0% found this document useful (0 votes)
30 views

Checklist

The document describes fire safety checks performed at a building. It notes non-compliant distances between smoke detectors and issues with incomplete installation of fire equipment. Key points include pending installation of hydrant points, hose boxes, and hose reel drums at multiple locations. Emergency lights and doors are also required along with signage and call points. Distances between smoke detectors and mobile racks near ceilings require attention to meet compliance.

Uploaded by

Arul Prasaad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Checklist

The document describes fire safety checks performed at a building. It notes non-compliant distances between smoke detectors and issues with incomplete installation of fire equipment. Key points include pending installation of hydrant points, hose boxes, and hose reel drums at multiple locations. Emergency lights and doors are also required along with signage and call points. Distances between smoke detectors and mobile racks near ceilings require attention to meet compliance.

Uploaded by

Arul Prasaad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

S.

No Check points
Entrance Corridor Door - 1.2 meter
Door Other Internal Door - 1 meter
S.No Floor Location

1 Basement Entire
Floor
2 Ground Floor North

3 Ground Floor East

4 Ground Floor South

5 Ground Floor West

6 1M North

7 East

1M
8 1M South

9 West

1M
Entire
10
1M Floor

First Floor North


First Floor East

First Floor South

First Floor West

2M North

2M East

2M South

2M West
Second Floor Entire
Floor

Second Floor North

Second Floor
Second Floor

3M
Third Floor
4M
Fourth Floor
5M
Terrace
Observations
Emergency lights are not provided

Installation of Hose box and Hose reel Drum are pending

Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 2: Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 3: Installation of Hydrant point, Hose box and Hose reel Drum are pending

Hydrant Point installation pending


connection of Hose reel Drum and hose box are pending

Point 1: Installation of Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Installation of Hose box and Hose reel Drum are pending

Installation of Hose box and Hose reel Drum are pending

Point 1: Installation of Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Installation of Hose box and Hose reel Drum are pending

Installation of Hose box and Hose reel Drum are pending

Point 1: Installation of Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Installation of Hose box and Hose reel Drum are pending

Sprinkler Installation Progress

Installation of Hydrant point, Hose box and Hose reel Drum are pending
Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 2: Installation of Hydrant point Hose box and Hose reel Drum are pending

Point 3: Installation of Hydrant point Hose box and Hose reel Drum are pending

Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 1: Installation of Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Installation of Hose box and Hose reel Drum are pending

Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 1: Installation of Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Connection of Hose box and Hose reel Drum are pending

Installation of Hydrant point, Hose box and Hose reel Drum are pending

Distance between two Smoke detector are placed in 8 mtr and 8.5 mtr

Smoke detector are installed in congested area

Point 1: Installation of Hydrant point, Hose box and Hose reel Drum are pending

Point 2: Installation of Hose box and Hose reel Drum are pending

Point 3: Installation of Hose box and Hose reel Drum are pending
Distance between two Smoke detector are not matching the compliance.

In 2.4 mtr height area, Mobile rack provided are having no ceiling clearance.

Sprinkler system installation pending

Emergency doors shall be provided

In 7 mtr height area, Mobile rack provided are meets the ceiling limit clearance.

Sign Indicators should be provided

Manual call point should be provided

In Sampling and Dispensing area, incase of sprinkler system provided, it should be


equippoed with automodular fire extinguisher.

Emergency doors shall be provided at each staircase.

Fire sprinklers shall be provided

Distance between wall and smoke detector 4.85 mtr provided, not matching the
compliance

Installation of Hydrant point, Hose box and Hose reel Drum are pending

Sign Ijndicators should be provided