SLEEVES

The document discusses plans for a new 400kV overhead transmission line from Al Wathba substation to Shahama East substation. It will be approximately 273,554.30 meters long and pass through rural land and existing 220kV lines. The project involves building new transmission towers along the route and connecting the two substations to strengthen the electricity network.

Uploaded by

Muhammad hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

SLEEVES

The document discusses plans for a new 400kV overhead transmission line from Al Wathba substation to Shahama East substation. It will be approximately 273,554.30 meters long and pass through rural land and existing 220kV lines. The project involves building new transmission towers along the route and connecting the two substations to strengthen the electricity network.

Uploaded by

Muhammad hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

N

T
No ABOU
D
:3
N

UN
RO

AMA EAST
ELA PS
WE

SW - SHAH
SAFAH - TA
N
HA
IE

ROAD

TL AL AIN
SW

OHTLMUS
TO

FUTURE

400kV OH
EXISTING 220kV D/C OHL AL WATHBA - SHAHAMA EAST

400kV
EXISTING

EXISTING
E= 273554.30
N=2701568.88

N=2701567.84
E=273704.30
LOCATION OF SHAMKHA
SUBSTATION
LINE REACTOR
COMP. (FUT.)

REACTOR COMP.

CO2 ROOM
33kV
SWG
FIRE FIRE
TANWAT ROOPUM

R.
K ER M P

FUEL TANK
OUTDOOR

N=2701317.84
E=273702.57
400kV SWITCHGEAR ROOM
ICT COMPOUND AREA
132kV SWITCHGEAR ROOM
120MVA TR. COMPOUND

CO2 ROOM
33kV
REACTOR COMP.

SWG
TRANSCO ENTRANCE

R.
ADDC ENTRANCE

STAIRS
33kV
. SWG
R./C

400/
COVERED CAR PARKING AREA
ONT

132k
ROL

V CON
BUIL

AUX. TR.

WAY
SOAK
COMP.

TRO
DING

L BUIL
DING
ADDC ENTRANCE
AUX. TR.

WAY
SOAK
COMP.
AREA
CAR PARKING
COVERED

TRANSCO ENTRANCE
E= 273552.57
KEYPLAN: N=2701318.89

NOTES:

LEGEND

REFERENCE DRAWINGS:

FFL
+1.20 M (+36.40 NADD)
PAVEMENT
+0.25 M (+35.45 NADD)
ROAD
GRAVEL +0.10 M (+35.30 NADD)
FGL +0.05 M (+35.25 NADD)
±0.00 M (+35.20 NADD)

SUBSTATION TYPICAL LEVEL DETAILS

A 03/07/2023 ISSUED FOR APPROVAL AMA AMA MSK

REV DATE DESCRIPTION PREPARED CHECKED APPROVED

OWNER :

CONSULTANT :
CONSULTING ENGINEERS
D - 61118 BAD VILBEL

CONTRACTOR :
NATIONAL CONTRACTING CO. LTD.
TRANSMISSION AND DISTRIBUTION DIVISION
P.O.BOX 40327, ABU DHABI U.A.E
PHONE : 02 6421700 FAX : 02 6421701
PROJECT :
DRAWING CHECKED & COORDINATED FOR ADDITIONAL THREE (3) TRANSFORMERS 132/33KV,100MVA
AND RELATED SUBSTATION WORKS AT SHAMKHA
CONTRACTOR: ENGINEER: 400/132/33KV GRID STATION
TITLE :

By :........................................... By :...........................................
Name :........................................... Senthilkumar THAMBU
Name : ..........................................
Date :........................................... 22.05.2023
Date :........................................... SHEET
PREPARED BY CHECKED BY APPROVED BY DATE SHEET NO
SIZE SCALE
GOPA - International Energy Consultants GmbH
AS
Abu Dhabi AMA AMA MSK 03/07/2023 A1 SHOWN 1 OF 3
Global Ascent Business Centre,
Mussafah Sector M4 (SEHA / Emirates ID Building, CSD No. REV.
Block 2 and Block 4)
Abu Dhabi, United Arab Emirates
Tel +971 2 5550013 Fax +971 2 5550017 A
N

T
No ABOU
D
:3
N

UN
RO

AMA EAST
ELA PS
WE

SW - SHAH
SAFAH - TA
N
HA
IE

ROAD

TL AL AIN
SW

OHTLMUS
TO

FUTURE

400kV OH
EXISTING 220kV D/C OHL AL WATHBA - SHAHAMA EAST

400kV
EXISTING

EXISTING
E= 273554.30
N=2701568.88

N=2701567.84
E=273704.30
LOCATION OF SHAMKHA
SUBSTATION
LINE REACTOR
COMP. (FUT.)

REACTOR COMP.

CO2 ROOM
33kV
SWG
FIRE FIRE
TANWAT ROOPUM

R.
K ER M P

FUEL TANK
OUTDOOR

N=2701317.84
E=273702.57
400kV SWITCHGEAR ROOM
ICT COMPOUND AREA
132kV SWITCHGEAR ROOM
120MVA TR. COMPOUND

CO2 ROOM
33kV
REACTOR COMP.

SWG
TRANSCO ENTRANCE

R.
ADDC ENTRANCE

STAIRS
33kV
. SWG
R./C

400/
COVERED CAR PARKING AREA
ONT

132k
ROL

V CON
BUIL

AUX. TR.

WAY
SOAK
COMP.

TRO
DING

L BUIL
DING
ADDC ENTRANCE
AUX. TR.

WAY
SOAK
COMP.
AREA
CAR PARKING
COVERED

TRANSCO ENTRANCE
E= 273552.57
KEYPLAN: N=2701318.89

NOTES:

LEGEND

REFERENCE DRAWINGS:

FFL
+1.20 M (+36.40 NADD)
PAVEMENT
+0.25 M (+35.45 NADD)
ROAD
GRAVEL +0.10 M (+35.30 NADD)
FGL +0.05 M (+35.25 NADD)
±0.00 M (+35.20 NADD)

SUBSTATION TYPICAL LEVEL DETAILS

A 03/07/2023 ISSUED FOR APPROVAL AMA AMA MSK

REV DATE DESCRIPTION PREPARED CHECKED APPROVED

OWNER :

CONSULTANT :
CONSULTING ENGINEERS
D - 61118 BAD VILBEL

CONTRACTOR :
NATIONAL CONTRACTING CO. LTD.
TRANSMISSION AND DISTRIBUTION DIVISION
P.O.BOX 40327, ABU DHABI U.A.E
PHONE : 02 6421700 FAX : 02 6421701
PROJECT :
DRAWING CHECKED & COORDINATED FOR ADDITIONAL THREE (3) TRANSFORMERS 132/33KV,100MVA
AND RELATED SUBSTATION WORKS AT SHAMKHA
CONTRACTOR: ENGINEER: 400/132/33KV GRID STATION
TITLE :

By :........................................... By :...........................................
Name :........................................... Senthilkumar THAMBU
Name : ..........................................
Date :........................................... 22.05.2023
Date :........................................... SHEET
PREPARED BY CHECKED BY APPROVED BY DATE SHEET NO
SIZE SCALE
GOPA - International Energy Consultants GmbH
AS
Abu Dhabi AMA AMA MSK 03/07/2023 A1 SHOWN 2 OF 3
Global Ascent Business Centre,
Mussafah Sector M4 (SEHA / Emirates ID Building, CSD No. REV.
Block 2 and Block 4)
Abu Dhabi, United Arab Emirates
Tel +971 2 5550013 Fax +971 2 5550017 A
N

T
No ABOU
D
:3
N

UN
RO

AMA EAST
ELA PS
WE

SW - SHAH
SAFAH - TA
N
HA
IE

ROAD

TL AL AIN
SW

OHTLMUS
TO

FUTURE

400kV OH
EXISTING 220kV D/C OHL AL WATHBA - SHAHAMA EAST

400kV
EXISTING

EXISTING
E= 273554.30
N=2701568.88

N=2701567.84
E=273704.30
LOCATION OF SHAMKHA
SUBSTATION
LINE REACTOR
COMP. (FUT.)

REACTOR COMP.

CO2 ROOM
33kV
SWG
FIRE FIRE
TANWAT ROOPUM

R.
K ER M P

FUEL TANK
OUTDOOR

N=2701317.84
E=273702.57
400kV SWITCHGEAR ROOM
ICT COMPOUND AREA
132kV SWITCHGEAR ROOM
120MVA TR. COMPOUND

CO2 ROOM
33kV
REACTOR COMP.

SWG
TRANSCO ENTRANCE

R.
ADDC ENTRANCE

STAIRS
33kV
. SWG
R./C

400/
COVERED CAR PARKING AREA
ONT

132k
ROL

V CON
BUIL

AUX. TR.

WAY
SOAK
COMP.

TRO
DING

L BUIL
DING
ADDC ENTRANCE
AUX. TR.

WAY
SOAK
COMP.
AREA
CAR PARKING
COVERED

TRANSCO ENTRANCE
E= 273552.57
KEYPLAN: N=2701318.89

NOTES:

LEGEND

REFERENCE DRAWINGS:

FFL
+1.20 M (+36.40 NADD)
PAVEMENT
+0.25 M (+35.45 NADD)
ROAD
GRAVEL +0.10 M (+35.30 NADD)
FGL +0.05 M (+35.25 NADD)
±0.00 M (+35.20 NADD)

SUBSTATION TYPICAL LEVEL DETAILS

A 03/07/2023 ISSUED FOR APPROVAL AMA AMA MSK

REV DATE DESCRIPTION PREPARED CHECKED APPROVED

OWNER :

CONSULTANT :
CONSULTING ENGINEERS
D - 61118 BAD VILBEL

CONTRACTOR :
NATIONAL CONTRACTING CO. LTD.
TRANSMISSION AND DISTRIBUTION DIVISION
P.O.BOX 40327, ABU DHABI U.A.E
PHONE : 02 6421700 FAX : 02 6421701
PROJECT :
DRAWING CHECKED & COORDINATED FOR ADDITIONAL THREE (3) TRANSFORMERS 132/33KV,100MVA
AND RELATED SUBSTATION WORKS AT SHAMKHA
CONTRACTOR: ENGINEER: 400/132/33KV GRID STATION
TITLE :

By :........................................... By :...........................................
Name :........................................... Senthilkumar THAMBU
Name : ..........................................
Date :........................................... 22.05.2023
Date :........................................... SHEET
PREPARED BY CHECKED BY APPROVED BY DATE SHEET NO
SIZE SCALE
GOPA - International Energy Consultants GmbH
AS
Abu Dhabi AMA AMA MSK 03/07/2023 A1 SHOWN 3 OF 3
Global Ascent Business Centre,
Mussafah Sector M4 (SEHA / Emirates ID Building, CSD No. REV.
Block 2 and Block 4)
Abu Dhabi, United Arab Emirates
Tel +971 2 5550013 Fax +971 2 5550017 A

You might also like