No Check points
Entrance Corridor Door - 1.2 meter
Door Other Internal Door - 1 meter
S.No Floor Location
1 Basement Entire
Floor
2 Ground Floor North
6 1M North
7 East
1M
8 1M South
9 West
1M
Entire
10
1M Floor
2M North
2M East
2M South
2M West
Second Floor Entire
Floor
Second Floor
Second Floor
3M
Third Floor
4M
Fourth Floor
5M
Terrace
Observations
Emergency lights are not provided
Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 2: Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 3: Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 1: Installation of Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Installation of Hose box and Hose reel Drum are pending
Point 1: Installation of Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Installation of Hose box and Hose reel Drum are pending
Point 1: Installation of Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Installation of Hose box and Hose reel Drum are pending
Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 2: Installation of Hydrant point Hose box and Hose reel Drum are pending
Point 3: Installation of Hydrant point Hose box and Hose reel Drum are pending
Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 1: Installation of Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Installation of Hose box and Hose reel Drum are pending
Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 1: Installation of Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Connection of Hose box and Hose reel Drum are pending
Installation of Hydrant point, Hose box and Hose reel Drum are pending
Distance between two Smoke detector are placed in 8 mtr and 8.5 mtr
Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 2: Installation of Hose box and Hose reel Drum are pending
Point 3: Installation of Hose box and Hose reel Drum are pending
Distance between two Smoke detector are not matching the compliance.
In 2.4 mtr height area, Mobile rack provided are having no ceiling clearance.
In 7 mtr height area, Mobile rack provided are meets the ceiling limit clearance.
Distance between wall and smoke detector 4.85 mtr provided, not matching the
compliance
Installation of Hydrant point, Hose box and Hose reel Drum are pending