GTI RoutineTests 1HC0007010ADEn
GTI RoutineTests 1HC0007010ADEn
Content
1. Introduction
11. Tests on SF6-air bushings They are documented in internal ABB testing instruction
manuals. The sequence of testing is set as reasonable and
12. Tests on surge arresters metal oxide type (MO) convenient, if not clearly specified by the standards.
14. References
Note: 3. Dielectric tests on auxiliary and control circuits
Where required, also IEEE C 37.122 [3] is met by the routine This test is made in accordance with IEC 62271-1 clause 7.2.
tests described here. However, for pressure tests on enclo-
sures and for production tests on circuit-breakers (ANSI/ 2 000 V, 50 Hz is applied for 1 min between the auxiliary and
IEEE C37.09) some deviations may have to be taken into control circuits connected together as a whole and the base
account. For current transformers, when testing according to of the switching device.
IEEE C 37.122, the additional test as per ANSI C 57.13.5 has
to be considered. This test is combined, where convenient, with mechanical
operation tests on drives (clause 7) and with tests of auxiliary
The routine tests serve the purpose of revealing faults in electrical and hydraulic devices (clause 8) in the ABB factory
material, construction or manufacturing tolerances. They (e.g. on control cubicles, if these are integrated in basic bays)
ensure that the product is in accordance with the equipment or at the subcontractor’s works.
on which the type tests have been carried out. They do not
impair the properties and reliability of the test object.
4. Measurement of the resistance of the main circuits
The routine tests are made on each apparatus or on each This test is made in accordance with IEC 62271-1 clause 7.3.
transport unit at the ABB works.
Resistance measurements are performed on all the bus con-
necting joints and on circuit-breaker, disconnector and earth-
2. Power-frequency voltage tests on the main circuit, ing switch contacts so as to verify proper contact alignment.
including partial discharge measurement The resistance is measured with a direct current of 300 A.
These tests are in accordance with IEC 62271-1 [1] clause 7,
IEC 62271-203 [2] clause 7, IEC 60060-1 [12] and Tests are made at ambient temperature on transport units.
IEC 60060-2 [13]. These tests are a reference for progressive testing in the field.
The output of the calibration is a calibration protocol and a Current sharing check on MO-columns applicable only for
calibration file, which is downloaded to the current/voltage multi-column arresters.
transformer and kept in database at ABB. At the end of the
current/voltage calibration, a factory acceptance test (FAT) Routine tests performed on each complete arrester unit:
is performed. The output of the FAT is a validation protocol – Gas tightness test of housing (as per clause 6)
which is kept in a database at ABB. – Measurement of the operating current at maximum continu-
ous operating voltage (MCOV)
– Measurement of the reference voltage at specified current
– Partial discharge measurement at 1.05 x MCOV
1)
Internal test reports are shown on request
7.1 Bei Gasdruck / at gas pressure 0 kPa 0.5 % pro Jahr / per annum g 0 Not tested Not tested Not tested
8. Widerstände / Resistances
8.1 EIN – Magnetventil 1 / CLOSE solenoid valve 1 0 ± 10% 0.0 0.0 0.0
8.2 AUS – Magnetventil 1 / OPEN solenoid valve 1 0 ± 10% 0.0 0.0 0.0
8.3 AUS – Magnetventil 2 / OPEN solenoid valve 2 0 ± 10% 0.0 0.0 0.0
8.4 Heizung / Heater 0 ± 10% 0.0 0.0 0.0
Q
1. Strompfad
current path
E P Z-P µΩ ≤ _______ _______ _______
Q
2. Strompfad
current path E P Z-P µΩ ≤ _______ _______ _______
Q
3. Strompfad Z-E µΩ
current path
E P ≤ _______ _______ _______
4. Strompfad Q
current path E P Z-Q µΩ ≤ _______ _______ _______
Q
5. Strompfad
current path
E P Z-Q µΩ ≤ _______ _______ _______
Einheit Sollwert
Unit Nom.Val.
6. Spannungsprüfung Koax /
3. Spannungsprüfung Koaxialstecker
DC 60s kV 2.8
Voltage test coaxial plug
4. Heizungsprüfung
A 0.0 - 0.0 0.00 - -
Heating test
Motor / Drive
Erder Ein / Earthing switch close
5. Max. Motorstrom / Maximum motor current bei 1.00 x <default> A < 0.0 0.00 - -
6. Motorlaufzeit / Motor operating time at s < 0.0 0.00 - -
Typ Trennschalter Antrieb / Disconnector drive Typ: <default> Bestellung: <default> Projektleiter: <default>
Order: Project manager:
Nennspannung / Nominal Voltage Un <default> kV
Nennstrom / Nominal current In <default> A Anlage:
Nennfrequenz / Nominal frequency fn <default>Hz <default>
Installation:
Fülldruck SF6 - Gas bei 20°C ME / AU pre <default> kPa
Besteller: <default>
Filling press. SF6 - Gas at 20°C LS/ CB pre <default> kPa Purchaser:
2. Spannungsprüfung Verdrahtung
Voltage test wiring DC 60s kV 2.8
3. Heizungsprüfung
Heating test A 0.0 - 0.0 0.00
Antrieb / Drive
Trenner Ein / Disconnector clos
4. Motorstrom / Motor current bei A < 0.0 0.00
1.00 x <default> V 0.00
5. Max. Motorstrom / Maximum motor current at A < 0.0
7. Motorlaufzeit / Motor operating time s 1.6 - 2.2 0.00
Total 70
Kombinierter Trenn- / Erdungsschalter Antrieb Typ: <default> Bestellung: <default> Projektleiter: <default>
Combined disconnector / earthing switch drive Order: Project manager:
Nennspannung / Nominal Voltage Un <default>kV Anlage:
Nennstrom / Nominal current In <default> A <default>
Installation:
Nennfrequenz / Nominal frequency fn Hz
<default>
2. Spannungsprüfung Verdrahtung
Voltage test wiring DC 60s kV 2.8
3. Heizungsprüfung
Heating test A 0.0 - 0.0 0.00
Antrieb / Drive
Trenner Ein / Disconnector close
4. Motorstrom / Motor current bei A < 0.0 0.00
1.00 x <default> V
5. Max. Motorstrom / Maximum motor current at A < 0.0 0.00
7. Motorlaufzeit / Motor operating time s 1.6 - 2.2 0.00
Erdungsschalter Antrieb / Earthing switch drive Typ: Bestellung: <default> Projektleiter: <default>
Order: Project manager:
Nennspannung / Nominal Voltage Un <default>kV
Nennstrom / Nominal current In <default> A
Anlage: <default>
Nennfrequenz / Nominal frequency fn Hz
<default>
Installation:
Fülldruck SF6 - Gas bei 20°C ME / AU pre <default> kPa
Besteller: <default>
Filling press. SF6 - Gas at 20°C LS/ CB pre <default> kPa Purchaser:
2. Spannungsprüfung Verdrahtung
Voltage test wiring DC 60s kV 2.8
3. Heizungsprüfung
Heating test A 0.0 - 0.0 0.00
Antrieb / Drive
Erder Ein / Earthing switch close
11. Motorstrom / Motor current A < 0.0 0.00
1.00 x <default> V
12. Max. Motorstrom / Maximum motor current A < 0.0 0.00
13. Motorlaufzeit / Motor operating time s 1.6 - 2.2 0.00
Total 70