on 7-Dec-22 for a customer.

Uploaded by

Trengginas Bima
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Tri Jaya BILL OF QUANTITY

FABRIKASI MEKANIKAL INDUSTRI 7-Dec-22

Jl. Raya Sidorejo 69 Krian Sidoarjo Telp. 081 357877600


e-mail : [email protected] NO : QUO-2206-033

NO DESCRIPTION QTY UNIT UNIT PRICE INSTALATION PRICE TOTAL (IDR)

Pekerjaan Pembuatan Air Hood


Air hood
Ukuran : 3000x1700x1000mm, dia. 340mm,
Tebal : 2mm carbon steel
Air Hood 476 2 pcs IDR 12,090,000 IDR 24,180,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Air hood

Ukuran : 4000x600x1500mm

Tebal : 2mm carbon steel


Air Hood 340 2 pcs IDR 22,971,000 IDR 45,942,000
Flange : 5mm carbon steel

Pembuatan By CV Tri Jaya

Pekerjaan Pembuatan Support Air Hood & Pipa


Air Pipe, Square (340x340mm) to round (dia.340mm),
Tebal : 2mm carbon steel
Air Hood 340 Support 4 Meter IDR 2,170,000 IDR 8,680,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Air Pipe, dia. 340mm,
Tebal : 2mm carbon steel
Pipa DN 340 15 Pcs IDR 1,054,000 IDR 15,810,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Air Pipe, dia. 530mm
Tebal : 2mm carbon steel
Pipa DN 530 30 Meter IDR 1,782,500 IDR 53,475,000
Flange 5mm carbon steel
Pembuatan By CV Tri Jaya
Air Pipe, dia. 480mm
Tebal : 2mm carbon steel
Pipa DN 480 2 Meter IDR 1,751,500 IDR 3,503,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Silencer and hood,dia.600mm
Silincer Dn 600 Bahan : Mild steel/Baja Lunak 2 pcs IDR 25,296,000 IDR 50,592,000
Pembuatan by CV Tri Jaya

Pekerjaan Pembuatan Pipa two Way


Pipe two-way, dia. 480mm and dia. 340mm,Deg:30°
Tebal : 2mm carbon steel pcs
Pipa Two Way 480 1 IDR 3,255,000 IDR 3,255,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Pipe two-way, dia. 530mm,480mm,340mm, Deg:30°
Tebal : 2mm carbon steel
Pipa Two Way 530 - 1 1 set IDR 3,828,500 IDR 3,828,500
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Pipe two-way, dia. 530mm and dia. 340mm, Deg:30°
Tebal : 2mm carbon steel
Pipa Two Way - 2 1 pcs IDR 3,596,000 IDR 3,596,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Pipe elbow, dia. 340mm, Deg:60°
Tebal : 2mm carbon steel
Pipa Elbow 340 -1 4 pcs IDR 1,116,000 IDR 4,464,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Pipe elbow, dia. 340mm, Deg:90°
Tebal : 2mm carbon steel
Pipa Elbow 340 - 2 3 pcs IDR 1,674,000 IDR 5,022,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Pipe elbow, dia. 530mm, Deg:90°
Tebal : 2mm carbon steel
Pipa Elbow 530 7 set IDR 2,867,500 IDR 20,072,500
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya

Pekerjaan Pembuatan Valve


Air butterfly valve, dia.340mm
Tebal : 2mm carbon steel
Valve - 1 5 pcs IDR 930,000 IDR 4,650,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya
Air butterfly valve, dia.530mm
Tebal : 2mm carbon steel
Valve - 2 2 pcs IDR 1,255,500 IDR 2,511,000
Flange : 5mm carbon steel
Pembuatan By CV Tri Jaya

Pekerjaan Pembuatan Support Pipa dan Dust Collector


Support Pipa 8 Pcs IDR 4,000,000 IDR 32,000,000
Support Dust Collector 2 Pcs IDR 13,000,000 IDR 26,000,000
Jasa Install total & Mobilitas 1 Set IDR 160,000,000 IDR 160,000,000
Biaya Pembuatan Panel 1 Set IDR 47,039,375 IDR 47,039,375
Biaya Sewa Tempat Tinggal 1 Bulan IDR 2,000,000 IDR 2,000,000

TOTAL IDR 516,620,375