Baseline Processing Report - Imam
Baseline Processing Report - Imam
Comment 1:
Comment 2:
Comment 3:
Processing Summary
Observation From To Solution H. Prec. V. Prec. Geodetic Ellipsoid ΔHeight
Type (Meter) (Meter) Az. Dist. (Meter)
(Meter)
GPK.BM.08 --- GPK.BM.08 BMW.27 Fixed 0.0054 0.0070 180°30'01. 1285.3473 5.6141
BMW.27 (B1) 6"
GPK.BM.08 --- GPK.BM.08 BMW.28 Fixed 0.0023 0.0048 180°06'54. 1255.5793 5.0398
BMW.28 (B2) 0"
Acceptance Summary
Processed Passed Flag Fail
2 2 0 0
1
GPK.BM.08 - BMW.27 (12:34:27 PM-1:31:22 PM) (S1)
Baseline observation: GPK.BM.08 --- BMW.27 (B1)
RMS: 0.0112 m
To: BMW.27
Vector
Standard Errors
Vector errors:
2
Aposteriori Covariance Matrix (Meter²)
X Y Z
X 0.0000037565
Y -0.0000022381 0.0000128874
Occupations
From To
3
Tracking Summary
4
Residuals
5
6
7
8
9
Processing style
Elevation mask: 25°00'00.0"
Continuous vectors: No
Force float: No
Acceptance Criteria
10
GPK.BM.08 - BMW.28 (1:38:17 PM-2:35:22 PM) (S2)
Baseline observation: GPK.BM.08 --- BMW.28 (B2)
RMS: 0.0096 m
To: BMW.28
Vector
Standard Errors
Vector errors:
11
Aposteriori Covariance Matrix (Meter²)
X Y Z
X 0.0000021222
Y -0.0000022394 0.0000048293
Occupations
From To
12
Tracking Summary
13
14
Residuals
15
16
17
18
19
20
21
22
23
Processing style
Elevation mask: 25°00'00.0"
Continuous vectors: No
Force float: No
Acceptance Criteria
24