Engg Change Note
Engg Change Note
SGM/DEV/F/06
SUYESH GROUP Issue No./Date 01/01.08.2014
Rev. No./Date 00/01.08.2014
ENGINEERING CHANGE NOTE
Page 01 or 01
INTERNAL / EXTERNAL
.
12. Feasibility Review:
.
.
A) CHANGE IN DOCUMENTS:
Sr. Documents to Brief details of changes to be made Responsibility & Follow-up details
No. be changed target date.
01 Drawings
02 Control plans
03 Work
instructions
04 Process
FMEA
05 PPAP
Rec. Ref. SGM/DEV/F/06
SUYESH GROUP Issue No./Date 01/01.08.2014
Rev. No./Date 00/01.08.2014
ENGINEERING CHANGE NOTE
Page 01 or 01
INTERNAL / EXTERNAL
B) CHANGE IN TOOLING.
Sr. Tooling to be Brief details of changes to be made Responsibility & Follow-up details
No. changed target date.
01
02
03
04
05
C) CHANGE IN INSPECTION GAUGES/FIXTURE
Sr. Gauge / Brief details of changes to be made Responsibility & Follow-up details
No. fixture to be target date.
changed
01
02
03
a) Is Process Validation Required – Yes / No, If Yes – Has is done – Yes or No.
Any Comments-
b) Is PPAP to be submitted to Customer – Yes / No , If Yes by When & Is Submitted & Approval
Obtained?
Comments-
Sign
Dept. Customer
Engg. Mkt. Q.A. Tooling Supplier
Representative