FORM B-2
OMD" BvZ
GUJARAT STATE ROADS & BUILDING DEPARTMENT
U]HZFT ZFHI DFU¶ VG[ DSFG lJEFU
ITEM RATE TENDER AND CONTRACT FOR WORKS
SFDM DF8[G]\ AFAT NZJF/] 8[g0Z VG[ SMg8=FS8
SFDG]\ GFDo Sg:8=SXG JS" VMO gI] S|M; 0=[.G[H4 ZL5[ZL\U VMO S|M; 0=[.G[H4 :8=SRZ
V[g0 lA|H ZL5[Z JS" V[g0 VWZ lD;P JS" VMG J[ZLI; ZM0 V[; V[g0
JC[G ZLSJF0" VMZ .G .DZHg;L Vg0Z l0:8=PsVFZ V[g0 ALf 0LJLhG4
ZFHSM8 s+LHM 5|ItGf
SFI"5F,S .HG[Z
lH<,F DFU" VG[ DSFG lJEFU4
ZFHSM8
-2-
MEMORANDUM OF WORKS IN BRIEF
SZJFGF SFDGL 8]SDF\ IFNL
1) Name of work SFDG]\ GFD Construction Work of New Cross Drainage,
Repairing of Cross Drainage, Structure & Bridge
Repair work & other Misc. work on Various Road as
and when required or in Emergency under Dist.
(R&B) Division Rajkot (3rd Try)
2) Estimated Cost - V\NFHL lS\DT Rs. 24,23,01,013.88
4) Validity period of tender offered (120) days from the date of opening of
Technical Bid but no modification shall be
allowed after down loading of tender.
VMOZ S[8,F lNJ; B]<,L ZC[X[P 8[g0Z GF AL0 s!Z_f lNJ;M ;]WL4 .v8[g0ZL\U
GF 8[SGLS, AL0 BM<IF TFZLB YL sJ[,L0L8L
;DI 5]ZM YFI tIF\ ;]WLf SM. O[ZOFZ SZL XSFX[
GCLP
5) Security Deposite- HFDLGULZL VGFDT
(i) In the form of small savings or Narmada Rs. 7269100.00
Bonds. (or minimum one year time limit.)
s!f GFGL ART ~5[ VYJF GD"NF lGUDGL AF\WL
D]NTGL YF56 :J~5[ sVMKFDF\ VMKL V[S JQF"GL
D]NT JF/Lf(3.0% of Est. Cost.)
(ii) To deducted from bills (2.5% of Est. Cost.) Rs. 6057600.00
Zf RF,] AL,MDF\YL SZJFGL S5FT
(iii) Performance bond of Schedule Bank
#f VG];]lRT A[gSG]\ AFC[WZL 5+ (5% of Est. Rs. -
Cost put to Tender.)
Total V\[S\NZ[ Rs. 13326700.00
BANK GUARANTEE
Bank Address
-9-
5. The contractor shall have to furnish Income Tax Clearance Certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
5P 5MTFG]\ 8[g0Z :JLSFZFI T[ 5C[,F SMg8=S8Z[ VFJSJ[ZF[ R]ST[ SIF"G]\ 5|DF65+ ZH] SZJ]\ 50X[ VG[ VFSFZ6L G\AZ VG[ H[ C[9/
VFSFZ6L SZF. CMI T[ JF[0" V\U[GL HF6 SZJFGL ZC[X[P
6. Copies of certificate as regards previous experience , if any, must accompany the tender.
&P VUFpGM SM. VG]EJ CMI TM T[ V\U[GF 5|DF65+GL GS,M 8[g0ZM ;FY[ ZH] SZJFGL ZC[X[P
7. Declaration showing all works on hand with the Contractor and the value of works that remains to
be executed in each case must accompany the tender.
*P NZ[S S[;DF\ SMg8=S8ZGF CFY 5ZGF AWF SFD VG[ SZJFGF AFSL CMI T[JF SFDGF D]<I V\U[GM V[SZFZ 8[g0Z ;FY[ SZJFGM ZC[X[P
8. All pages of Schedule ‘A’ and ‘B’ and specifications should be initialed by the Contractor.
(P VG];]lR cSc VG[ cBc GF TDFD 5FGF VG[ lJUTM 5Z SMg8=S8Z[ 8]\SL ;CL SZJLP
10 Discrepancies and adjustment of Errors : S;}Z V\U[ lJ;\UlT VG[ lC;FA HMU o
Any error in quantity or amount in Schedule ’B’ showing items of works to be carried out shall be
adjusted in accordance with the following rules.
CFY WZJFGF SFDMGL AFAT NXF"JTL VG];}lR cBc DF\GF HyYF VYJF ZSDGL SM. 56 E],R]S GLR[GF lGIDM VG];FZ ;ZEZ
SZJFDF\ VFJX[P
a) In the event of a discrapancy between description in words and figures quoted by a tenderer in
the rates column, the description in words shall prevail.
sSf 8[g0Z EZGFZ[ NZGF BFGFDF\ H6FJ[, XaNM VG[ VF\S0F JrR[ SM. V;\UlTGF S[;DF\ XaNMDF\ H6FJ[, ZSD DFgI ZFBJFDF\
VFJX[P
b) In the event of an error occuring in the ‘amount’ coloumn of the Schedule ‘B’ showing items Of
work, as a result of wrong multiplication of the unit rate and quantity; the unit rate shall be
regarded as firm and multiplication shall be amended on the basis of the rate.
sBf V[SD NZ VG[ HyYFGF BM8F U]6FSFZGF SFZ6[ SFDGL AFATM NXF"JTL VH];}lR ccBcc GF BFGFDF\YL ZSDDF\ E], H6FI TM
V[SD NZ DFgI ZFBJFDF\ VFJX[ VG[ NZGF VFWFZ[ U]6FSFZ ;]WFZJFDF\ VFJX[P
c)All errors in totalling in ‘amount’ column in carrying forward totals shall be corrected.
sUf ZSDGF BFGFDF\YL T[DH VFU/ B[\RTF ;ZJF/FGL TDFD E],M ;]WFZJFDF\ VFJX[P
d)Any rounding of amount against “items” or in “totals” shall be ignored.
sWf ccAFATMcc VYJF cc;ZJF/Fcc ;FD[ 5]Z[ VF\S0[ SZ[, SM. 56 AFAT wIFGDF\ ,[JFDF\ VFJX[ GCLP
The tendered sum so altered shall for the purpose of the tender be substituted for the sum
originally tendered and considered for acceptance.
8[g0Z DF8[ 8[g0ZDF\ NXF"J[, ZSDDF\ SZJFDF\ VFJ[, VF 5|SFZGF O[ZOFZ 8[g0ZDF\ EZ[, ZSDG[ AN,[ D]SL :JLS'TL DF8[
lJRFZJFDF\ VFJX[P
10. i) It may please be noted that the tender will be considered as invalid, especially, if the
requirements as per instruction No.1 to 10 above are not complied with before submitting the
tender. Also please read carefully the face sheet and ‘General Rules and Directions for the
guidance of contractor’s of this form.
!_P!P 8[g0Z ZH] SZTF 5C[,F BF; SZLG[ p5ZGL ;]RTF G\ ! YL !_ DF\GL H~ZLIFTMG]\ 5F,G SZJFDF\ VFjI] GCL CMI TM
8[g0Z VDFgI U6JFDF\ VFJX[ T[GL GM\W ,[JF lJG\TL K[P J/L VF OMD"G]\ D]B 5'Q8 VG[SMg8=S8ZGF DFU"NX"G DF8[ ;FDFgI lGIDM
VG[ ;]RGFVM 56 SF/HL5]J"S JF\RJF lJG\TL K[P
10. ii) Right is reserved to reject any or all tender(s) without assigning any reason (s) therefore.
!_P ZP SM.56 SFZ6 NXF"jIF l;JFI SM.56 S[ AWF 8[g0ZM V:JLSFZ SZJFGM CS VAFlWT ZC[ K[P
- 10 -
10-A The tender documents shall have to be filled in.
11. In addition to the above, the tender will also be liable to be rejected outright it-
!!P p5ZGL AFATM p5ZF\T 8[g0Z GLR[GF ;\HMUMDF\ TZT VDFgI 9ZJFG[ 5F+ YX[P
i) The tenderer proposes any alteration in the work specified or in the time allowed for carrying out
the work or any condition or correction made in any code or mode or Schedule ‘B’ or
specifications.
!f 8[g0Z EZGFZ4 lGIT SFD VYJF SFD DF8[ D\H]Z SZ[, VYJF VG];}lR B GF SM. SM0 VYJF 5wWlT VYJF lJUTMDF\ D]S[,
XZT VYJF ;]WFZFDF\ SM. O[ZOFZ ;}RJTF CMIP
ii) Any of the page of the tender is/ are removed or replaced
Zf 8[g0ZG]\ SM. 5FG]\ S[ 5FGF SF-L GFbI] q GFbIF CMI S[ AN<I]\ q AN<IF CMI
iii) All corrections , additions or pasted slips are not initialed by the tenderer.
#f AWF ;]WFZF JWFZF VYJF RM\8F0[,L SF5,LVM p5Z 8[g0Z EZGFZ[ 8]\SL ;CL G SZL CMI
v) The tenderer or in the case of a firm, each partner or the person holding the power of attorney
thereof does not sign or signature is /are not attested by a witness on page, 15 of the tender in the
space provided for the purpose.
5f 8[g0Z EZGFZ VYJF 5[-LGL AFATDF\ NZ[S EFULNFZ VYJF T[ V\U[G]\ D]BtIFZGFD]\ WZFJGFZ jIlST ;CL G SZ[ VYJF
8[g0ZGF 5FGF !5 p5Z T[ DF8[ ZFBJFDF\ VFJ[,L HuIFDF\ ;CL q ;CLVM p5Z SM. ;F1FLV[ ;FB SZL G CMIP
Tender document for work as specified on page number one of this Booklet.
(i) I/We hereby declare that I/We have visited the site and fully acquainted myself/ourselves with the
local situations regarding materials, labour and other factors pertaining to the work before
submitting this tender.
!P C]\ q VD[ VFYL V[SZFZ S~ K]\ q SZLV[ KLV[ S[ VF 8[g0Z ZH] SZTF\ 5C[,F D[P q VD[ :Y/GL D],FSFT ,LWL K[ VG[ SFDG[ ,UTF
DF,;FDFG4 DH]Z VG[ ALÒ AFATMG[ ,UTL :YFlGS 5lZl:YTLGL HFTvDFCLTL D[/JL K[P
(ii) I /We hereby declare that I/We have carefully studied the conditions of contract, specifications and
other documents of this work and agree for execute the same accordingly.
ZP C]\ q VD[ VFYL V[SZFZ S~ K]\ q SZLV[ KLV[ S[ VF S\8=FS8ZGL XZTMGL lJUTM VG[ 8[g0ZG[ ,UTF N:TFJ[HM SF/Ò5]J"S VeIF; SIM"
K[ VG[ T[ D]HA T[GM VD, SZJF;\DT K]\ q KLV[P
1. All works proposed to be executed by the contractor shall be notified in a form of invitation to tender pasted
on a board hung up in the office of the Executive Engineer and signed by the Executive Engineer.
!P SMg8=FS8Z wJFZF SZJF lJRFZ[, TDFD SFDGL HFC[ZFT SFI"5F,S .HG[ZGL SR[ZLDF\ ,8SFI[, AM0" 5Z RM\8F0[, SFI"5F,S .HG[ZGL ;CLJF/F
8[g0Z D\UFJTF OMD" wJFZF SZJFDF\ VFJX[P
. This form will state work to be carried out as well as the date of submitting and opening tenders and the time
allowed for carrying out the work , also the amount of earnest money to be deposited with the tender and the
amount of the security deposit to be paid by the successful tenderer and percentage, if any, to be deducted
from bill. It will also state whether a refund of quarry fees, royalties, octroi dues and ground rents will be
granted. Copies of the specifications, designs and drawing and estimated rates, and any other documents,
required in connection with work which shall be signed by the Executive Engineer for the purpose of
identification shall also be open for inspection by Contractor at the office of the Executive Engineer during
office hours.
CFY WZJFGF SFDGL T[DH 8[g0Z DMS,JFGL VG[ BM,JFGL TFZLBM VG[ SFDM 5]Z] SZJF DF8[ VF5JFDF\ VFJTL D]NTGL HF6 OF[D"DF\ SZFX[P
J/L 8[g0Z ;FY[ VGFDT D]SJFDF\ AFGFGL ZSD VG[ H[G]\ 8[g0Z :JLSFZFI T[6[ HFDLG VGFDT 5[8[ D]SJFGL ZSD VG[ lA,MDF\YL S5FT
SZJFGL SM. 8SFJFZL CMI TM T[ 56 NXF"JJFDF\ VFJX[P J/L 5yYZGL BF6 V\U[GL OL4 ZMI<8L4 VMS8=MIGL ,[6L ZSD VG[ HDLGvEF0FGL
ZSD ZLO\0 D/X[ S[ S[D T[ 56 T[DF\ H6FJJFDF\ VFJX[P lJUTM l0hF.GM4 0=M.\U VG[ V\NFHL NZ4 VG];]lR NZ VG[ SFD V\U[ H~Z CMI V[JF
H[GF p5Z VM/B DFI[ SFI"5F,S .HG[Z ;CL SZX[ V[JF SM. N:TFJ[HMGL GS,M SR[ZLGF ;DI NZlDIFG SFI"5F,S .HG[ZGL SR[ZLV[
SMg8=FS8ZMG[ HM. HJF DF8[ ZFBJFDF\ VFJX[P
. Where the works are proposed to be executed according to the specifications recommended by a
contractor and approved by a competent authority on behalf of the Governor of Gujarat, such
specifications with designs and drawing shall form part of the accepted tender.
SMg8=FS8Z[ E,FD6 SIF" D]HA GF VG[ U]HZFTGF VFJL ZFHI5F, JTL ;tTF VlWSFZLV[ D\H]Z SZ[, lJUT D]HA SFD CFY
WZJFG]\ lJRFI]" CMI tIF\ l0hF.GM VG[ 0=M.\U ;lCTGL VFJL lJUTM :JLS'T 8[g0ZGM EFU AGL ZC[X[P
2. In the event of tender being submitted by a firm. It must be signed separated by each partner
thereof or in event of the absence of any partner it shall be signed on his behalf by person holding
a power of attorney authorising him to do so. Details of partner will be furnished in Annexure-I
along with the copy of partnership.
ZP SM. V[S 5[-L TZOYL 8[g0Z ZH[ YI] CMI tIFZ[ T[GF EFULNFZ[ V,U ZLT[ ;CL SZJL VYJF EFULNFZ U[ZCFHZ CMItIFZ[
T[GF JTL T[GF 5Z ;CL SZJF VlWS'T SZT]\ D]BtIFZGFD]\ WZFJTL SM. 56 jIlSTV[ T[GF 5Z ;CL SZJFGL ZC[X[P EFULNFZMGL
lJUT 5lZlXQ8v! DF\ EFULNFZL BTGL GS, ;FY[ VF5JFGL ZC[X[P
3. Receipts for payment made on account of any work, when executed by a firm , shall also be signed
by all the partners except where the Contractors are described in their tender as a firm in which
case the receipts shall be signed in the name of the firm by one of the partners or by some other
person having authority to give effectual receipts for the firm.
#P SM. 5[-LV[ SFD SZL VF%I]\ CMI tIFZ[ T[ SFD SZFI[, R]SJ6LGL 5CM\RM 5Z 56 AWFH EFULNFZ[FV[ ;CL SZJFGL ZC[X[P 5Z\T] H[ 8[g0ZDF\
SMg8=FS8ZMG[ V[S 5[-L TZLS[ NXF"\jIF CMI tIFZ[ V[ 5[-L JTL V[GF SM. EFULNFZ[ S[ 5[-L JTL 5FSL 5CM\R VF5JFG[ VlWS'T V[JL ALHLÒ SM. 56
jIlSTV[ 5CM\RM 5Z ;CL SZJFGL ZC[X[P
4. Any person who submits a tender shall fill up the usual printed form including the column total according to
estimated quantities stating at what rate he is willing to undertake each item of the work. Tender which
proposes any alteration in the works specified in the said form of invitation to tender or in the time allowed
for carrying out the work or which contain any other condition of any sort , will be liable to rejection. No
single tender shall include more than one work but contractors who wish to tender for two or more works
shall submit a separate tender for each, Tender shall have the name and the number of the work (to which
they refer ) written outside the envelope.
$P 8[g0Z EZGFZ SM. 56 jIlSTV[ V\NFHÒ HyYF VG];FZ BFGFGF ;ZJF/F ;lCT ZFA[TF D]HAG]\ KF5[,] OF[D" EZJFG]\ ZC[X[ T[DF\ SFDGL NZ[S
AFAT SIF NZ[ :JLSFZJF .rK[ K[ T[ T[D6[ H6FJJFG]\ ZC[X[P 8[g0Z D\UFJJFGF pST OMD"DF\ NXF"J[, SFDDF\ VYJF SFD SZJF VF5[,L D]NTDF\
O[ZOFZ SZJF .rKTF CMI VYJF H[DF\ ALHL SM. 56 5|SFZGL XZT CMI T[JF 8[g0Z V:JLSFI" ,[BFX[P SM. V[S 8[g0ZDF\ V[S SZTF\ JW]
SFDGM ;DFJ[X YX[ GCLP 5Z\T] A[ S[ T[YL JW] SFDDF\ 8[g0Z EZJF DFUTF SMg8=FS8ZMV[ NZ[S SFD DF8[ V,U 8[g0Z EZJFGF ZC[X[P 8[g0ZMJF/F\
5ZAL0LIF\GL ACFZGF EFUDF\ H[G[ ,FUTF CMI T[ SFDGF\ GFD VG[ G\AZ ,BJFGF ZC[X[P
OR
The following rule shall apply to the works having estimated cost of Rs.100 lacs (Rupees One Hundred
lacs) and above. (G.R, R & B.D No. TNC–1777–281C , dated 30-7-1992 )
(a) It is not desirable to make any alteration in the works specified in the said tender form of invitation to
tender or in the time allowed for carrying out the work or any other conditions of any sort. However, if
it is felt necessary by the
- 12 -
tenderer to have any conditions, he shall have to submit a sealed cover containing two separate covers for
‘technical bid’ and ‘price-bid’ duly super scribed on the sealed cover. No such tender shall include more
than one work but contractors who wish to tender for two or more works shall submit a separate tender for
each .Tender shall have the type of bid and the name of the work (to which they refer ) written.
)P AW]H SFD SM. 56 :YFlGS lZJFHG[ ,1FDF\ ,LWF l;JFI4 WMZ6;ZGF DF5 D]HA VG[ AF\WSFD lJEFUGF lGIDM TYF lZJFH
VG];FZ JF:TlJS ZLT[ DF5JFDF\ VFJX[P
9A. Under no circumstances shall any Contractor be entitled to claim enhanced rate for any items in this
contract.
)vSP SM.56 ;\HMUMDF\ VF SMg8=FS8DF\GL SM.56 AFATM DF8[ SM. SMg8=FS8ZG[ JW] EFJ DF\UJFGM CSS ZC[X[ GlCP
10. Every contract shall, unless exempted in writing by the Superintending Engineer concerned, produce along
with this tender a solvency certificate of his financial ability from the Collector of the district within which
he resides or a Banker’s certificate. If he fails to produce such a certificate his tender will not be considered.
!_P ;A\lWT VlW1FS .HG[Z ,[lBT D]lST VF5L CMI T[ l;JFI4 NZ[S SMg8=FS8Z[ 5MT[ H[ lH<,FDF\ ZC[TF CMI tIFGF S,[S8Z 5F;[YL NFZ56FG]\
5|DF65+ VYJF T[GL VFlY"S ;wWZTF V\U[G]\ A[\gSZG]\ 5|DF65+ 5MTFGF 8[g0Z ;FY[ ZH] SZJFG]\ ZC[X[P VFJ]\ 5|DF65+ ZH] SZJFDF\ T[
lGQO/ HX[ TM T[DG]\ 8[g0Z wIFGDF\ ,[JFX[ GlCP
11. All corrections and additions or pasted slips should be initialed.
!!P TDFD ;]WFZF4 JWFZ[ S[ RM\8F0[,L SF5,LVM 5Z 8]\SL ;CL SZJFGL ZC[X[P
12. The measurements of work will be taken according to the usual method in use in the Public Works
Department or as specified in technical specification and no proposals to adopt alternative methods will be
accepted. The Executive Engineer’s decision as to what is the usual method in use in the Public Works
Department will be final.
!ZP SFDGF DF5 AF\WSFD lJEFUMGL ZFA[TF D]HAGL 5wWTL4 VYJF 8[SGLS, :5[;LOLS[XGDF\ NXF"jIF VG];FZ ,[JFDF\ VFJX[ VG[ J{Sl<5S
5wWTLVM V5GFJJF V\U[ SM.56 NZBF:T :JLSFZFX[ GCL S. 5wWTL AF\WSFD lJEFUGL ZFA[TF D]HATL K[ T[ V\U[GF SFI"5F,S .HG[ZGM
lG6"I VFBZL U6FX[P
13 The Insurance Company’s bond will not be accepted against the security deposit.
!# JLDF\ S\5GLG]\ BT HFDLG VGFDT ;FD[ :JLSFZJFDF\ VFJX[ GCLP
13-A In the event of any error or discrepancy in write up of tender documents the contractor will not take any
undue advantage of such error or discrepancy and Engineer-in-Charge shall have powers to interpret and
decide correct meaning of contradictory erroneous writing.
14. The Contractor will have to construct a shed for storing controlled and valuable materials issued to him
under schedule ‘A’ of the agreement at work-site having double locking arrangement . The materials will
then be taken for use in the presence of the Department person. No materials will be allowed to be removed
from the site of work.
!$P SZFZGL VG];}lR S C[9/ SMg8=FS8ZG[ VF5JFDF\ VFJ[, lGI\+6 VG[ lS\DTL DF,;FDFG SFDGF :Y/[ ZFBJF DF8[ T[D6[ A[J0F TF/FTL
jIJ:YFJF/L V[S KF5ZL AF\WJFGL ZC[X[P T[ 5KL lJEFUGL SM. jIlSTGL CFHZLDF\ p5IMUDF\ ,[JF DF,;FDFG T[DF\YL ACFZ SF-JFGM ZC[X[P
SFDGF :Y/[YL SM.56 DF,;FDFG B;[0JF N[JFX[ GCLP
15. No foreign exchange will be released by the Department for the purpose of plant and machinery required for
the execution of the work contracted for.
!5P H[G[ DF8[ SMg8=FS8 V5FIM CMI T[ SFD SZJF DF8[ H~ZL %,F8 VG[ I\+ ;FDU|L DF8[ HFC[Z AF\WSFD lJEFU SM. H lJN[XL C}\l0IFD6K]8]\ SZX[
GCLP
16. Controlled materials (Essentiality Certificate)
!&P lGI\+6 DF,;FDFG sVFJxIS 5|DF65+f
(i) As regard controlled materials, the Public Works Department will help to arrange for the permit as far as
possible and help the Contractor in securing the same. All incidental charges met with in procuring these
materials shall be borne by the Contractor himself. Though the Public Works Department will help to
arrange for the permit as far as possible and help the Contractor in obtaining the materials, it shall not accept
any responsibility for any loss on account of delay caused to the Contractor while obtaining the same.
!f lGI\l+T DF,;FDFG 5]ZT]\ AF\WSFD lJEFU XSI T[8,L ZLT[ 5ZDL8 DF8[GL jIJ:YFDF\ DNN SZX[ VG[ T[ ;]lGl`JT SZJFDF\ SMg8=FS8ZG[
DNN SZX[P VF DF,;FDFG D[/JJFDF\ YI[, TDFD VFG]\QFF\lUS BR" SMg8=FS8Z 5MT[ EMUJX[P AF\WSFD lJEFU 5ZDL8 D[/JJF AG[ T[8,L DNN
SZX[ VG[ DF,;FDFG D[/JJF SMg8=FS8ZG[ DNN SZX[4 T[ KTF\ SMg8=FS8ZG[ T[ D[/JJFDF\ SM. lJ,\A YJFG[ ,LW[ SM. lJ,\A S[ G]SXFG DF8[
HFC[Z AF\WSFD lJEFU HJFANFZ ,[BFX[ GCLP
(ii)The contractor shall submit to the Executive Engineer on close of every calendar month the monthly returns in the
prescribed forms as to the receipts and actual use of the controlled materials during the month.
Zf NZ[S V\U|[Ò DCLGFG[ V\T[SMg8=FS8Z[ DCLGF NZdIFG lGI\l+T DF,;FDFGGL VFJS VG[ BZ[BZ J5ZFX V\U[ lGIT OMD" D]HAGF DF;LS lGIT5+SM
SFI"5F,S .HG[ZG[ DMS,JFGF ZC[X[P
(iii) The contractor shall permit Executive Engineer or his representative to inspect the stock of the controlled materials
stored by him at any time whenever the Executive Engineer or his representative so desire (s).
#f SFI"5F,S .HG[Z VYJF T[GF 5|lTlGlWVM HIFZ[ .rK[ tIFZ[ SMg8=FS8Z[ T[D6[ ;\U|CL ZFB[,M lGI\l+T DF,;FDFGGM :8MS SM. 56 JBT[ T5F;JFDF\ N[JFGM
ZC[X[P
17. The tender for the work shall remain open for period (120*) days from the date of opening of Technical Bid of this work
and that the tenderer shall not be allowed to withdraw or modify the offer on his own after downloading of bid. If any
tenderer withdraws or make any modifications or additions in the terms and conditions of his tender not acceptable to the
Government (Public Works Department) then the Government shall without prejudice to any right remedy. Be at liberty
to forfeit in full the said earnest money absolutely, in this connection G.R. R & BD NO. TNC – IIB – 22 (10) – C, dated
24-5-90 should be referred to.
- 14 -
!*P VF SFD DF8[G\] 8[g0Z .v8[g0ZL\U YL 8[SGLS, AL0 BM<IF TFZLBYL s!Z_f lNJ; DF8[ B]<,]\ ZC[X[ VG[ VF D]NT NZlDIFG VF 8[g0Z
EZGFZG[ VF VMOZ :J{rKFV[ 5FKL B[\RL ,[JF S[ T[DF\ O[ZOFZ SZJF N[JFDF\ VFJX[ GlCP VF ;DI 5C[,F HM 8[g0Z EZGFZ T[6[ EZ[,F
8[g0ZGL XZTM VG[ AM,LGM 5FKL B[RL\ ,[ VYJF T[DF\ ;]WFZMq ;]WFZFVM pD[ZMq pD[ZFVM SZ[ H[ ;ZSFZ sHFC[ZFT AF\WSFD lJEFUf G[ :JLSFI"
G CMI4 TM CSS S[ .,FHGF 5]J"U|C JUZ ;NZ C]\ AFGFGL 5]ZL ZSD H%T SZJFGL ;ZSFZG[ ;\5]6" :JT\+TF ZC[X[P VF DF8[ !$v5v)_GM
DFPDP lJEFUGM 9ZFJ G\P 8LPV[GP;LPVF.vVF.vALvZ_s!_fSP H]VMP
18. The contractor shall employ only such labourer who shall produce a valid certificate of having been
vaccinated against small pox within a period of last three years.
!(P K[<,F +6 JQF"GL D]NTGL V\NZ XLT/FGL Z;L 8\SFJL CMJF V\U[G]\ SFIN[;ZG]\ 5|DF65+ ZH] SZGFZ DH]ZG[ H SMg8=FS8Z SFD[ ZFBX[P
19. Immediately after issue of the work order for the works of Roads, Bridges and Buildings, the contractor shall
display the board showing brief details fo the specifications on the site of work ( R & B D GR NO. TNC-
1090- 24-C, dated 18-11-1991.)
!)P Z:TF4 5],M4 DSFGMGF SFDGM JS"vVM0"Z .xI] YIF 5KL T]T"H SFDGF :Y/[ SZJFGF SFDGF :5[;LOLS[XG V\U[GL AM0" SMg8=FS8Z[ 5MTFGF BR["
D]SJFG]\ ZC[X[P
!P SFDG]\ GFD ov s SFDGM 5|SFZ f &P ;]5ZJF.hZL :8FOGF GFD ov
ZP lJEFUG]\ GFD ov *P SFD X~ SZJFGL TFZLB ov
#P 5[8F lJEFUG]\ GFD ov (P SFD 5]~ SZJFGL TFZLB ov
$P 8[g0ZGL ZSD ov )P SFDGF :5[XLOLS[XG ov
5P .HFZNFZzLG]\ GFD ov
Z:TFGF SFDM
v DF8L SFDGL HF0F. PPPPPPPPPPPPPPPP ;[PDLP v D[8,GF 5|YD :TZGL HF0F. PPPPPPP ;[PDLP
v 0FDZGL ;5F8LG]\ SFD PPPPPPPPPPPPPPP ;[PDLP v D[8,GF ALHF :TZGL HF0F. PPPPPPPP;[PDLP
s PPPPPPPPPPPPPPPPPPPPPS5RL PPPPPPPPPPPPPPPPPPPPPP U|L8 VG[ PPPPPPPPPPPPPPPPPPPPP 0FDZ JF5ZJFGF[ f
v 0FDZGL ;L,L\U ;ZO[;G]\ SFD PPPPPPPPPPPPPPPP ;[PDLP
s PPPPPPPPPPPPPPPPPPP S5RL4 PPPPPPPPPPPPPPPPPP U|L8 VG[ PPPPPPPPPPPPPPPPPPPPPPP 0FDZ JF5ZJFGM f
5],GF SFDM
v5],GF PPPPPPPPPPPPPPP ,\AF.GF PPPPPPPPPPPPPPP UF/F v 5],GF 5FIGF SMgS|L8G]\ 5|DF6 PPPPPPPPPP s;LD[g84 S5RL4 Z[TL f
v 5],GF YF\E,FqV[A8D[g8GF SMgS|L8G]\ 5|DF6PPPPPPP s;LD[g84S5RL4Z[TLf v ;]5Z :8=SRZGF SMgS|L8G]\ 5|DF6 PPPP s;LD[g84 S5RL4 Z[TL f
v VgI lJX[QF HMUJF.
‘DSFGGF SFDM
v 5FIFGF SMgS|L8G]\ 5|DF6 PPPPPPPPPPPPP s;LD[g84 S5RL4 Z[TL f v .\8MGF R6TZDF\ ;LD[g8qZ[TLG]\ 5|DF6 PPPPPPP s;LD[g8qZ[TLf
v EM\IT/LIFGF SMgS|L8G]\ 5|DF6 PPPPPPP s;LD[g84 S5RL4 Z[TL f v EM\IT/LI[ PPPP ;[PDLP HF0F.GL PPPP ;[PDLP ;F.hGL DMh[S 8F.<;
v AFZLAFZ6F v ;FUL ,FS0FGF q :8L, O|[D q VgI
VFZP;LP;LPSFDM
VFZP;LP;LPSFDDF\ SMgS|L8G]\ 5|DF6 PPPPPPP s;LD[g84 S5RL4 Z[TL f
VF SFDGF lJUTJFZ :5[XLOLS[XG GFIA SFI¶5F,S .HG[ZzL PPPPPPP 5[8F lJEFUGL SR[ZLVM VMOL;GF ;DI NZdIFG SM.56
;DI[ HM. XSX[P VF SFDGF DFl,SL HFC[Z HGTFGL K[P VG[ SFDDF\ SM. 1FlT S[ VlGIlDTTF H6FI TM T[ AFATDF\ ;A\lWT VlW1FS .HG[ZzL
PPPPPPPPPPPPPPPPPPPPPPPP JT]¶/ S[ H[VMGL SR[ZL PPPPPPPPPPPPPP :Y/[ K[P T[VMG]\ wIFG NMZJF lJG\TL K[P
SFI¶5F,S .HG[Z
lH<,F DFPDPlJEFU4 ZFHSM8
Z_ SZFZGFDFDF\ HIF\ HIF\ cc A[gS cc GM p<,[B K[ T[ T[ cc A[gS cc V[8,[ S[ ccXL0I],cc S[ ccZFQ8=LIST A[gS cc H ;DHJLP
21. The buildings under the contract will not be occupied by the contractor for use of his labourers, staff or for
any other purpose, in case of breach of this condition market rent will be recovered for the area unauthorized
occupied.
Z!P SMg8=FS8Z C[9/GF\ AF\WSFDGF\ DSFGMGF[ p5IMU .HFZNFZ 5FTFGF DH]ZM4 :8FO S[ VgI SM. C[T] DF8[ SZL XSX[ GlCP GM VF XZTGM E\U
SZJFDF\ VFJX[ TM DFS["8 Z[g8 5|DF6[ T[8,L HuIFG]\ EF0] J;], SZJFDF\ VFJX[P
ZZP 8[g0Z HM0[GF V[G[1FZ 5 TYF & DF\ SMg8=FS8Z[ ;FRL DFCLTL SF/HL5]J"S VF5JLP VF DFCLTLGF VFWFZ[SMg8=FS8ZGF EFJM GLRF CMJF KTF T[
lJRFZ6F C[9/G]\ SFD ;DIvDIF"NFDF\ SZL XSJF ;1FD K[ S[ S[D VG[ T[GL VMOZ ;F{YL GLRL VG[ H~ZLIFT VG]~5 K[ S[ S[D T[ AFAT GSSL
SZJFDF\ VFJX[P
TENDER FOR WORK - SFD DF8[G]\ 8[g0Z
I/ We hereby tender for the execution for the Governor of Gujarat ( hereinbefore and hereinafter referred to as
Government) of the work specified in the underwritten memorandum within the time specified in such memorandum at the
tendered rates specified in Schedule ‘B’ (memorandum showing item of works to be carried out ) and in accordance in all respects
with the specifications, designs, drawings and instructions in writing referred to in this tender and in Clause 13 of the annexed
conditions of contract and agree that when materials for the work are provided by Government , such materials and the rates to be
paid for them shall be as provided in scheducle ‘A’ hereto.
VFYL C]\ q VD[] ;G];}lR cBc CFY WZJFGF SFDGL AFATM NXF"JTL IFNLDF\ lGlN"Q8 8[g0ZGF NZYL VFJL IFNLDF\ 9ZFJ[, D]NTGL V\NZ VG[ VF 8[g0ZGL ;FY[ HM0[,L
SMg8=FS8ZGL XZTMGF B\0 !# DF\ H6FJ[,L ,[lBT lJUTM4 l0hF.GM4 0=M.\U VG[ ;]RGFVM VG];FZ AWL ZFT[4 GLR[ H6FJ[,L IFNLDF\ NXF"J[,]\ SFD SZJF DF8[ U]HZFTGF
ZFHI5F, sH[DG[ VCL\ VUFp VG[ CJ[ 5KL c;ZSFZc TZLS[ H6FJ[, K[Pf DF8[ 8[g0Z ZH] SZ] K]\ q SZLV[ KLV[ VG[ T[ SFD DF8[ ;ZSFZ TZOYL DF,;FDFG 5]ZM 5F0JFDF\
VFJ[ tIFZ[ T[ DF,;FDFG VG[ T[DF8[ R]SJJFGF NZ ;FY[GL VG];}lR cSc DF\ HMUJF/VM SIF" D]HAGL ZC[X[ T[ DG[q VDG[ SA], K[P
- 15 -
MEMORANDUM v IFNL
sSf H]NF H]NF 5[8F SFDMGM ;DFJ[X SZFIM CMI TM T[GL !f ;FDFgI J6"G Sg:8=SXG JS" VMO gI] S|M; 0=[.G[H4
lJUT V,U IFNLDF\ VF5JLP ZL5[ZL\U VMO S|M; 0=[.G[H4 :8=SRZ V[g0
lA|H ZL5[Z JS" V[g0 VWZ lD;P JS" VMG
J[ZLI; ZM0 V[; V[g0 JC[G ZLSJF0" VMZ
.G .DZHg;L Vg0Z l0:8=PsVFZ V[g0
ALf 0LJLhG4 ZFHSM8 s+LHM 5|ItGf
sBf V\NFHLTÒ BR"
~FP24,23,01,013.88
sUf VGFDT D]SJFGL AFGFGL ZSD AF\WSFD lJEFUGF
lGID;\U|C 5]:TS ! GF OSZF Z_Z VG[ Z_# GL
HMUJF. VG];FZ ZC[X[P sUf AFGFGL ZSD ~FP 2423100.00
sWf HFDLG VGFDTs5F\R 8SFf
s!f ;ZNFZ ;ZMJZ GD"NF lJUDGL V[S S[ T[YL JW] JQF"GL D]NTJF/L YF56 s0L5MhL8 :J~5[f ~FP7269100.00
VYJF T[GL ART :J~5[ sS], 0L5MhL8 ZSDGF 5_ 8SF V\NFÒ lS\DTGF #P_ 8SFf
Zf .HFZNFZGF AL,MDF\YL 5 8SF ;]WL S5FT ZSD sS], 0L5MhL8GF 5_ 8SF ;]WL H[ ZSD ;ZNFZ
;ZMJZ GD"NF lGUDGL AF\WL D]NTGL YF56DF\ s0L5MhL8 :J~5[f S[ GFGL ART :J~5[ O[ZJL ~FP 6057600.00
XSFX[P
sRf VG];]lRT A[gSG]\ AF\C[WZL5+ s~l5IF !5 ,FB p5ZGF SFDDF\ V\NFHL lS\DTGF 5 8SF ,[B[f ~FP -
S],~FP13326700.00
* Vide R & BD G.R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-
1088/IB/18/(13)-O , dated 31-8-94.
Wvs!f BR" 5|DF6[ DF5 ,[TF SFD V0W] YFI tIFZ[ HFDLG VGFDT TZLS[ V[JL S], ZSD 5]ZF Y. ZC[ T[ DF8[ AL,MDF\YL SM. 8SFJFZL S5FT SZJFGL
ZC[TL CMI TMT[ 5 8SF ZC[X[P
WvsZf OSZF Rs!f D]HA AL,DF\YL SF5[, ZMS0 HFDLG VGFDT GFGL ART 5|DF65+ S[ V[OP0LPVFZP DF\ ~5F\TZ SZJF SMg8=FS8Z ,[BLT H6FJX[
TM T[ D]HA ~5F\TZ SZFJL XSX[P VF D]HAGL ~5F\TZLT HFDLG VGFDT TYF SZFZGFD]\ SZTL JBT[ ZH] SZ[, jIFH]SL HFDLG VGFDTGL D]NT
5FSTF V[S DCLGF VUFp SMg8=FS8Z ,[BLT H6FJX[ TM T[ VGFDT SMg8=FS8Z H6FJ[ T[8,F ;DI DF8[ ZLgI] SZFJL V5FX[P
(f) Time allowed for the completion of work from date of written order to commence 12-Months
sKf SFD X~ SZJFGF ,[lBT C]SDDF\ lGIT SZ[, TFZLBYL 5]~ SZJF DF8[ VF5[,L D]NT !ZvDCLGFP
Give Schedule where necessary, showing dates by which the various items are to be completed:
H[ TFZLBM ;]WLDF\ H]NL H]NL AFATM 5]ZF SZJFGL CMI T[ TFZLBM NXF"JTL VG];}lR H~Z CMI tIF\ VF5JL o
(g) Should this tender be accepted, I /We hereby agree to abide by fulfil all the terms and provisions of the
conditions of the contract annexed here to so far as applicable and in default thereof to forfeit and pay to
Government in Office the sums of money mentioned in the said conditions.
sHf VF 8[g0Z :JLSFZJFDF\ VFJX[ TM ,FU] 50TL CX[ tIF ;]WL4 VF ;FY[ HM0[,L SMg8=FS8 GL AWL XZTMGL HMUJF.VMG]\ 5F,G SZJF VG[ T[G[
5ZL5]6" SZJF C]\ q VD[ A\WFp K]\ q A\WF.V[ KLV[ VG[ T[D SZJFDF\ S;]Z YI[ pST XZTMDF\ NXF"J[, ZSD ;ZSFZDF\ HDF SZFJJF VG[ R]SJJF
C]\ q VD[ ;\DT YFp K]q Y.V[ KLV[P
(Receipt No……………….dated ………………….from the Government Treasury or Sub-Treasury at
…………………………………….in respect of sum Rs. ………………………………is forwarded herewith
representing the earnest money + (a) the full of value of which is to be absolutely forfeited to Government should 1/
We not deposit the full amount of security deposit specified in the above memorandum in accordance with Clause I of
the said conditions otherwise the said sum of above Rs. ……………………shall be refunded. )
Contractor ………………………………………………………………………
Address …………………………………………………………………………
Dated the ……………………….Day of ……………….200…………….200
(Witness )………………………………………………………………………
……………………………………………………………………….
(Address) ……………………………………………………………………..
(Occupation) ………………………………………………………………….
The tender is hereby accepted by me on behalf of the Governor of Gujarat.
Dated the ………………………. Day of ………………………200 ……….
CLAUSE 13:
(1) The contractor shall execute the whole and every part of the work in the most substantial and workman-like manner and both as
regards materials and in other respects in strict accordance with specifications.
The contractor shall also confirm exactly, fully and faithfully to the design, drawings and instructions in writing for the work
signed by the Engineer-in-charge . the design and the drawings shall we lodged in the office of the site Engineer-in-charge to
which the contractor shall be entitled to have access for the purpose of inspection at such office during office hours.
Where the instructions referred to above are not contained in separate letters addressed to the contractor the same shall be recorded
in the work-order book, which shall be maintained and kept on the site of the work. The contractor shall be required to sign such
entries in the work-order book in token of having noted the instructions. However, if the contractor fails to sing the work-order
book for any reason whatsoever, the entry of the instructions in the work-order book shall be deemed to be the due notice to him of
the said instructions. The work-order book shall be open for inspections to the contractor on the site of the work during office
hours.
(2) The contractor will be entitled to receive one copy of the accepted tender along with the work order free of cost and will also
be entitled to receive three sets of contract and working drawings according to the progress of work as and when needed, free of
cost.
(3) The several documents forming the contract are essential parts of the contract and requirements occurring in one is binding as
through occurring in all. They are intended to be mutually explanatory and complimentary and to describe and provide for a
complete work.
In the event of any discrepancy in the several documents forming the contract or in any one documents, the following order of
precedence should apply.
(a) Dimension and quantities : (i) Drawings (ii) Schedule-B of the Tender form (iii) specification.
On drawings, figures dimensions, unless obviously incorrect, will be followed in preference to scaled dimensions.
(b) Description : (I) Schedule-B of the Tender form :- (ii) Drawings (iii) Specifications.
In the case of effective description or ambiguity, the Engineer-in-charge is entitled to issue further instructions directing in what
manner the work is to be carried out. The contractor cannot take any advantage of any apparent error or omission in drawings or
specifications and the Engineer-in-charge shall be entitled to make corrections and interpretations as necessary to fulfill the plans
and specifications.
CLAUSE 14.1 :
The Engineer-in-charge shall have power to make any alterations in or addition to the original specifications,
drawings, designs and instructions that may appear to him to be necessary or advisable during the progress of the
work and the contractor shall be bound to carry out the work in accordance with any instructions in this connection
which may be given to him in writing signed by the Engineer-in-charge and such alternation shall not invalidate the
contract and additional work which the contractor may be directed to do in the manner above specified as part of the
work shall be carried out by the contractor on the same conditions in all respects on which he agreed to do the main
work and at the same rate as out by the contractor on the same conditions in all respects on which he agreed to do the
main work and at the same rate as are specified in the tender for the main work.
14.2. Except that when the quantity of any item exceeds the quantity as in the tender by more than 10% the
contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the year during which the
excess in quantity is first executed or tender rate whichever is less.
14.3. If the additional or altered work includes any class of work for which no rate is specified in this contract,
then such class of work shall be carried out.
(i) At the rate derived from the item within the contract which is comparable to the one involving additional or altered
class of work, where there are more than one comparable items , the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be selected and the decision of the
Superintending Engineer as to the nearest comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (I) above, such class of works shall be carried out at the rate entered in the
Schedule of Rates of the Division for the year in which the tender was received, increased or decreased by the percentage by which
the tender amount is more or less as compared to the amount arrived at the rates in the “Schedule or Rates” of the Division in the
year in which the tender was received. if the Schedule of rates of the Division does not contain all the items the percentage
increase or decrease of the tender shall be calculated considering such items which were included in the “Schedule of Rates “of the
Division for the year and for materials consumed on such item the rate to be charged would be the basic rate taken into account for
fixing the rate in S.O.R. referred to above instead of the rate. Stipulated in schedule ‘A’.
(iii) If it is not possible to arrive at the rate from (I) and (ii) above, such class of work shall be carried out at the rate decided by
the competent authorities on the basis of detailed rate analysis after hearing the contractor before a Committee of two
superintending Engineers stationed at the same place or the nearest place.
14.4 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of the Division is ordered to be
carried out before the rate is agreed upon, then the contractor shall within seven days of the date of receipt by him of the order to
carry out the work, inform the Engineer-in-charge of the rate, which it is his intention to charge for such class of work and if the
Engineer in charge does not agree to this rages, he shall by notice in writing be at liberty to cancel his order to carry out such class
of work and arrange to carry it out in such manner as he may consider it advisable, provided always that if the contractor shall
commence work or incur any expenditure in regard thereof before the rates shall have been determined as lastly herein before
mentioned, then in such cases he shall only be entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-
charge. In the event of the dispute, the decision of the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications recommended by the contractor and
- 21 -
accepted by the competent authority, the alternation above referred to shall be within the scope of such designs,
drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the increase in the cost
occasioned by alternations bears to the cost of the original contract work and the certificate of the Engineer –in-
charge as to such proportion shall be final and conclusive.
14.5 For excess in item of well sinking the rates for sinking in depth beyond the designed depth shall be as per the
rate quoted by the contractor in the statement of variation, if no rates of variation in sinking are quoted the rate
payable shall be the tender rate for sinking at designed level increased by the difference of schedule of rate for
sinking at designed depth and sinking at final depth .
CLAUSE 15: No claim for any payment of compensation for change or restriction of work
If at any time after the execution of the contract documents the Engineer-in-charge shall for any reason
whatsoever, require the whole or part of the work, as specified in the tender, be stopped for any period or
shall not require the whole or part of the work to be carried out at all or to be carried out by the contractor,
he shall give notice in writing, stating the fact to the Contractor who shall thereupon suspend or stop the
work totally or partially, as the case may be. In any such case , except as provided hereunder, the
Contractor shall have no claim to any payment or compensation whatsoever except as provided hereunder
on account of any profit or advantage which he might have derived from the execution of the work in full
but which he did not so derive in consequence of the full amount of the work not having been carried out,
or on account of any loss that he may be put to on account of materials purchased or agreed to be
purchased or for unemployment of labour required by him. He shall not have also any claim for
compensation by reason of any alteration having been made in the original specifications, drawings,
designs and instructions which may involve any curtailment of the work as originally contemplated.
(1) However, the contractor will be entitled for compensation for loss, if any on the date of notice, for the
purchased materials or for the contract executed for the material to be purchased for such work. Such
compensation will be paid only for actual loss for materials, if such materials so purchased or agreed to
purchase is of required quantity/quality and was purchased/ contracted to be purchased only for the same
work. But no compensation shall be granted to contractor on material for which advance has been given to
contractor by Government. The amount of loss for such claim will be decided by in charge Engineer-in-
charge.
(2) The contractor also will be entitled for compensation of unemployed labour for 7 days from the date of
notice provided that in that opinion of Engineer-in-charge such labour working for 7 days prior to the
notice and would not be in a position to get employment elsewhere within 7 days from the date of such
notice . The contractor should try to employ such unemployed labour at other places from the date of such
notice.
In case the Contractor does not agree with the decision of Executive Engineer regarding the amount of
compensation or loss; it will be open for the contractor to appeal to Superintending Engineer-in –charge
within one month form the date of knowledge of such decision. In such case the decision of Superintending
Engineer will be final and binding to the Contractor.
The Contractor shall not be entitled for loss of any expected profit of such work.
(Vide G.R. NO.SSR/1090/IB/247(2) /C, dtd 28-06-1993 as amended by GR of even number dated
11/02/1999)
B\0 !5 o SFDGF O[ZOFZ S[ lGI\+6 DF8[ SM. R]SJ6L S[ J/TZ V\U[ SM. CSNFJM D\H]Z G SZJF AFATP
5|EFZL .HG[ZG[ SZFZGF N:TFJ[HM SIF" 5KL SM.56 ;DI[4 SFZ6;Z 8[g0ZDF\ BF; p<,[B SIF" D]HAGF ;\5]6" S[ V\XTo AF\WSFDG[ SM.56 D]NT ;]WL
A\W SZJ] H~ZL H6FI VYJF ;\5]6" S[ V\XTo SFD 5]Z] SZJFGL H~ZLIFT H G H6FI VYJF SMg8=FS8Z wJFZF SZJFGF SFDGL H~ZLIFT G H6FI TM T[JF
SMg8=FS8ZG[ CSLST NXF"JTL ,[lBT GM8L; VF5X[ VG[ SMg8=FS8Z VF GM8L; D?IF AFN TZTH VF SFDG[ IYF 5|;\U ;\5]6" S[ V\XTo :YlUT SZX[ S[ A\W
SZX[P
VFJF S[;DF\ VCL GLR[ SZ[, HMUJF. l;JFI SMg8=FS8Z T[6[ SFD 5]~ SI]¶ CMI TM H[ GOM S[ OFINM T[G[ D/T4 5Z\T] SFD 5]~ G YJFGF 5ZL6FD[ T[ G D?IFYL
YI[, G]SXFG VYJF T[6[ BZLNL CMI V[JL S[ H[ BZLNJF T[ ;CDT YIM CMI V[JL DF,;FDU|LGL AFATDF\ YI[, G]SXFG VYJF T[G[ T[GF SFD DF8[ G[
DH]ZMGL H~Z CTLT[ DH]ZMG[ SFD G VF5L XSJFG[ SFZ6[ YI[, G]SXFG V\U[ SM. R]SJ6L S[ J/TZGM CSNFJM SZL XSX[ GCLP D]/ lJUT J6"G 4
VF,[BG4 GSXF VG[ ;]RGFVMDF\ SZJFDF\ VFJ[, SM. O[ZOFZG[ SFZ6[ D]/E]T ZLT[ lJRFZFI[, SFDDF\ SM. SF5 VFJ[ TM 56 V[JF SFZ6;Z T[ SM.
J/TZ DF8[ CSNFJM SZL XSX[ GCLP
!f VFD KTF\ VFJF SFD DF8[ BZLN[,L DF,;FDU|LG[ SFZ6[ S[ DF,;FDU|L BZLNJF DF8[ SZ[, SMg8=FS8 G[ SFZ6[ HM SMg8=FS8ZG[ GM8L;GL TFZLB ;]WLDF\
SM. G]SXFG YI]\ CMI TM T[GF DF8[ J/TZ D[/JJF T[ CSNFZ AGX[P HM VFJL ZLT[ BZLN[, VYJF BZLNJF ;DH]TL YI[, DF,;FDU|L DF\uIF 5|DF6[ GF
HyYFDF\ VG[ U]6JtTFI]ST CMI VG[ T[ OST V[H SFD DF8[ BZLNFI[,L CMI S[ BZLNJF SZFZ YI[, CMI TM T[JL DF,;FDU|L V\U[ BZ[BZ G]SXFG DF8[ H
VFJ]\ J/TZ R]SJJFDF\ VFJX[P 5Z\T] H[ DF,;FDU|LGL BZLNL V\U[ ;ZSFZzL TZOYL .HFZNFZGL V[0JFg; VF5JFDF\ VFJ[, CMI T[ DF,;FDU|L p5Z
SM.56 HFTGF G]SXFGG]\ J/TZ R]SJJFDF\ VFJX[ GCLP VFJ CSNFJF DF8[ G]SXFGGL ZSD 5|EFZL SFI"5F,S .HG[Z wJFZF GSSL SZJFDF\ VFJX[P
- 22 -
Zf GM8L;GL TFZLBYL ;FT lNJ; DF8[ SFD[ G ZFBL XSFI[, DH]ZMGL AFATDF\ 56 SMg8=FS8Z J/TZ D[/JJF DF8[ CSNFZ AGX[P 5Z\T] VF DF8[ 5|EFZL
SFI"5F,S .HG[ZGM V[JM VlE5|FI CMJM HM.V[ S[ VFJF DH]ZM GMl8;GF ;FT lNJ; 5C[,F\ SFD SZTF CTF VG[ pST GMl8;GL TFZLBYL ;FT lNJ;GL
V\NZ VgI+ ZMHDNFZ D[/JJFGL l:YlTDF\ G CTFP SMg8=FS8Z[ VFJL GMl8;GL TFZLBYL ;FT lNJ;TL V\NZ VgI+ ZMHUFZ D[/JJFGL l:YlTDF\ G CTFP
SMg8=FS8Z VFJLGMl8;GL TFZLBYL VFJ SFD[ G ZFBL XSFI[, CMI T[JF DH]ZMG[ VgI :Y/[ SFD[ ZFBJFGM 5|ItG SZJM HM.V[P
G]SXFGGF J/TZGL ZSD AFATDF\ SFI"5F,S .HG[ZGF lG6"I ;FY[ SMg8=FS8Z ;\DT G CMI T[JF S[;DF4 VFJF lG6"IGL HF6 YIFGL TFZLBYL V[S
DCLGFGL V\NZ 5|EFZL VlW1FS .HG[ZG[ V5L, SZJF DF8[SMg8=FS8Z D]ST ZC[X[P VFJF S[;DF\ VWL1FS .HG[ZzLGM lG6"I VFBZL VG[ A\WGSTF" ZC[X[P
VFJF SFDGF SM. V5[l1FT OFINFGL G]SXFGL DF8[ SMg8=FS8Z CSSNFZ AGX[ GlCP
CLAUSE 15A : The contractor shall not be entitled to claim any compensation from Govt. on account of delay by Government in
the supply of materials entered in Schedule ‘A’ where such delay is caused by (I) Non-supply due to short allotment of quota in
case materials available under quota regulations. (ii) Difficulties relating to the supply of railway wagon (iii) Force majored. (iv)
Act of God. (v) Act of the country’s enemies or any other reasonable cause beyond the control of Government.
In the case of such delay in the supply of materials, Government shall grant such extension of time for the completion of the works
as shall appear to the Engineer-in-charge to be reasonable in accordance with the circumstances of the case. The decision of the
Engineer-in-charge as for the extension of time shall be accepted as final by the contractors. (As modified Vide R&BD. G.R. No.
TNC – 1096 IB – 143 (16) – C dated 11-1-99)
CLAUSE 16: Time limit for unforeseen claims :
The contractor shall not be entitled to any compensation from Government on any account unless where allowed by
the conditions of this contact. In such cases the contractor shall have to submit a claim in writing to the Engineer-in-
charge within one month of the cause of such claim occurring.
CLAUSE 17 : Action & compensation in case of bad work :
If at any time before the expire of Defects Liability period as detailed in Clause 17-A . It shall appear to the
Engineer-in-charge or his sub-ordinate in charge of the work that/any work has been executed unsound, imperfect or
unskilled workmanship or with materials of inferior quality or that any materials or articles provided by him for the
execution of the work are unsound , or of a quality inferior to that contracted for or are otherwise not in accordance
with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the contractor and
then notwithstanding the fact that the work, materials or articles complained for may have been passed, certified and
paid for the contractor shall be bound forthwith to rectify, or remove and reconstruct the work so specified in whole
or in part as the case may require, or if so required, shall remove the materials or articles so specified in whole or in
part and provide other proper and suitable materials or articles at his own charge and cost, and in the event of his
failing to do so within a period to be specified by the Engineer-in-charge in the written intimation aforesaid, the
contractor shall be liable to pay compensation at the rate of one percent on the amount of the estimate of the
rectification for every day not exceeding ten days during which the failure so. Continues and in the event of any such
failure as aforesaid continuing beyond ten days, the Engineer-in-Charge may rectify or remove, and re-execute the
work or remove and replace the materials complained of as the case may be at the risk and expense in all respects of
the contractor. Should the Engineer-in-chare consider that any such inferior work or materials as described above may
be accepted or made use of, it shall be within his discretion to accept the same at such reduced rates as he may fix
therefore.
However, the contractor shall be responsible for normal maintenance of the work till the final bill for the work is
prepared by the departmental Officer.
Clause 17A : Defect liability period :
The contractor shall be responsible to make good and remedy at his own expenses any defect which may develop or may be
noticed before the period mentioned hereunder from the certified date of completion. The Engineer-in-charge shall give the
contractor a notice in writing about the defects and the contractor shall make good the same within 15 days of receipt of the notice.
In the case of failure on the part of the contractor, the Engineer-in –charge may rectify or remove or re-execute the work at the risk
& cost of the contractor. The Engineer-in-charge shall be entitled to appropriate the whole or any part of the amount of security
deposit towards the expenses, if any, incurred by him in rectification, removal or re-execution. The Defects Liability period shall
be as under (a) for all works costing upto Rs. 50,000 (amount put to tender), period shall be 3 months from the certified date of
completion (b) for all works costing more than Rs. 50,000 and upto Rs. 1 Crore (amount put tender), period shall be 12 month
from the certified date of completion or one monsoon, whichever is later.(c) for major projects costing more than Rs. 1.00 Crore,
(amount put to tender) period shall be 36 months from the certified date of completion or three monsoons, whichever is later.
(d) for building works, the period specified in (a),(b) or (c) above OR elapse of monsoon period following the certified date of
completion, which ever is later. For the purpose of deciding the monsoon period, the 30th September may be treated as the last
date.
Clause 17 B : Free Maintenance Guarantee Period (only for Road works) :
The Scope of works also includes three years free Maintenance Guarantee Period from the certified date of the works. During this period, the
contractor shall be responsible to make good and remedy at his own expenses any defect which may develop or may be noticed for the work
carried out by him or due to the reasons attributed to him. The Engineer in charge shall give the contractor a notice in writing about the defects
with remedial majors and the contractor shall make good the same within period specified in the notice. In case of failure on the part of the
contractor to carry out the instructions of Engineer-in-charge, the Engineer-in-charge may rectify or remove of re-execute the works at his risk and
cost of the contractor. The Engineer-in-charge shall be entitled to appropriate the whole or any part of the
amount of security deposit to words the expenses, if any, incurred by him in rectification, removal or re-execution.
The contractor shall immediately recoup the amount so spent such that at any given time the security deposit shall be
maintained as laid down in the clause 1 of the contract. If contractor fails to recoup the amount of security deposit then Engineer in charge shall be
entitled to recover the amount spent over the above the amount of security deposit. The contractor shall furnish the Guarantee Bond as directed by
Engineer-in-charge on stamp paper of Rs.100/-
( Please see Special Condition of Contract)
Free Maintenance guarantee period of three years
- 23 -
(1) The contractor shall have to give three years free maintenance guarantee from the certified date of
completion. During the period contractor shall have to repair the damaged portion of the B.T. surface road at his risk and cost as per
direction of Engineer in charge. If B.T. surface during maintenance period of 3 years if warned out then agency shall have to provide
renewal coating as per tender item as directed by the Engineer-in-charge. The amount equivalent to 5% of each running bill shall be
withheld and will be released after thredeposited and will be released after the free maintenance guarantee period (i.e. 3 years) is over.
(2) The flakiness and elongation index (combined) for coarse aggregates under circumstances shall exceed the allowable limit set forth in
the relevant clause for the material in question.
(3) "2% of the amount eligible for the payment of bituminous items shall be with held till the miscellaneous items like earthwork in
embankment / cut t ing for side shoulders, side gutters, kilometer / indicator / guard stones, sign boards etc. are completed in all respect
by the contractor. After completion of the miscellaneous items, the above said 2% with held amount shall be released."
(4) Setting up of adequate laboratory & deployment of quality engineer.
The contractor shall have to set up the laboratory with adequate equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by engineers representative) by contractor in writing, Rs.2,00,000 shall be
withheld. The qualified quality engineer shall be deployed exclusive for this contract by the contractors. If quality engineer is not
deployed by contractor within one month after the date of work order, the amount equivalent to Rs.15,000 per month shall be recovered
till the actual deployment of quality engineer. The amount so recovered towards the deployment of quality engineer shall not be
refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/2006/35/C, Dtd.31/5/07 before final bill is paid.
CLAUSE 18: Work to be open to inspections –Contractor or responsible agent to be present. : -
All Works under or in course of execution or executed in pursuance of the contract shall, at all times be open to the inspection and
supervision of the Engineer-in-charge and his subordinates and the Contractor shall, at all times during the usual working hours,
and all other times for which reasonable notice of the intimation of the Engineer-in-charge or his subordinate to visit the works
shall have been given to the contractor , either himself be present to receive orders and instructions or have a responsible agent
duly accredited in writing present for that purpose. Orders given to the contractor’s duly authorised agent shall be considered to
have the same force and effect as if they had been given to the Contractor himself.
B\0 !( o T5F; DF8[ SFDM B]<,F ZFBJF AFAT o SMg8=FS8Z VYJF T[GF HJFANFZ V[Hg8[ CFHZ ZC[JF AFATo SMg8=FS8Z VgJI[ CFY 5Z CMI T[JF VYJF Y. ZC[,F VYJF YI[, TDFD
SFDGL CJF,FGF .HG[Z VG[ tIF\ T[GF TFAFGF SD"RFZLVM SM.56 ;DI[ T5F; VG[ N[BZ[B ZFBL XS[ T[JL ZLT[ AWF JBT DF8[ B]<,F ZFBJFGF ZC[X[ VG[ SFDSFHGF ZFA[TF D]HAGF ;DI
NZdIFG AWL JBT VG[[ CJF,FGF .HG[Z VYJF BFTFGF SD"RFZLVMG[ SFDGL D],FSFG ,[JFGF4 T[DGF .ZFNFG[ ,UTL JFHAL GMl8; VF5L CMI T[JF ALHF AWF JBT[ SMg8=FS8Z[ 5F[T[ VYJF T[
DF8[ ,[lBT VG[ IMuI ZLT VG[ VlWS'T SZ[,F T[DGF SM. HJFANFZ V[Hg8[ C]SD VG[ ;]RGFVM D[/JJF CFHZ ZC[J]\ 50X[P SMg8=FS8ZGF IMuI ZLT[ VlWS'T SZFI[,F V[Hg8G[ V5FI[, C]SDM
HF6[ S[SMg8=FS8ZG[ 5FTFG[ VF5JFDF\ VFjIF CMI T[D T[DGM VD, YX[ VG[ T[ V;ZSTF" ZC[X[P
CLAUSE 18-A
(i) G.R.B. & CD NO. RGN-6090-UO 24 (42)-C, dated 26-11-90.
Employment of a qualified site Engineer by the Contractor. The Contractor shall employ full-time technically qualified staff
during the execution of this work as under :-
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be executed is more than Rs.50
lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is more than Rs.15 lakhs but less than
Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but more than Rs.5 lacs.
4. Minimum one Diploma Civil Engineers for the work when the cost of work to be executed is less than Rs. 5 lakhs. The
Engineer so employed for the Government work must have sufficient experience to handle the work independently. Such an
Engineer shall have to stay at the site of work and he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of separate Engineer will not be
necessary provided that the Engineer partner himself attends the execution of the work on the site.
CLAUSE 19 : Notice to be given before work is covered up :
The contractor shall give not less than five day’s notice in writing to the Engineer-in-chare or his subordinate in charge of the work
before covering up or otherwise placing beyond the reach of measurement any work in order that the same may be measured and
correct dimensions there of taken before the same is so covered up or placed beyond the reach of measurement and if any work
shall be covered up or placed beyond the reach of measurement without such notice having and if any work shall be covered up or
placed beyond the reach of measurement without such notice having been given or consent obtained , the same shall be uncovered
at the contractor’s expenses and in default thereof no payment or allowance shall be made for such work or for the materials with
which the same was executed.
B\0 !) o SFD R6TZYL VFJZL ,[TF\ 5C[,F GMl8; VF5JF AFAT o
SM. 56 SFDGL R6TZYL VFJZL ,[TF\ 5C[,F S[ DF5 G ,. XSFI T[JL S1FFV[ SFD ,. HTF\ 5C[,F SMg8=FS8Z[ CJF,FGF .HG[ZGM VYJF SFDGM CJF,M
;\EF/TF T[DGF TFAFGF VlWSFZLG[ 5F\R lNJ;YL VMKL G CMI T[8,L D]NTGL ,[lBT GMl8; VF5JFGL ZC[X[P H[YL T[ SFDG[ R6TZYL VFJZL ,[JFI
VYJF DF5 G ,. XSFI T[JL S1FFV[ SFD ,. HJFI T[ 5C[,F T[GF DF5 ,.G[ T[GF ;FRF 5ZL6FDGL GM\W ,. XSFI VG[ CJF,FGF .HG[Z S[ SFDGM CJF,M
;\EF/TF T[DGF TFAFGF VlWSFZLGL ,[lBT ;\DlT D[/jIF l;JFI SMg8=FS8Z SM. 56 SFD T[ R6TZYL VFJZL ,[X[ GCL S[ DF5 G ,. XSFI T[JL S1FFV[
,. HX[ GCL VG[ VFJL GM8L; l;JFI VYJF ;\DlT D[/jIF l;JFI HM SM. 56 SFDG[ R6TZYL VFJZL ,[JFI]\ CX[ S[ 5CM\RL G XSFI TJL VYJF DF5 G
,. XSFI T[JL S1FFV[ ,. HJFI]\ CX[ TM T[J]\ SFD SMg8=FS8ZGF BR[" B]<,]\ SZFJL GF\BJFDF\ VFJX[ VG[ VF ZLT[ YI[,L S;]Z AN, VFJF SFD DF8[ VYJF
VFJ] SFD H[ DF,;FDFGYL YI] CMI T[ DF,;FDFG 5[8[ SM. R]SJ6L SZJFDF\ VFJX[ GCL S[ SM. ZSD DHZ[ VF5JFDF\ VFJX[ GCLP
CLAUSE 20:
If the contractor or his workmen, or servants shall break, deface, injure or destroy any part of the building or the work in a question
in/on which they may be working or any building , road, fence, enclosure or grassland or cultivated ground contiguous to the
premises on which the works or any part thereof is being executed or if any damage shall be done to the work from any causes
whatever before damage occurred/caused due to normal flood or rain or if any imperfections become apparent in it within three
months from the grant of a certificate of completion, final or otherwise by the Engineer-in-charge , the contractor shall make good
the same at own expenses or in default, the Engineer-in-charge may cause the same to be made good by other contractor, and
deduct the expenses (of which the certificate of the Engineer-in-charge shall be final ) from any sums that may thereafter become
due to the contractor or from his security deposit or the proceeds of sale thereof or a sufficient portion thereof.
CLAUSE 20A :
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of God, such as "Unprecedented
flood", volcanic eruption, earthquake or other convulsion of nature and other acts such as but not restricted to general strike,
- 24 -
invasion, the acts of foreign countries, hostilities, or war like operations before or after declaration of war, rebellion, military or
usurped power which prevent performance of the contract and which could not have been foreseen or avoided by a prudent person.
Note : “Unprecedented flood” means the flood crossing the High Flood Level of the past ........................ Year(s) which is on the
available record.
(Modified Vide R& B D.G.R. No/ TNC – 1096 – IB –143 – (16) – C dated 11-1-99)
CLAUSE 21: Contractor to supply plant, ladders, scaffolding etc. and is liable for damage arising from non-
provision of lights, fencing etc. :
The contractor shall supply at his own cost all materials (except such special materials if any, as may, in
accordance with the contract to be supplied from the Public Works Department Stores), plant, tools,
appliances, implements, ladders, cordage, tackle, scaffolding, and any temporary works which may be
required for the proper execution of the work whether in the original, altered or substituted form and
whether included in the specifications, or other documents forming part of the contract or referred to in
these conditions or not and which may be necessary for the purpose of satisfying or complying with
requirements of the Engineer-in-charge as to any matter or to which under these conditions he is entitled to
be satisfied or which he is entitled to require together with carriage there for to and from the work. The
contractor shall also supply without charge the requisite number of persons with the means and materials
necessary for the purpose of settings out works and counting , weighing and assisting in the measurement
or examination at any time and from time to time, of the work or the materials, failing this, the same may
be provided by the Engineer-in-charge at the expenses of the Contractor and the expenses may be deducted
from any money due to the Contractor under the contract or from his security deposit, or proceeds of sale
thereof or of a sufficient portion thereof. The contractor shall provide all necessary fencing and lights
required to protect the public from accident and shall also be bound to bear expenses of defence of every
suit, action or other legal proceeding, at law that may be brought by any person for injury sustained. Owing
to neglect of the above precautions and to pay any damages and costs which may be awarded in any such
suit, action or proceedings to any such person , or which may, with the consent of the Contractor, be paid
in compromising any claim by any such person.
B0 Z! o %,Fg84 ;L0LVM4 5F,BM lJU[Z[ SMg8=FS8Z[ 5]ZF\ 5F0JF AFATP T[DH NLJFAtTL4 JF0 JU[Z[GL HMUJF. G CMI T[G[ ,LW[ YTF
G]SXFG DF8[ SMg8=FS8Z CMJF AFAT o SMg8=FS8 VG];FZ sAF\WSFD :8MZDF\YL 5]ZM 5F0JFDF\ VFJ[ T[JF DF,;FDFG l;JFIf D]/ S[ O[ZOFZ
SZFI[,L S[ GJF :J~5GF VYJF SMg8=FS8ZGM V[S EFU AGL ZC[TF VUZ TM VF XZTMDF\ H[GM p<,[B SZFI[, CMI T[JL lJUTMDF\ S[ ALHF
N:TFJ[HM VG[ VF XZTM VgJI[ H[ SM. AFAT V\U[ CJF,FGF .HG[ZGL H~ZTM ;\TMQFFI VYJF 5F,G YFI T[JM VFU|C ZFBJFGM T[GM CS
CMI VG[ H[G[ SFDGF :Y/[ S[ tIF\YL VgI :Y/[ B[\RFD6 ;lCT ZH] SZFJJFGM H[ T[ CS CMI T[JM AWM DF,;FDFG4 %,Fg84 VMHFZ4 ;FDU|L4
;FWGM4 ;L0LVM4 UZU0LVM4 5F,BM4 SFD IMuI ZLT[ CFY WZL XSFI T[ ;F~ H~ZL V[JF ALHF SFDR,Fp ;FWGM SMg8=FS8Z[ 5FTFGF BR["
5]ZF 5F0JFGF ZC[X[P SFDM DF8[GL CN GSSL SZJF DF8[ VG[ SFD VYJF DF,;FDFGGL SM.56 JBT[ VG[ JBTMJBT4 U6TZL SZJFDF\ TM,
SZJFDF\ VG[ DF56L S[ T5F;6L DF\ DNN~5 YJF DF8[ H~ZL V[JF ;FWGM VG[ DF,;FDFG ;lCT HM.TL ;\bIFDF DF6;M4 SM. 56 BR["
SZFJL ,LWF lJGF4 SMg8=FS8Z[ 5]ZF 5F0JFGF ZC[X[P VFD G SZTF V[ V\U[GL HMUJF. CJF,FGF .HG[Z SMg8=FS8ZG[ BR[" SZFJL ,[X[ VG[ T[
lJX[ BR[",L ZSD4 SMg8=FS8 C[9/ SMg8=FS8ZGL ,[6L YTL SM. ZSDDF\YL S[ T[GL HFDLG VGFDTDF\YL S[ T[GL VGFDTGF VYJF T[GF 5]ZTF
EFUGF J[RF6DF\YL p5H[,L ZSDDF\YL SF5L ,[JFDF\ VFJX[P HFC[Z HGTFG[ VS:DFT G YFI T[ DF8[ SMg8=FS8Z[ H~ZL JF0 VG[ NLJFAtTLGL
HMUJF. SZJFGL ZC[X[ VG[ p5ZGL ;FJR[TL ZFBJF V\U[GL A[NZSFZLG[ SFZ6[ YI[, .HF V\U[ SF[.56 jIlST4 H[ NFJM DF\0[4 5U,F\ ,[
VYJF ALHL SFG]GL SFI"JFCL SZ[ T[GF AFRFJG]\ BR" VG[ VFJF SM. NFJF45U,F\ VYJF SFI"JFCLDF\ T[JL SM. jIlSTG[ H[ SF\. G]SXFGL S[ BR"
VF5JFG]\ R]SFNFDF\ H6FJFI T[ VYJF VFJF SM. jIlSTGF SM. 56 CSNFJFGL SMg8=FS8ZGL ;\DlTYL ;DFWFG YTF\ H[ ZSD R]SJJFDF\ VFJ[
T[G]\ BR" EMUJJF 56 SMg8=FS8Z A\WFI[, ZC[X[P
CLAUSE 21A: The Contractor shall provide suitable scaffolds and working platforms, gangways and
stairways, and shall comply with the following regulation in connection therewith.
B\0 Z!PSP SMg8=FS8Z[ IMuI 5F,BM VG[ SFRF DF\R0F4 HJFvVFJJF DF8[GF 5Fl8IF VG[ ;L0LGM HMUJF. SZJFGL ZC[X[ VG[ T[ V\U[ GLR[
D]HAGF lGIDMG]\ 5F,G SZJFG]\ ZC[X[P
(a) Suitable scaffolds shall be provided for workmen for all works that cannot be safely done from a ladder
or by other means.
sSf ;L0L p5ZYL VYJF ALHF SM. ;FWG wJFZF ;,FDTL5]J"S G SZL XSFI T[JF AWF SFD DF8[ SFDNFZM ;F~ IMuI 5F,BMGL HMUJF.
SZJFGL ZC[X[P
(b) A scaffold shall not be constructed, taken down or substantially altered except
(i) Under the supervision of a competent and responsible person.
sBP!f SFI"1FD VG[ HJFANFZ jIlSTGL N[BZ[B C[9/ T[ l;JFI4
(ii) appointed by contractor and by competent workers possessing adequate experience in this kind of
work.
Zf SMg8=FS8Z wJFZF lGDFI[, VG[ VG]EJ WZFJTF SFI"1FD SFDNFZM wJFZF YT]\ CMI T[ l;JFI4 SM.56 5F,S AF\WJL GCL\4 pTFZJL GCL\ S[
T[DF\ DCtJGF O[ZOFZ SZJF GlCP
(c) All scaffolds and appliances connected therewith and all ladders shall
sUf AWL 5F,BM VG[ T[GF ;FY[ ;\S/FI[, ;FDU|L VG[ AWLH ;L0LVM
- 25 -
(i) be of sound material !P DHA]T RLHJ:T]GL AG[,L CMJL HM.V[P
(ii) be of adequate strength having regard to the loads and strains to which they will be subjected and
Zf T[GF 5ZGF VFJGFZF JHG VG[ W;FZFG[ BDL XS[ T[8,L DHA]T CMJL HM.V[ VG[
(iii) be maintained in proper condition #f T[G[ ;FZL l:YlTDF\ ZFBJFGL ZC[X[P
(d)Scaffolds shall be so constructed that no part thereof can be displaced in consequence of normal use.
s3f 5F,BM V[JL AF\WJFGL ZC[X[ S[ ;FDFgI J5ZFXYL T[GM SM.56 EFU K]8M 50L GHFIP
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be evenly distributed.
sRf 5F,BM 5Z JWFZ[ 50T]\ JHG D]SJ] GlC VG[ XSI CMI tIF\ ;]WL T[ JHG ;DU| 5F,B 5Z V[S;ZB]\ JC[RL GF\BJ]\
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to ensure the strength
and stability of the scaffolds.
sKf 5F,BM 5Z DF, pRSJF DF8[GF lUIZ UM9JTF 5C[,F 5F,BMGL DHA]TF. VG[ 8SFp56FGL BFTZL SZJFGL BF; ;FJR[TL ,[JLP
(g) Scaffolds shall be periodically inspected by a competent person .
sHf SFI"1FD jIlST wJFZF JBTMJBT 5F,BMGL T5F; SZJFGL ZC[X[P
(h) Before allowing a scaffold to be used by his workmen, the Contractor shall, whether the scaffold has
been erected by his workmen or not, take steps to ensure that it complies fully with the regulation herein
specified.
shf T[GF SFDNFZMV[ 5F,BM AF\WL CMI S[ G CMI TM 56 5F[TFGF SFDNFZMG[ T[ 5F,BGM p5IMU SZJF N[T\ 5C[,F SMg8=FS8Z[ T[JL 5F,BM
VCL\ H6FJ[, lJlGIDM VG];FZ AZFAZ CMJF AFATGL BFTZL SZJFGL ZC[X[P
( i ) Working platforms, gangways shall –
(i) be so constructed that no part thereof can dug unduly or unequally.
s8f SFRF DF\R0F HJFvVFJJF DF8[GF 5Fl8IF VG[ ;L0LVM AF\WTL JBT[ GLR[GL AFATM bIF,DF\ ZFBJFGL ZC[X[P
!P T[GM SM. 56 EFU JW] 50TM S[ V;DFG ZLT[ h]SL G HJM HM.V[P
(ii) be/so constructed and maintained having regard to the prevailing conditions as to reduce as far as
practicable risks of persons tripling or slipping and
Zf DF6;M UA0L S[ ,5;L 50[ T[J] HMBD AG[ T[8,] VMK]\ ZFBJF DF8[ 5|JT"TF ;\HMUM VG];FZ T[ AF\WJF VG[ HF/JJF4 VG[
(iii) be kept free from any unnecessary obstruction.
#P SM.56 HFTGF lAG H~ZL VJZMWYL D]ST ZFBJFP
( j ) In the case of working platforms, gangways working places and stairways at a height exceeding 2.00
Mtr.(to be specified)
s9f ZP__ DL8Z YL JW] pRF\.JF/F SFRF DF\R0F4 HJFvVFJJF DF8[ 5Fl8IF SFDGL HuIF VG[ ;L0LVMGL G[R[ D]HAGL HMUJF. ZC[X[P
(i ) every working platform and every gangway shall be closely boarded unless other adequate measures
are taken to ensure safety.
!f ;,FDTLGF ALHF 5]ZTF 5U,F\ G ,[JFIF CMI TM NZ[S SFRM DF\R0M VG[ HJF VFJJF DF8[G\] NZ[S 5Fl8\I] ,UM,U H0[,\] CMJ]\ HM.V[P
(ii) every working platform and every gangway shall have adequate width, and
Zf NZ[S SFRF DF\R0F VG[ HJF v VFJJF DF8[GF 5Fl8IF4 5]ZTL 5CM/F. JF/F CMJF HM.V[4 VG[
(iii) every working platform, gangway, working place and stairway shall be suitably fenced.
#f NZ[S SFRF DF\R0F VG[ HJFvVFJJF DF8[GF 5Fl8IF\ SFDGL HuIF VG[ ;L0LVMG[ IMuI S9[ZF CMJF HM.V[P
(k) Every opening in the floor of a building or in a working platform shall, except for the time and to the
extent required to allow the access of person or the transport or shifting of materials be provided with
suitable means to prevent the fall of persons or material.
s0f DF6;M VFJL H. XS[ VYJF DF,;FDFGL C[ZO[Z Y. XS[ S[ V[S :Y/[YL ALH[ :Y/[ ,. H. XSFI T[8,F JBT VG[ T[8,F 5]ZTL DSFGGL
OZ; S[ SFRF DF\R0F 5ZGL 5|tI[S B]<,L HuIF 5Z V[JF IMuI ;FWGM D]SL ZFBJF S[ H[YL SM. DF6; S[ DF,;FDFG 50L G HFIP
(I)When persons are employed on a roof where there danger of falling from a height exceeding 3.00
Mtr.(to be specified ) meters suitable precaution shall be taken to prevent the fall of persons or material.
s-f HIF\YL 50L HJFGM EI CMI T[JL #P__ sH6FJJLf DL8ZYL JW] p\RF.GF KF5ZF\ 5Z DF6;MG[ SFD[ ZFBJFDF\ VFjIF CMI tIF\YL DF6;M
S[ DF,;FDFG 50L G HFI T[ DF8[ ;FJR[TLGF IMuI 5U,F\ ,[JFGF ZC[X[P
(m) Suitable precautions shall be taken to prevent persons being struck by articles which might fall from
scaffold or other working places.
sTf 5F,BM S[ SFDSFHGL ALHL HuIFVM 5ZYL 50[ T[JL RLHJ:T]VMYL DF6;G[ .HF G YFI T[DF8[ ;FJR[TLGF\ IMuI 5U,F\ ,[JFP
(n) Safe means of access shall be provided to all working platforms and other working places.
sYf AWF SFRF DF\R0F VG[ SFDGL ALHL HuIFVMV[ ;C[,F.YL HJF DF8[ ;,FDT DFUM"GL HMUJF. SZJFGL ZC[X[P
CLAUSE 21B : The contractor shall comply with the following regulations as regards the hoisting
appliances to be used by him
B\0 Z!P BP SMg8=FS8Z JHG pRSJFGF ;FWGM JF5Z[ T[ ;A\WDF\ T[6[ GLR[GF lGIDMG]\ 5F,G SZJFG]\ ZC[X[P
(a) Hoisting machines and tackle including their attachments, anchorages and supports shall –
- 26 -
sSf JHG pRSJFGF I\+M VG[ UZU0LJF/F I\+4 T[DGL ;FY[GF HM0F6M4 ,\UZ DF8[GF ;FDFG VG[ 8[SF GLR[ D]HAGF CMJF HM.X[ ov
(i) be of good mechanical construction, sound material and adequate strength and free from patent defect,
and
s!f ;FZL IF\l+S ZRFGFJF/F\4 DHA]T J:T]GF T[DH 5]ZTL TFSFTJF/F VG[ N[BLTL SM. BFDL lJGFGF VG[
(ii) be kept in good repair and in working order
Zf ;FZL N]Z:T CF,TFD\F VG[ RF,] l:YlTDF\ ZFBJF HM.X[P
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable
quality and adequate strength and free from patent defect.
sBf DF,;FDFGG[ p\R[ R0FJJF S[ GLR[ pTFZJF VYJF ,8STM ZFBJFGF ;FWG TZLS[ J5ZFT] NMZ0]\ IMuI HFT]\ VG[ 5]ZTL DHA]TF.JF\/]\
T[DH N[BLTL ZLT[ BFDL lJGFG]\ CMJ]\ HM.V[P
(c) Hoisting machines and tackles shall be examined and adequately tested after erection on the site and
before use and be re-examined in position at intervals to be prescribed by Engineer-in-charge.
sUf JHG pRSJFGF\ I\+M VG[ UZU0LJF/F I\+G[ SFDGF :Y/[ UM9jIF AFN VG[ p5IMUDF\ ,LWF 5C[,F T5F;L HM.G[ 5]ZTF 5|DF6DF\
RSF;L ,[JFGF ZC[X[4 T[DH CJF,FGF .HG[Z lGIT SZ[ T[JF\ ;DIF\TZ[4 UM9J[,L l:YTLDF\ T[GL O[Z T5F; SZJFGL ZC[X[P
(d) Every chain, ring, hook, shackle, swivel and pulley block used in hoisting or lowering materials or as a
means of suspension shall be periodically examined.
sWf DF,;FDFG p\R[ R0FJJFGF S[ GLR[ pTFZJFGF S[ ,8STM ZFBJFGF ;FWG TZLS[ J5ZFTF 5|tI[S ;F\S/4 ZL\U4 VF\S0M S0L4 GS]RF VG[
5],La,MS JBTMJBT T5F;JFP
(e) Every crane driver or hoisting – appliance operator shall be properly qualified.
sRf 5|tI[S S|[.G v 0=F.JZ S[ JHG pRSJFGF I\+GF RF,S IMuI ,FISFTJF/F CMJF HM.V[P
(f) No person who is below age of 15 years shall be in control of any hoisting machine, including any
scaffolds, nor shall give signals to the operator.
sKf !5 JQF"YL GLR[GL SM. 56 jIlSTG[ SM. 5F,S ;lCT JHG pRSJF SM. I\+GF lGI\+S TZLS[ VYJF VM5Z[8ZG[ lGXFGLYL ;]RGF
VF5JF4 SFD[ ZFBL XSFX[ GCLP
(g) In the case of every hoisting machine and of every chain, ring hook, shackle, swivel and pulley block
used in hoisting or lowering or as a means of suspension the safe working load shall be ascertained by
adequate means.
sHf JHG pRSJFGF 5|tI[S I\\+ VG[ DF,;FDFG p\R[ R0FJJFGF S[ GLR[ pTFZJFGF S[ ,8SFJL ZFBJFGF ;FWG TZLS[ J5ZFTL 5|tIS[ ;F\S/4
ZL\U4 S0L4 GS]RF VG[ 5],Lva,MSGL ;,FDT ZLT[ JHG p9FJJFGL XlST S[8,L K[ T[ IMuI ;FWGM J0[ GSSL SZJFG]\ ZC[X[P
(h) Every hoisting machine and all gears referred to in preceding regulation shall be plainly marked with
the safe working load.
shfVFU/GF lJlGDI H[DF\ H6FJ[, JHG pRSJFGF 5|tI[S I\+ VG[ AWFH lUIZ 5Z T[ ;,FDT ZLT[ S[8,]\ JHG p9FJL XS[ T[D K[P T[ RMbB]
,B[,] CMJ]\ HM.V[P
( i ) In the case of hosting machine having a variable safe working load, each safe working load and
conditions under which it is applicable shall be clearly indicated.
s8f H]NF\ H]NF\ JHG ;,FDT ZLT[ pRSL XSFTF4 pRSJFGF I\+ 5Z4 ;,FDT ZLT[ pRSL XSF\T] 5|tI[S JHG VG[ S. CF,TDF\ I\+G[ T[ ,FU]
50X[ T[ :5Q8 NXF"JJFG]\ ZC[X[P
( j ) No part of any hoisting machine or gear referred to in regulation ‘g’ above shall be loaded beyond the
safe working load except for the purpose of testing.
s9f p5ZGF lJlGID H[DF\ H6FJ[, JHG pRSJFGF SM. 56 I\+ S[ lUIZGF SM. 56 EFU 5Z RSF;6L DF8[ H~ZL CMI T[ l;JFI4 ;,FDT
JHG SZTF\ JW] JHG ,FNJ]\ GlCP
(k) Motors, gears, transmissions , electric wiring and other dangerous parts of hoisting appliances shall be
provided with sufficient safeguards.
s0f JHG pRSJFGF ;FWGGL DM8ZM4 lUIZ4 lJW]TJFCS ;FWGM4 JLH/LGF TFZ VG[ HMBDL EFU[ DF8[ 5]ZL ;,FDTLGL HMUJF. SZJFGL
ZC[X[P
(l) Hoisting appliances shall be provided with such means as will reduce to a minimum the risk of the
accidental descent of the load.
s-f SM. JHG VS:DFT GLR[ ;ZSL 50[ T[J\] HMBD VMKFDF\ VMK]\ ZC[ T[ 5|DFZGL SM.S ;UJ0 JHG pRSJFGF ;FWGDF\ SZJFGL ZC[X[P
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a suspended load
becoming accidentally displaced.
sTf ,8STF ZFB[,F JHGDF\YL SM.56 EFU VS:DFT K]8M 50L HJFG]\ HMBD VMKFDF\ VMK]\ ZC[ T[ DF8[ 5]ZTL ;FJR[TL ZFBJFGL ZC[X[P
CLAUSE 22 : Measures for Prevention of Fire :
The contractor shall not set fire to any standing jungle, tree bush wood or grass without a written permit
from the Engineer-in-charge .
When such permit is given, and also in all cases when destroying cut or dug up tree, bush wood, grass etc.
by fire, the contractor shall take necessary measures to prevent such fire spreading to or other-wise
- 27 -
damaging surrounding property. When such permit is given and also in all cases when destroying cut or
dug up tress, bush wood, grass etc. by fire, the contractor shall take necessary measures to prevent such fire
spreading to or other-wise damaging surrounding property.
CLAUSE 23 : Liability of contractors for any damages done in or outside work area :
Compensation for all damage done intentionally or unintentionally by Contractor’s laborers whether in or
beyond limits of Government property including any damage caused by the spreading of fire mentioned in
the clause 22, shall be estimated by the Engineer-in-charge, or such other Officer as he may appoint and
the estimates of the Engineer-in-charge , subject to the decision of the Superintending Engineer, on appeal
, shall be final and the contractor shall be bound to pay the amount of the assessed compensation on
demand, failing which the same will be recovered from the Contractor as damages in the manner
prescribed in clause 1 or deducted by the Engineer-in-charge from any sums that may be due or become
due from Government to the contractor under this contract or otherwise.
B\0 Z#P SFDGF lJ:TFZ VYJF T[GF ACFZ YI[, SM. 56 G]SXFG DF8[SMg8=FS8Z HJFANFZ CMJF AFAT
B\0 ZZDF\ H6FjIF 5|DF6[ VFU 5|;ZJFYL YI[, SM. 56 G]SXFG ;lCT SMg8=FS8ZGF DH]ZMV[ .ZFNF5]J"S S[ VHF6TF\ ;ZSFZL lD,STGL
CNGL V\NZ S[ ACFZ SZ[,F AWFH G]SXFGGF J/TZGM V\NFH CJF,FGF .HG[Z VYJF V[D6[ GLD[,F ALHF SM. VlWSFZL SF-X[ VG[
CJF,FGF .HG[ZGM VF V\NFH4 V5L, YI[4 VlW1FS .HG[ZGF R]SFNFG[ VFlWG4 VFBZL U6FX[ VG[ DFU6L SZTF\ VFSFZFI[,L J/TZGL
T[JL ZSD R]SJJF DF8[SMg8=FS8Z A\WFI[, ZC[X[ VG[ T[D SZJFDF\ S;]Z SZX[ TM T[JL ZSD B\0 ! DF\ 9ZFJ[,L ZLT[ G]SXFGL TZLS[SMg8=FS8Z
5F;[YL J;], SZJFDF\ VFJX[ VYJF VF SMg8=FS8 C[9/ VgIYF ;ZSFZ 5F;[ ,[6L YTL S[ CJP 5KL ,[6L YFI T[JL ZSDDF\YL CJF,FGF
.HG[Z SF5L ,[X[P
The Contractor shall bear the expenses of defending any action or other legal proceeding that may be
brought by any person for injury sustained by him owing to neglect of precautions to prevent the spread of
the fire and he shall also pay the damages and cost that may be awarded by the court in consequence.
VFU 5|;ZTL V8SFJJF ;F~ ;FJR[TLGF 5U,F\ ,[JFDF\ YI[, A[NZSFZLG[ 5lZ6FD[ SM. jIlSTG[ YI[, .HF DF8[ 5U,F\ ,[ S[ ALHL SFG]GL
SFI"JFCL SZ[ TM T[GL ;FD[GF ARFJG]\ BR" SMg8=FS8Z[ EMUJJFG]\ ZC[X[ VG[ T[JL SFI"JFCLG[ 5ZL6FD[ SM8" TZOYL R]SFNM VF5TF\ T[ G]SXFGL
VG[ BR" EZJFG]\ YFI T[ T[D6[ R]SJJFG]\ ZC[X[P
CLAUSE 24 : Deleted
CLAUSE 25 : Deleted
CLAUSE 26 : Work not to be sublet. Contract may be rescinded and security deposit forfeited for
subletting it without approval or for bribing a public officer or if contractor becomes insolvent :
The contract shall not be assigned or sublet without the written approval of the Engineer-in-charge. And if
the contractor shall assign or sublet his contract or attempt to do so or become insolvent or commence any
proceeding to get himself be adjudicated an insolvent or make any compromisation with his creditors, or
attempt to do so, the Engineer-in-charge may, by notice in writing rescind the contract, Also if any bride,
gratuity , gift loan, perquisite, reward or advantage, pecuniary or otherwise, shall either directly or
indirectly be given, promised or offered by the contractor, or any of his servants or agents to any public
officer or person in the employ of Government in any way relating to his office or employment, or if any
such officer or person shall become in any way directly or indirectly interested in contract, the Engineer-
in-charge may thereupon by notice in writing rescind the contract. In the event of contract being rescinded,
the security deposit of the contractor shall thereupon stand forfeited and be absolutely at the disposal of
Government and the same consequence shall ensure as if the contract had been rescinded under clause 3
hereof and in addition the contractor shall not be entitled to recover or be paid for any work therefore
actually performed under the contract .
B\0 Z& o AF\WSFD 5[8F EF0[ G VF5JF AFAT 4 D\H]ZL lJGF 5[8F EF0[ VF5JFYL VYJF ;ZSFZL VlWSFZLG[ ,F\R VF5JF DF8[
VYJF SMg8=FS8Z GFNZ YI[YL SMg8=FS8 ZN YFI VG[ HFDL VGFDT H%T YJF AFAT o
CJF,F .HG[ZGF l,lBT 5ZJFGUL l;JFI SMg8=FS8 SM.G[ V[;F.G SZL XSFX[ S[ 5[8FEF0[ VF5L XSFX[ GCL4 VG[SMg8=FS8Z T[DGM SMg8=FS8Z
V[;F.G SZX[ VYFJ 5[8FEF0[ VF5X[ S[ T[D SZJFGM 5|ItG SZX[ S[ GFNZ AGX[ S[ 5MTFG[ GFNZ SZFJJF DF8[GL SM. SFI"JFCL SZX[ S[
5FTFGF ,[6JFZM ;FY[ SM. 5TFJ8 SZX[ S[ T[D SZJFGM 5|ItG SZX[ TM CJF,FGF .HG[Z l,lBT GM8L; VF5LG[SMg8=FS8 ZN SZL XSX[P J/L
SMg8=FS8Z S[ T[DGF SM. GMSZ S[ V[Hg8 SM. ;ZSFZL VlWSFZLG[ VYJF ;ZSFZL GMSZLDF\C[GF SM. 56 jIlSTG[ T[GF CM¡F S[ HMSZLGL ~V[
SM.56 5|SFZGL ,F\R4 Al1F;4 E[84 VG],FE4 .GFD S[ VFlY"S ALHFSM. 5|SFZGF ,FE 5|tI1FS[ 5ZM1F ZLT[ VF5X[4 VF5JFG]\ JRG
VF5X[ S[ VF5JFGL T{IFZL ATFJX[ VYJF VFJF SM. VlWSFZL S[ jIlST 5|tI1F S[ 5ZM1F ZLT[ SMg8=FS8DF\ lCT WZFJTF YX[ TM CJF,FGF
- 28 -
.HG[Z l,lBT GM8L; VF5LG[ SMg8=FS8 ZN SZL XSX[P VFJL ZLT[ SMg8=FS8 ZN YTF\ SMg8=FS8ZGL HFDLG VGFDT H%T YI[, U6FX[4 VG[ T[
;\5]6"56[ ;ZSFZ C:TS ZC[X[ VG[ VF SZFZGF B\0v# C[9/ HF6[ S[SMg8=FS8 ZN SZJFDF\ VFjIM CMI T[JF H T[GF 5lZ6FDM VFJX[ VG[
JW]DF\ SMg8=FS8 C[9/ BZ[BZ SZ[,F SM. 56 SFD DF8[ SM. ZSD J;], SZJFG[ S[ R]ST[ ,[JFGM SMg8=FS8ZG[ CSS ZC[X[ GlCP
CLAUSE 27: Sums payable by way of compensation to be considered as reasonable compensation
without reference to actual loss :
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Government without reference to the
actual loss or damage sustained and whether any damage has or had not been sustained.
B\0 Z* o BZ[BZ UI[, BM8G[ ,1FDF\ ,LWF l;JFI J/TZ~5[ R]SJJFGL YTL ZSDG[ JFHAL J/TZ U6JF AFAT o
BZ[BZ BM8 S[ G]SXFGG[ ,1FDF\ ,LWF l;JFI VG[ SM. G]SXFG YI]\ CMI S[ G YI]\ CMI TM 56 XZTMDF\GL SM.56 XZT C[9/ SMg8=FS8Z[
J/TZ~5[ R]SJJFGL YTL TDFD ZSDG[ JFHAL J/TZ U6JFDF\ VFJX[ VG[ T[G[ ;ZSFZ DF8[ p5IMUDF\ ,[JFX[P
CLAUSE 28 : Change in the constitution of firm to be notified :
In the case of a tender by partners, any change in the constitution of a firm shall be forthwith notified by
the Contractor to Engineer-in-charge for his information.
B\0 Z( o 5[-LGF A\WFZ6DF\ SM. O[ZOFZ YI[ T[GL HF6 SZJF AFAT o
EFULNFZMV[ 8[g0Z EI]" CMI T[ S[;DF\ 5[-LGF A\WFZ6DF\ SM. O[ZOFZ YTF\ SMg8=FS8Z[ CJF,FGF .HG[ZG[ T[DGL HF6 VY[" T[JF O[ZOFZ V\U[
TZT DFlCTUFZ SZJFGF ZC[X[P
CLAUSE 29: Works to be under directions of Superintending Engineer :
All works to be executed under the contract shall be executed under the direction and subject to the
approval in all respects of Superintending Engineer of the Circle for the time being, who shall be entitled
to direct at what point or points and in what manner they are to be commenced and from time to time
carried on.
B\0 Z) o VlW1FS .HG[ZGL ;]RGF C[9/ SFD SZJF AFAT o
SMg8=FS8 C[9/ SZJFGF AWFH SFD ;S",GF H[ T[ JBTGF VlW1FS .HG[ZGL ;]RGF VG[ C[9/ TDFD AFATM DF8[ T[DGL D\H]ZLG[ VFWLG ZCLG[
SZJFGF ZC[X[P VF SFD SIF :Y/[ S[ :Y/MV[ VG[ S[JL ZLT[ X~ SZJF JBTMJBT S[JL ZLT[ VFU/ W5FJJF T[ V\U[ ;]RGF VF5JF VlW1FS
.HG[Z CSSNFZ ZC[X[P
CLAUSE 30 : (1) Disputes to be referred to Tribunal :
The disputes relating to this contract, so far as they relate to any of the following matters, Whether such
disputes arise during the progress of the work or after the completion or abandonment thereof, shall be
referred to the Arbitration Tribunal, GujaratState.
(i)The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the site
thereof or belonging to the contractor or procured by him an intended to be used for execution of the work
or any part thereof possession of which may have been taken by the Engineer-in-charge under the said
clause-5
(ii) The Reduction in rates made by the Engineer-in-Charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of payment for any class of work which is included in the additional or altered work carried
out by the contractor in accordance with the instructions of the Engineer-in-Charge under clause 14 and the
rates for which is to be determined under the said clause 14.
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-Charge under clause 15, and/or the amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the event of
his failure to rectify, remove or reconstruct the work within the period specified in the written intimation or
the amount of expenses incurred by the Engineer-in-Charge under the said clause 17 in rectifying,
removing or re-executing the work or in removing and replacing the materials or articles complained of .
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause 17 for the inferior work or
materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimated and assessed under clause 23.
(viii)The amount payable to the contractor for the work carried out under clause 33 in accordance with the
instructions and the requirements of the Engineer-in-Charge in a case where there are no specifications .
(2) The provision of Section-21 of the GPWD dispute Arbi. Tribunal Act –92 & order issued by the Govt. in
connection with this Act will now apply for Arbitration (As per Government in N. & W.R.D. letter No.
SUT/1090/2679/K2 dtd. 9/2/94 .
(3) The provision of Arbitration Act .,shall in so far as they are inconsistent with the provision of this act cease of to
apply to any dispute arising from a works contract and all arbitration proceedings in relation to such dispute before an
arbitrator, court of authority shall stand transferred to the Tribunal.
- 29 -
(4) The awards declared by the arbitrator should be speaking award, giving reasons and calculations for every item of
claims. The decision will have to be implemented by all the departments of the State Government and Public Sector
Enterprises of Gujarat. (Resolution F. D. No. PB/1088/735/KT/Sachivalaya/Gandhinagar 5th October 1988.)
(5) Incase of dispute leading to the contractor or Government of Gujarat approaching to Court of Law, it shall be
within the jurisdiction where the site of work is situated.
(6) The reference to arbitration proceeding under this clause shall not
(i) affect the right of the Engineer-in-charge under clause 5 to take possession of all or any tools plants
materials and stores in or upon the works of site thereof belonging to the contractor or procured by him and
intended to be used for the execution of the work or any part thereof.
(ii) Preclude the Engineer-in-charge from utilising the materials purchased by the contractor in any work or
from removing such materials to other places, during the period the work is stopped or suspended in
pursuance of notice given to the contractor under clause 15
(iii) Entitle the contractor to stop the progress of the work or the carrying out the additional or altered work
in accordance with the provisions of clause 14 or as the case may be or clause 33.
CLAUSE 31 : Deleted
CLAUSE 32 : Lump sum in estimates :
When the estimate on which a tender is made includes lump sum in respect of part of the work, the
contractor shall be entitled to payment in respect of the items of work involved or the part of the work in
question at the same rates as are payable under this contract for such items, or if the part of the work in
question is not in the opinion of the Engineer-in-charge capable of measurement the Engineer-in-charge
may , as his discretion, pay the lump sum amount entered in the estimate and the certificate in writing of
the Engineer-in-charge shall be final and conclusive against the contractor with regard to any sum or sums
payable to him, under the provisions of this clause.
B\0 #Z o V\NFHDF\GL prRS ZSDMo
H[ V\NFHGF VFWFZ[ 8[g0Z T{IFZ SZJ]\ CMI T[DF\ HM SFDGF VD]S EFUM V\U[ prRS ZSDGM ;DFJ[X YTM CMI TM VFJL AFATM DF8[ VF
SMg8=FS8 C[9/ R]SJJF5F+ CMI T[H NZ[4 YI[, SFDGL AFATM DF8[ pST SFDGF SM. EFU DF8[ R]SJ6L D[/JJF SMg8=FS8Z CSSNFZ ZC[X[4
VYJF CJF,FGF .HG[ZGF DT[ pST SFDGF T[ EFUG]\ DF5 ,. XSFI T[D G CMI4 TM CJF,FGF .HG[Z 5FTFGF :JlJJ[S VG];FZ V\NFHDF\
GM\WFI[,L prRS ZSD R]SJL XSX[ VG[ VF B\0GL HMUJF. C[9/ SMg8=FS8Z G[ R]SJJF5F+ YTL ZSD S[ ZSDMG[ ,UT]\ CJF,FGF .HG[ZG]\
l,lBT 5|DF65+ T[GF DF8[ VFBZL VG[ lG6F"IS ,[BFX[P
CLAUSE 33 : Action where no specifications :
In the case of work for which there is no such specification, such work shall be carried out tin accordance
with the Divisional Specification and in the event of there being no Divisional Specifications, then, in such
case the work shall be carried out in all respects in accordance with the instructions and requirements of
the Engineer-in-charge.
B\0 ## o SM. lJUTM G VF5L CMI tIFZ[ ,[JFG\F 5U,F o
SM. lJUTM G CMI T[JF 5|SFZGF SFDGL AFATDF\ T[JL SFD l0lJhGGL lJUTM VG];FZ CFY WZJFG]\ ZC[X[ VG[ l0lJhGGL lJUTM G CMI
tIFZ[ T[J\] SFD TDFD ZLT[ CJF,F .HG[ZGL ;]RGFVM VG[ H~ZLIFT VG];FZ CFY WZJFG] ZC[X[P
CLAUSE 34 : Definition of work :
The expression “work” or “works” where used in these conditions shall, unless, there be something in the
subject or context repugnant to such construction to mean the work, or the works, contracted to be
executed under or in virtue of the contract, whether temporary or permanent and whether original, altered,
substituted or additional .
B\0 #$ o SFDGL jIFbIF o
VF XZTMDF\ J5ZFI[, SFD VYJF XaN5|IMU lJQFIGF ;\NE"DF\ SX]\ lJ~wW G CMI TM SFDR,Fp S[ SFIDL VG[ D]/ ;]WFZ[,F4 AN,JFDF\
VFJ[,F S[ JWFZFGF SMg8=FS8 C[9/ S[ SMg8=FS8ZGL ~V[ SZJFGF YTF\ SFD S[ SFDM V[JM YX[P
CLAUSE 35 : Non refund of quarry fees & Royalties :
The contractor shall pay the royalty to the competent authority / local body as per rules. The contractor
shall furnish quarterly the statement showing quantity of quarried materials, from whom purchased ( with
full address of the seller ) and copies of bills for purchase to the District Officer of the Mining and Geology
Department or authority competent to levy royalty in the area of work. Contractor shall also furnish such
additional information as regard royalty payment to the royalty authority. The royalty charges paid shall be
borne by the Contractor and shall not be reimbursed by the Executive Engineer (Authority :- R & BD
Circular No. TNC – 2286 – UO – 39 (19) – C dated 23-10-1989.)
pnMU4 BF6 VG[ pHF" lJEFUGF p5ZMST lJQFI 5ZtJ[GF TFP !q!q(* GF 9ZFJ S|DF\S V[D;LVFZvZ!&( v &&(5 K DF\ H6FjIF 5|DF6[
SFI"JFCL SZJFGL ;]RGF ov
- 30 -
s!f ~FP ZP__ ,FB sA[ ,FBf YL JW] V\NFHL ZSDGF\ SFDM CMI T[JF SFDM DF8[ SFI"5F,S .HG[ZzL SFDGM JS" VM0"Z VF5[ S[ T]ZT H
SFDGF XL0I],vALGL GS, H[ T[ lJ:TFZGF DNNGLX lGIFDS VYJF ÒHLVM,MHL;L:8 VYJF VF;L:8g8Ò HLVM,MHL;L:8 VYJF E]:TZ VG[
BGLH XFBFGF ÒHL<,F SR[ZLGF J0F H[VM S,[S8ZzLGL SR[ZLDF\ A[;[ K[ T[DG[ VF5JFGL ZC[X[P sZf ~FP ZP__ ,FB sA[ ,FBf YL p5ZGF
SMg8=FS8ZMV[ T[VMV[ BZLN[, BGLHGM HyYM VG[ T[ SIF\YL BZLN[, K[ T[ J[RGFZGL lJUTM NXF"JTF AL,MGL GS,M TYF 5+GF ~5DF\ DFCLTL
NZ +6 DF; p5Z s!fP DF\ NXF"J[, VlWSFZLG[ 5]ZL 5F0JFGL ZC[X[P VF AL,MDF\ DF, J[RGFZG]\
,[GFZG]\ GFD4 DF, ,[GFZG]\ GFD VG[ HyYM JU[Z[ NXF"J[,F CMJF HM.V[P#f H~Z 50I[ H~ZL SL:;FDF\ p5Z s!f DF\ NXF"J[, VlWSFZL|zL
TZOYL JW] DFCLTL lJUT DF, S[ AL,GF ;A\WDF\ DF\UJFDF VFJ[ TM T[ H[ T[ SFI"5F,S .HG[ZzL BGLH BFTFGF VlWSFZLG[ T[ lJUTM
SMg8=FS8Z 5F;[YL D[/JJFDF\ DNN SZX[P HM VFJL DFCLTL ;DI;Z VF5JFDF\ GF VFJ[ T[ SM. SFI"5F,S .HG[ZzL4 TZOYL VF V\U[ ;CSFZ
G D/[ TM BGLH lJEFUGF VlWSFZL T]T" H VF AFAT lGIFDSzLGF wIFG p5Z D]SX[P H[VM VF V\U[ pnMU4 BF6 VG[ pHF" lJEFU TYF H[
T[ ;\A\lWT lJEFUGF ;lRJzLGF wIFG 5Z D]SX[ VG[ VFJM 5+ D?I[YL ;A\lWT lJEFUGF ;lRJzL4 H[ T[ SFI"5F,S .HG[ZzLG[ TFtSFl,S
DFCLTL 5]ZL 5F0JF ;]RGF VF5X[P VF 5|YF VD,L AGTF\ VF 5lZ5+GL TFZLBYL ;LSIMZL8L 0L5MhL8 5ZT SZJF DF8[ ZMI<8L EIF¶
V\U[GF 5|DF65+GM VFU|C ZFBJFGM ZC[X[ GCLP
ZFHI ;ZSFZGF AF\WSFD DF8[ J5FTF UF{6 BlGHGL ZMI<8L EZJF AFATPPPPP
VF SFDDF\ HIFZ[ ;FNL DF8L sVM0L"GZL S,[f VG[ s;MO8f D]ZD JF5ZJFDF\ VFJ[ T[GF p5Z 56 ZMI<8L R]SJJF 5F+ K[P lJX[QFDF[ UF{6
BGLH AFATDF\ U]P UF{PVPlGP!)&& VG[ T[GF VG];\WFGDF\ JBTMJBT ACFZ 5F0JFDF\ VFJ[,F 9ZFJM 4 ,FU] 50X[P4 VG[ T[ D]HA ,Lh S[
5ZDL8 ,[JFG]\ VG[ ZMI<8L EZJFGL ZC[X[P s pWMU4 BF6 VG[ pHF¶ lJEFU 9ZFJ S|DF\S V[DPV[DPVFZP q !!Z___ q Z_!# q K
TFP!v)v_$
!vVP SZFZ C[9/GF OF.G, AL,GL GS, HL<,FGF ;\,uG pWMU VG[ BF6 lJEFUGF HL<,FGF E]:TZ VlWSFZLG[ VF5JFGL ZC[X[P
s DFPDPlJEFUGM 5lZ5+ S|DF\S 8LV[G;L q !_q Z__Z q s!$f q ; TFPZ(v$vZ__# TYF Z*v$vZ__5 f
CLAUSE 36-A
The Contractor shall be responsible for and shall pay the expenses of providing medical aid to any
workmen who may suffer a bodily injury as a result of an accident. If such expenses are incurred by
Government, the same shall be recoverable from the contractor for with and be deducted, without prejudice
to any other remedy of Government from amount due or that may become due to the Contractor.
B\0 #&PSP
VS:DFTG[ 5ZL6FD[ SM. SFDNFZG[ XFZLZLS .HF YFI TM T[ G[ TALAL ;CFI 5]ZL 5F0JF DF8[ SMg8=FS8Z HJFANZF ZC[X[ VG[ T[ V\U[G]\ BR"
T[D6[ R]SJJFG]\ ZC[X[P VFJ]\ BR" ;ZSFZ[ SI]" CMI TM SMg8=FS8Z 5F;[YL T[ TZTH J;], SZJF 5F+ ZC[X[ VG[ ;ZSFZGF ALHF SM. 5U,FG[
AFW GF VFJ[ T[ ZLT[ SMg8=FS8ZGL ,[6L VYJF CJ[ 5KL ,[6L YGFZ ZSDDF\YL T[ SF5L ,[JFX[
Clause 36-B:
The contractor shall provide all necessary personal safety equipment and first aid apparatus available for
the use of the person employed on the site and shall maintain the same in suitable condition for immediate
use at any time and shall comply with the following regulations in connection therewith.
(A) The workers shall be required to use the equipment so provide by the Contractor and Contractor shall
take adequate steps to ensure proper use of the equipment by those concerned.
(B) When work is carried on in approximates to any place where there is a risk of drowning all necessary
equipment shall be provided and kept for use and all necessary steps shall be taken for the prompt
rescue of any person, in danger.
(C) Adequate provision shall be made for prompt first aid treatment of all injuries to be sustained during
the course of the work.
Clause 37 :
- 31 -
The quantities shown in the tender are approximate and no claim shall be entertained for quantities of work
executed being less than those entered in the tender. In the case of increase in the quantities by more than
10% the new rate will be paid to the contractor for the quantities in excess of 10%The rates for the
increased quantities as aforesaid will be fixed in the manner specified in clause – 14
(vi) The contractor shall provide drinking water facilities to the workers/ laborers employed on Government works
Amenities relating to sanitation shall also be provided to the workers/laborers employed on works (in urban areas) . if the
contractor fails to comply with these provisions, the Engineer-in-charge shall give notice in writing and if the contractor does not
provide this facility to the workers/ laborers within a period of ten days from the date of the notice in writing, the Engineer-in-
charge shall thereupon make the arrangement for drinking water at the cost of the contractor.
&f ;ZSFZL SFD[ ZFB[,F SFDNFZM o DH]ZMG[ 5LJFGF 5F6LGL ;UJ0 SMg8=FS8Z[ 5]ZL 5F0JFGL ZC[X[P sXC[ZL lJ:TFZMDF\ fSFD[ ZFB[,F SFDNFZMG[ :JrKTF
lJQFIS ;UJ0M 56 5]ZL 5F0JFGL ZC[X[P SMg8=FS8Z VF HMUJF.G]\ 5F,G SZJFDF\ lGQO/ HX[ TM CJF,FGF .HG[Z T[G[ ,[lBT GMl8; VF5X[
VG[SMg8=FS8Z VFJL ,[lBT GM8L;GL TFZLBYL NLG N;GL D]NTDF\ SFDNFZMvDH]ZMG[ VF ;UJ0 GCL VF5[ TM CJF,FGF .HG[Z SMg8=FS8ZGF BR[" 5LJFGF
5F6LGL jIJ:YF SZX[P
(vii) The Contractor shall provide the amenity of proper shade and shelter to the workers/ labourers and their children
on Government works as soon as the work starts. If the contractor fails to provide shed and shelter, the Engineer-in-
charge shall provide the same at the cost of contractor.
*f SFD X~ YFI S[ TZTH SMg8=FS8Z[ ;ZSFZL SFD 5ZGF SFDNFZM DH]ZM VG[ T[DGF AF/SMG[ IMuI X[0 VG[ VFzI VF5JFGL ;UJ0 5]ZL 5F0JFGL
ZC[X[P X[0 VG[ VFzI:YFG 5]ZF 5F0JFDF SMg8=FS8Z lGQO/ HX[ TM SMg8=FS8ZGF BR[" CJF,F .HG[Z 5]ZF 5F0X[P
Clause 43 : Method of payment :
Payment to contractor shall be made by cheque drawn on any treasury within the division convenient to them,
provided the amount exceeds Rs. 10 Amount not exceeding Rs. 10 will be paid in cash.
B\0 $# R]SJ6LGL ZLT o
R]SJ6LGL ZSD ~ !_ SZTF JW] CMI TM4 SMg8=FS8ZG[ VG]S]/ CMI T[JF 0LJLhGGF lJ:TFZGL SM.56 TLHMZL 5ZGF R[S wJFZF T[DG[ R]SJ6L SZFX[ ~FP
!_ YL JW] G CMI T[JL ZSD ZMS0[YL R]SJJFDF\ VFJX[P
Clause 43 A : Any sum of money due and payable to the Contractor (including the security deposit returnable to the
contractor) executing any Government work or work of any District Panchayat wholly financed as grant-in-aid under
this contract shall be appropriated by any District Panchayat / Government and shall be set off against any claim of
the Government/District Panchayat of Gujarat state by the District Panchayat of Gujarat State/Government for the
payment of a sum of money arising out or under any other contract made by the contractor with the
Government/District Panchayat of Gujarat State for the work wholly the contractor against any claim of the
Government / District Panchayat of Gujarat state is available, such a recovery shall be made from the contractor as
arrears of land revenue.
Clause 44 : Deleted
Clause 45 : Employment of scarcity labour :
If Government declares a state of scarcity or famine to exist in any village situated within 16 kilometers of the work,
the Contractor shall employ upon such parts of the work, as are suitable for unskilled labour, any person certified to
him by the Engineer-in-charge or by any persons to whom, the Engineer-in-charge may have delegated this duty in
writing to be in need of relief and shall be bound to pay to such persons, wages not below the minimum which
Government may have fixed in this behalf. Any disputes which may arise in connection with the implementation of
this clause shall be decided by the Engineer-in-charge whose decision shall be final and binding on the contractor.
B\0 $5 o VKTU|:T lJ:TFZGF DH]ZG[ SFD[ ZFBJF AFAT o
SFDGF :Y/[YL !& SLDLGL V\NZ VFJ[,F SM. 56 UFDDF\ VKTGL VYJF N]QSF/GL l:YTL 5|JT"TL CMJFG]\ ;ZSFZ HFC[Z SZ[4 TM H[DF\ S]X/ SFZLUZMGL
H~Z G CMI T[JF SFDGF SM. 56 EFU p5Z SMg8=FS8Z4 CJF,FGF .HG[Z VYJF T[D6[ T[ V\U[GL OZH H[G[ ,[lBT ZLT[ ;M\5L CMI T[JL jIlSTV[ H[
jIlSTV[ H[ jIlSTVMG[ ZFCTGL VFJxISTF CMJFG]\ 5|DF65+ VF%I]\ CMI T[DG[ SFD[ ZMSJFGF ZC[X[ VG[P VF V\U[ ;ZSFZ[ H[ NZ GSSL SIF" CMI T[YL
VMKF G CMI V[JF NZ[ VFJL jIlSTVMG[ J[TG R]SJJF T[ A\WFI[, ZC[X[P VF B\0GF VD, 5ZtJ[ SM.56 TSZFZ p5l:YT YFI TM T[GM lG6"I CJF,FGF
.HG[Z SZX[ VG[ T[ lG6"I SMg8=FS8Z DF8[ VFBZL VG[ A\WGSTF" ZC[X[P
Clause 46 : Deleted
Clause 47 :The rates to be quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid
submission.
However any subsequent changes in the tax structure by Government after due date of bid submission will
be compensated ( + ) on availability or submission of actual documentation. Contractor has to intimate Engineer in
charge regarding changes occurred in the tax structure after bid submission. If contractor fails to provide such
information and if any financial obligation may arise due to change in tax structure, same will be recovered from the
contractor.
The contractor shall apply fail means of stock maintenance and shall adopt accounting standards as may be
prescribed under GST. For arriving at the difference in procurement prices due to introduction of GST, it will be open
for the Government to ask for original invoices, LR, weigh bridge slips, payment details and such other documents as
may be required for the purpose.
If there is reduction in overall tapx burden then proportional benefit of that shall be passed on the
Government.
Clause 48 : The Contractor should, as far as possible , obtain his requirement of laborers skilled and unskilled , from
the nearest Employment Exchange so as to utilize the local employment potential. If there are no local Employment
- 33 -
Exchange or such Exchanges are not able to provide the required labour locally, suitable laborers should be utilised to
the maximum extent possible.
B\0 $( o SMg8=FS8Z[ HM.TF S]X/ VG[ ALGS]X/ DH]ZM XSI CMI tIF\ ;]WL GHLSDF\ GHLSGL ZMHUFZ SR[ZLV[YL D[/JJF4 H[YL :YFlGS ZMHUFZ XlSTGM
p5IMU Y. XSX[P :YFlTS ZMHUFZ SR[ZLVM G CMI VYJF VFJL SR[ZLVM H~ZL DH]ZM :YFlGS ZLT[ 5]ZF 5F0L XS[ T[D G CMI TM IMuI DH]ZMG[ AT[
T[8,F JW] 5|DF6DF\ p5IMU SZJMP
The above star rates are linked with Reserve Bank of India price index for steel and cement for the month in which
the DTP's are approved. The star rate for asphalt will be based on the rate of Koyli Refinery prevailing on the date on
which the DTP approved.
The month in which DTP are approved will be specified in the tender document
Star rates should be mentioned in the tender copy as under :-
i. For Cement, Price of cement from authorised dealer should be obtained for the month in which the DTP s
are approved & mentioned as star rate before issue of tender copy.
ii. For steel & H.Y.S.D. bars, rate of SAIL should be obtained for the month in which the DTP s are approved
and mentioned as star rate before issue of tender copy.
iii. For basic index specific month in which the DTP s are approved should be mentioned before. issue of tender
copy. The fluctuations in rates of cement and steel shall be adjusted in the bills payable to the contractors as
under :
A = B x { C1 _ 1 } x D
- 38 -
C0
Advance payment for the work done, but not measured, may be made upto 80% of the approximate value of the work
done as shown in the progress reports of approximate measurement Sheets with location furnished by the sub-
Divisional Officer subject to the following conditions :-
- 42 -
(1) That in the case of advance payment on the item of earth-work payment should be made on the basis of
detailed measurement except during the monsoon period (June to September).
(2) That the detailed measurements should be recorded within the month from the date of payment of the bill incorporating
the advance payment. However in the case of sectional measurements of earth work, detailed measurement should be
recorded within three months instead of one month stipulated above.
(3) If , on recording of the detailed measurements , it is found that the advance payment was made for more amount that
the value of work now measured, excess payment shall be refunded forthwith by the contractor on demand, if it cannot
be adjusted from the bill in which the item/s on which advance payment was given are recorded by measurements.
CLAUSE 73 - Advance Against Machineries :
1. Secured advance on plants and machineries brought to the site of work is admissible for the contracts estimated to cost
more than Rs. Ten Lacs.
2. Simple interest in such advances granted to contractor against plants and machineries brought to work sites be charged
at the rate of ________________________ % per annum.
3. The recovery of the advance shall be effected from the second month from the month in which advance is given and
fully recovery will be completed by the time seventy five percent of scheduled time is completed
4. Such advance will be limited to 5 percent of the estimated amount put to tender.
5. The advance will be granted for the plant and machinery actually brought to the site of work.
6. The machinery and equipment on which the advance is granted shall be full undisputed ownership of the contractor,
and they shall be hypothecated to Government and also comprehensively insured till the advance granted is fully
recovered. The hypothecation deed shall be executed separately before the advance is actually given.
7. The advance will be granted as 75 percent of the cost of new equipment for which the contractor is able to produce
purchase- vouchers and other documents. This will not be applicable in the case of second-hand equipment purchased
the contractor.
8. In the case of used or second-hand equipment brought by the contractor, advance will be allowed at 50 percent of the
value of the equipment arrived at in the following manner.
(a) For used equipment, for which the records of original purchase price and past utilization are available, depreciated
value, so worked out will be subject to the confirmation by mechanical wing of the Department.
(b) For used equipment, for which proper records of purchase price and past utilization are not available, the value
will be assessed by a committee of Executive Engineers of Civil and mechanical wings. The value assessed will
be based on the probable age of the equipment, its present condition and its probable depreciated value. In
working out depreciation age of the equipment, its present condition and its probable department of spares, repair,
reconditioning of the equipments shall not be taken into account towards the capital cost. The value arrived at by
the committee will be final.
9. No advance may be allowed for equipment which is more than 8 years old or which has already worked for more than
80 percent of its life.
10. No advance shall be given on transport-vehicle like jeepts, station-wagons, estate-car and such other vehicle ordinarily
required for transport purposes.
11. The recovery will have to be completed within the stipulated period of competion of work i.e._____moths.
[Specified advance on Plant and machinery brought on site of work can be given to contractor only after prior approval of
the Government [G.P.W. Vol.-I Para 344-C (i)]
CLAUSE 74 - Mobilization Advance :-
1. Mobilization advance to the extent of 5% of the estimated cost may be granted at the commencement of the work after
the contractor has set up camp on site has brought machineries, equipment and centering etc., for well-sinking and has
completed the work of service road, water-supply and lighting arrangements on the site of works which are estimated
to cost over Rs. 40.00 Lacs
2. The advance will carry a simple interest at the rate of _______% per annum
3. The recovery of advance shall commence from the sixth month from the month in which the advance is paid, and full
recovery of advance and interest shall be completed by the end of _________ month from the date of issue of work
order, In other words, the recovery of advance and interest will spread over a spell of _________ months or less as
above in equal installments.
4. A bank guarantee from a scheduled commercial bank shall have to be produced for the amount of advance applied for,
The bank guarantee can be scaled down to the extent of recovery of advance.
5. Mobilization advance will be treated as interest bearing refundable loan for the purpose. The responsibility of the
Contractor for the refund of Mobilization Advance is absolute and not depended upon the completion of the work. The
contractor will have to refund the advance with accrued interest irrespective of the fact whether the contract is breached
by either party or abandoned of finalize prematurely (Govt. R & B Dept. Reso. No. TCF-1382/(8) J dated 22-04-1985)
CLAUSE 75 :
Before starting the work, the contractor will have to obtain the license from the District Assistant Labour Commissioner
under the Contract Labour (Regulation and Abolition) Act. 1970 and contract Labour (regulation and Abolition ) Gujarat
Rules 1972 after paying necessary fees and deposit on the basis of the number of labour to be employed on the work and
will have to supply two true copies of the said license to the Deputy Executive Engineer before the work is started.
CLAUSE 76 : One percent of estimated cost put to tender for this work after deducting the cost of materials as per
Schedule 'A' valued at basic rate in the sanctioned estimate shall be deducted from the running account bills of the
contractor for testing the quality of materials and workmanship, no additional testing charges in addition to the above shall
be recovered from the contractor (Applicable to R & B Works only) (G.R.No. R & B TNC-1085-4-C, Dated 20-12-91)
- 43 -
From the contractor (Applicable to R & B works only) (G.R. No R & B TNC /1085 /-4-C Dated 20-12-91) The Engineer in charge
will get the cement and steel tested in laboratories of G.E.R.I. Engineering Colleges, Polytechnics, Engineers India Ltd, D.G.T.D.
and other laboratories approved by R & B or Water Resources Department or Industries Department and the test results of these
Laboratories will be binding to the Contractor about suitable of use of materials (G.R. No R & B TNC /1088 /IB / 220 / 18 - C
Dated 31-3-05)
However in respect of works involving use of asphalt, the contractor will set up the site testing Laboratory and will provide testing
instruments etc. as under :
Laboratory : The contractor will construct pucca structure of minimum 25 square meter area duly connected with water and
electric supply to house site testing Laboratory.
Instruments : The contractor will provide and install the instruments as per following. I.S. Standard to carry out the test prescribed
therein.
1. Penetration test as per I.S. 1203 2. Softening point test as per I.S. 1204
3. Ductility test as per I.S. 1208 4. Viscocity test as per I.S.1206
5. Specification gravity test as per I.S.1202
The instruments provided should be as per I.S. Standard , so certified and be regularly and periodically calibrated. Frequency of
tests will be as indicated in specifications and as referred in (R. & B. D. G.R. No. SSR-1099-IB/91(9)-c dated 26-7-1999)
H~ZL 5ZL1F6M OST U[ZL ,[AMZ[8ZLDF\ SZJFGF ZC[X[P
B\0 *&P! o H~ZL 5ZL1F6M OST U[ZL ,[AMZ[8ZLDF\ SZJFGF ZC[X[
SMg8=FS8Z wJFZF 5]ZF 5F0JFDF\ VFJ[, DF,;FDFGGF S[8,F\ 5ZL1F6M SZFJJF T[ V\U[GF ccXL0I], VMO 8[:8L\Ucc VF ;FY[ ;FD[, K[P VF 5ZL1F6M 5{SL !_@ 5ZL1F6M DFgI ,[AMZ[8ZL q U[ZL4 ALHF
!_@ 5ZL1F6M U[ZL ,[AMZ[8ZL VG[ AFSLGF (_@ 5ZL1F6M OL<0 ,[AMZ[8ZLDF\ SZFJJFGF ZC[X[P 5Z\T] U[ZLDF\ GLR[GF GLR[GF NZ[S 5{SL !_@ 5ZL1F6M U[ZL ,[AMZ[8ZL VG[ AFSLGF (_@
5ZL1F6M OL<0 ,[AMZ[8ZLDF\ SZFJJFGF ZC[X[P 5Z\T] U[ZLDF\ GLR[GF NZ[S 5{SL VMKFDF\ VMK]\ V[S 5lZ1F6 U[ZL ,[AMZ[8ZLDF\ TYF TYF VMKFDF\ VMK]\ V[S 5ZL1F6 U[ZL q ;ZSFZ DFgI
,[AMZ[8ZLDF\ VG[ AFSLGF :Y/ p5Z :YF5[, ,[AMZ[8ZLDF\ SZJFGF ZC[X[P
sV[f V[U|LU[8 s!f U|[0[XG sZf O,[SLG[X VG[ .,MgU[XG J[<I] s#f .d5[S8 J[<I] s$f JM8Z V[A;M5"XG sALf DF8L s!fOL<0 V[OP0LP0LP VG[ V[OPV[DP;LP sZf ;LJ V[GF,L;L; s;Lf Z[TL
zs!f U|[0[XG s0Lf .\8M s!f 0FID[gXG VG[ 8M,Zg; 8[: 8 sZf JM8Z V[A;M5"XG s.f SMgS|L8 s!f GMG 0L:8=S8LJ 8[:8 sV<8=F;MGLS 8[:8L\U 5wWlTYLf sZf ;d5 8[:8 s#f SMd5|;LJ :8=[gY sV[Of
AL8I]DLG; DLS; s!f 0FDZGL 8SFJFZL sHLf 0=FI DL1F D8LZLI, s!f U|[0[XG *&P!PZ o :Y/ 5ZGF 5lZ1F6M DF8[ .HFZNFZ[ :JP BR[" H~ZL TDFD ;FWGM ;lCTGL OL<0 8[:8L\U ,[AMZ[8ZL
SFDGF :Y/[ IMuI HuIF p5Z :YF5JFGL ZC[X[P Z:TFGF SFD DF8[ %,Fg8GF :Y/G[ SFDG]\ :Y/ U6JFDF\ VFJX[ 5Z\T] SFDG]\ :Y/ ,[AMZ[8ZL N]Z CMI TM .HFZNFZzL äFZF DMAF., ,[AMZ[8ZLGL
H~ZL jIJ:YF ZFBJFGL ZC[X[P *&P!P# o WFZF WMZ6 5|DF6[GF 5ZL1F6MGL ;\bIF 5{SL (_@ 5ZL1F6 OL<0 ,[AMZ[8ZLDF\\ .HFZNFZGF VlWS'T SJM,LOF.0 .HG[Z S[ H[VMG[ ;A\lWT SFI"5F,S
.HG[ZzLV[ I-CARD VF5[, CMI T[DGF äFZF BFTFGF GFIA SFI"5F,S .HG[ZzL q DNNGLX .HG[Z q VlWS DNNGLX .HG[ZGL CFHZLDF\H SZJFGF ZC[X[ VG[ 5lZ6FDMDF\ ;\I]S T ;CLVM
SZJFGL ZC[X[P HIFZ[ !_@ 5ZL1F6 U[ZL q ;ZSFZ äFZF DFgI ,[AMZ[8ZL sVMKFDF\ VMK] V[S 5ZL1F6f VG[ !_@ U[ZL ,[AMZ[8ZL sVMKFDF\ VMK\] V[S 5ZL1F6f DFZOT[ SZFJJFGF ZC[X[P
*&P!P$ S], 5ZL1F6MGF (_@ 5ZL1F6 V[SH :Y/[4 V[SH ;DI[4 V[SH TASSFDF\ GCL SZTF SFDGL 5|UlT D]HA H[ TASSFV[ H[ [T SFDULZLG[ VG]~5 H[ D8LZLI, JF5ZJFG]\ YT]\ CMI TN
VG];FZ X~VFTGF TASSFDF\ ZFBJ]\ TYF JrR[GF TASSFDF\ T[DH VFBZL TASSFDF\ SZFJJFG]\ ZC[X[P VFD KTF\ VF AFAT[ :YFGLS S1FFV[YL GFIA SFI"5F,S .HG[ZzLV[ H~ZLIFT D]HA
TASSF JFZ 5ZL1F6M GSSL SZX[P *&P!P5 U]6JTF lGIDGGF WFZF WMZ6 5|DF6[GF AWFH ZHL:8Z lGIlDT ZLT[ GLEFJJFGF ZC[X[P VG[ T[ H[ :Y/[ ,[AMZ[8ZLDF\ p5,aW ZC[ T[D ZFBJFGF
ZC[X[P *&P!P& HM SM. SFZ6;Z 8[:8L\UGF ;FWG V5|F%I CMI VYJF J;FJJFDF\ ;DI HFI T[D CMI S[ JC[JF~ G CMI sH[D S[ .,[S8=MD[8LS A[ZL\Uf TM VFJF 5ZL1F6M U[ZL q ;ZSFZ DFgI
;\:YFVMDF\ SZFJL XSFIP VG[ VF AFATGM lG6"I ;A\lWT SFI"5F,S .HG[ZzL q GFIA SFI"5F,S .HG[ZzL SZX[P H[ SMg8=FS8ZG[ A\WG STF" ZC[X[P U[ZLDF\ G Y. XS[ T[JF 8[:8 ;ZSFZ DFgI
,[AMZ[8ZLDF\ SZFJL XSFX[P *&P!P* U[ZLDF\ VG[ ;ZSFZ DFgI ,[AMZ[8ZLDF\ SZFJJFGF\ 8[:8L\U GM BR" .HFZNFZzL äFZF EMUJJFGMS ZC[X[P VG[ H[ .HFZNFZ SFDGL ;F.8 p5Z ,[AMZ[8ZL
G :YF5[ TM SFDGL V\NFHL lS\DTGF ! 8SF GL DIF"NFGL J;],FT DF8[ ;LDLT ZC[X[ GCLP 5ZgT] BZ[BZ R]SJJF5F+ AL,GL ZSD VWFZLT J;],FT SZFX[P sDFPDPlJPGMP TFP#!v!ZvZ__)
GM 5lZ5+ S|DF\SP 5ZR q !_Z__* q Z( q ;f
B\0 *&PZ ov VF SFD DF8[ .HFZNFZ wJFZF JF5ZJFDF\ VFJTL l;D[g8GL BF,L Y[,LVM lJEFUG[ Z5 Y[,LGF A\0,DF\ O|L VMO SM:8 5ZT VF5JFGL ZC[X[P JF5Z[,L
Y[,LVMGF 5 8SF J[:8[H U6L AFSL )5 8SF Y[,LVM l0lJhGGF D]bI DYSGF 5LP0A<I]P0LP:8MZDF\ 5CM\RF0JFGL ZC[X[P s DFPDPlJPGM TFPZv!vZ__$ GM 5ZL5+ 5ZR q
!Z_# q #)Z( q G f
B\0 ** o R}SJ6FGF AL,DF\YL H[ T[ ;DI[ ,FU] 50TM J[84 U]HZFT J[8 VlWlGIDG v Z__# D]HAGL HMUJF. D]HA R]SJ6FGF :YFG[YL SF5JF5F+ CX[ TM SF5JFDF\ VFJX[ P
CF,GL HMUJF. D]HA V[S SZM0 YL JWFZ[ lS\DTGF SZFZMGF SFDDF\ _P&_ @ ,[B[ V[0JFg; J[8 SF5JFGL HMUJF. VD,DF\ K[P VF AFAT V[8 ;M;" SF5JFG[ ,UTL CMI VF
V\U[GF SFINFDF\ JBTM JBT H[ O[ZOFZM YX[ T[ D]HA 8[1F S5FT SZJFDF\ VFJX[P .HFZNFZ[ VF EFJM 8[S; ;CLT EZJFGF CMI VF 8[S; S5FT DHZ[ D/JF5F+ GYLP sGF6F
lJEFUGF TFP!v$v_( GF HFC[Z GFDF S|DF\SP HLV[RV[G q J[8 q Z__( q V[; q 5) AL qs#fqs!f q Y
B\0 *( o R]SJ6FGF\ AL,DF\YL YI[, SFDGL lS\DTGF\ V[S 8SF ,[B[ cclA<0L\U V[g0 VWZ Sg:8=SXG JS";" J[<J[Z ;[; V[S8cc VG[ T[ C[9/ 30FI[, U]HZFTGF\ !))( GF\
lGIDMGF\ lGIDv5 GL HMUJF. D]HA pST ;[;GM OF/M J;], SZJFDF\ VFJX[P szD VG[ ZMHUFZ lJEFUGL TFZLB #!v_!v_5 GL VlW;}RGF S|DF\S o ÒPV[RPVFZP q
Z__5q_$q;LP0A<I]PV[qZ__$q($!qDv# VG[ T[ lJEFUGM TFZLB _)v!Zv_5 GM 9ZFJ S|DF\S o ;LP0A<I]PV[qZ__$q!(#!qDv#f
Annexure : The information in the following annexure specimens should be furnished on separate letter
pad if necessary.
ANNEXURE - 1
(Referred to in Condition No.-2 General Rules and Direction for the guidance of Contractors. )
To
The Executive Engineer PLACE :
------------------------------- Division : DATE :
Details regarding my our partners our Company (in the case of limited Company ) Names, address(es) ,
telephone numbers(s) income tax etc. are as under :
Sr. Name(s) of Full address of Telephone Residential Telephone Full address of
no. Person/Partner the place of No.(s) address(es) No.(s) income tax office
Director of the business (with (office) (Resi) ward where income
company pin code) tax return is filed
1 2 3 4 5 6 7
I/We hereby agree to intimate to you about change if any, in the above-mentioned address(es) and telephone No. (s) within Fifteen
days of its occurrence till may/our deposit, for the said work paid by me/us is not returned to me/us.
8[g0Z VF.8DMGF EFJM EZTL JBT[ U6TZLDF\ ,LW[, DH]ZL TYF :5[XLOLS[XGDF\ H6FjIF D]HA DF,;FDFG V\U[GF SFDGF :Y/GF 50TZ EFJM sNZf
V\U[GL lJUTP s VF lJUT #_ ,FB SZTF p5ZGF\ SFDDF\ EZL ZH] SZJL OZHLIFT K[Pf
Vf DH]ZLGF N{lGS NZ
!f DSFGM
(The date of this bond must not be prior to the date of the instrument in connection with which it is given )
Principal (Contractor)
Surety (Bank)
KNOW ALL MEN BY THESE PRESENT, THAT WE, THE PRINCIPALS AND SURETY : Above named are held
firmly bound unto the ……………………………….. hereinafter called the Employer in the amount stated for
payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors. administrators and
successors jointly and severally, firmly by these presents subject to the provisions of which the aforesaid Contractor
on demand and without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH : That whereas the principals have entered in to a contract
with the Employer numbered and dates as shown above and hereto attached for the execution of work
……………………………………………………………………………………………………………………………
…………………………………………………………………………………………………
NOW THEREFORE, if the Principal shall well and truly perform and fulfill at the undertakings, covenants, terms,
conditions and agreements of said contract during the original terms of the said Contract and any extensions thereof
that may be granted by the Employer with or without notice to the surety and during the life or any guarantee required
under the contract and shall also well and truly perform and fulfill all the Undertakings, covenants terms, conditions
and agreements of any all duty and unduly authorised modifications of said Contract that may hereafter be made,
notice of which modifications to the surety being hereby waived or shall pay over, make good and reimburse to the
Employer all loss and damages which the employer may sustain by reason of failure or default on the part of said
Principal so to do.
We ………………………………………………. further agree that the guarantee herein contained shall remain in
full force and effect during the period that would be taken for the validity of the said Contract, and that it shall
continue to be enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and
its claims satisfied or discharge or till the Employer certifies that the terms and conditions and accordingly discharges
the guarantee. Unless a demand or claim under this guarantee is made on us in writing on or before the
……………………………………………… we shall be discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have executed this instrument under their several seals on the
date indicated above the name and corporate seal of each corporate partly being hereto affixed and these presents duly
signed by its undersigned representatives, pursuant to authority of its governing body.
Principal
1……………………………………………as to ………………………………………..(seal)
2……………………………………………as to ………………………………………..(seal)
3……………………………………………as to ………………………………………..(seal)
4……………………………………………as to ………………………………………..(seal)
by…………………………………………. affix Corporate Seal
1 2(a) 2(b) 3 4 5
Note : Necessary certificate from office concerned shall be attached with the tender
;A\lWT VlWSFZLG]\ H~ZL 5|DF65+ 8[g0Z ;FY[ ZFBJ]\P
ANNEXURE - 5
LIST OF PLANT AND MACHINERY IN GOOD WORKING ORDER AVAILABLE WITH TENDERER
.HFZNFZ 5F;[ ;FZL VG[ RF,] CF,TDF\ CMI T[JF I\+M VG[ VMHFZMGL IFNL
Sr. Plant or Location Age of Make Capacity Approximat Remark
No. Machinery :Y/ Machinery AGFJ8 1FDTF e Value lJX[QF GM\W
S|DF\ VMHFZM VYJF DXLGZL S[8,F V\NFHL lS\DT
S I\+M JQF¶ H]GL K[P
1 2(a) 2(b) 3 4 5 6 7
ANNEXURE - 6
DECLARATION REGARDIG WORKS ON HAND WITH TENDERER
.HFZNFZGF CFY 5Z CMI T[JF SFDGL lJUT
Sr. Name of work Place Estimated Date of Stipulated Amount Brief Remark
No. SFDG]\ GFD :Y/ Cost issue of period of of work details of lJX[QF GM\W
S|DF\S V\NFHL work completio done on delay if
lS\DT order n date of any
SFD X~ SFD 5]Z] filling -L, HM
SZJFGF SZJFGL tender YI[, CMI
C]SDGL lGIT D]NT 8[g0Z EIF¶ TM T[GF
TFZLB TFZLB 8}\SDF\
SFZ6M
1 2(a) 2(b) 3 4 5 6 7 8
Note 1 : Amount of work in column 6 should be given up to the month previous to the month in which tenders are invited.
GM\W ov VF;G & DF\ H[ DF;DF\ 8[g0Z DF\UJFDF\ VFjI] CMI T[ 5C[,FGF DF;GF V\T ;]WL SZ[, SFDMGL ZSD NXF¶JJLP
Note 2 : Necessary certificate from the officer concerned shall be attached with the tender.
SCHEDULE – A VG];]lRvS
Schedule showing ( approximately ) the materials to be supplied from the Public works store for work
contracted to executed and the rates at which they are to be charged for
H[ SFD CFY WZJF DF8[ SMg8=FS8 SZFIM CMI T[ SFDDF\ AF\WSFD lJEFUGF :8MZDF\YL 5}ZM 5F0JFGM DF,;FDFG s VFXZ[ f VG[
T[ V\U[ J;], ,[JFGF NZ NXF¶JTL VG];}lR
Particulars Approximate Rate at which the materials will be Place of delivery
lJUT quantity charged to the contractor 0L,LJZLG]\ :Y/
V\NFHL HyYM SMg8=FS8Z 5F;[YL DF,;FDFG DF8[ ,[JFGM YTM
NZ
! Z # $ 5
Unit V[SD Rate in Rupees
EFJ ~l5IFDF\
Nil
GM\Wv! ov ~l5IF 5 ,FBYL JW] S[ VMKL lS\DTGF SFDDF\ JF5ZJF ;LD[g8 VG[ VYJF :8L, TYF SM.56 SFDDF\ 0FDZ SFDDF\ lJEFU
TZOYL 5]ZL 5F0JFDF\ VFJX[ GCLP sDFPDPlJP 9ZFJ S|DF\S 8LPV[GP;LP q !_(5 q $ q V[; TFPZ_v!Zv)! TYF V[;P8LPVFZPq!_)* q
(Z q C TFPZ*v!!v)* TYF 8LPV[GP;LPv!_(( v VF.AL q ZZ_v!(v ; TFP #!v#v_5 f 5Z\T] GD¶NF 4 H/;\5ltT VG[ 5F6L
5]ZJ9F lJEFU wJFZF SFDDF\ JF5ZJF H~ZL :8L, lJEFU wJFZF 5]~ 5F0JFGL HMUJF. TFPZ#v&v)* GF lJEFUGF 9ZFJ S|DF\S
V[;P8LPV[,Pq !_) q S[ q 5( q EFU sCf wJFZF RF,] ZFBJFDF\ VFJ[ K[P VF V\U[ X[0I], vV[ DF\ H[ HMUJF. SZJFDF\ VFJ[ T[ VFBZL
U6FX[P
GM\WvZ ov ;LD[g8 ov HIFZ[ ;LD[g8 .HFZNFZ wJFZF SFDDF\ JF5ZJF ,FJJFDF\ VFJ[ tIFZ[ VFJM ;LD[g8 .HFZNFZ
VF.PV[;P5|DF65+JF/F TYF D}/ pt5FNS S\5GLDF\YL ;LWL ZLT[ D[/JJFGM ZC[ K[P VG[ T[GL BZF. DF8[ T[GF R]SJ6FGF AL,M SFP.PzLG[
ZH] SZJFGF ZC[X[P VFJM ;LD[g8 S\5GLGF VlWST lJS|[TF 5F;[YL BZLNL XSFX[[ GCL 5Z\T] EFJ JWFZFGF :8FZ Z[.8 D]HA R]SJ6] SZJF
V\U[GL U6TZLDF\ ,[JFGF ;LD[g8GF EFJM VlWST lJS|[TF 5F;[YL D[/JL XSFI4 5Z\T] VlWST lJS|[TF 5F;[YL BZLN SZL XSFI GCLP s
TFP&v$v)( GF[ DFPDPlJP5lZ5+ 8LV[G;L q !_((q VF.AL q s!(f q ; f
GM\Wv# ov ,MB\0 ov HIFZ[ ,MB\0 .HFZNFZ wJFZF ,FJJFDF\ VFJ[ tIFZ[ T[ V\U[G]\ AL, V;,DF\ SFP.PG[ ZH] SZJFG]\ ZC[X[PVG[ VFJF
:8L,G]\ U[ZL ,[AMZ[8ZL S[ .HG[ZL SM,[H S[ 5M,L8LSGLSDF\ 8[:8L\U SZFjIF AFN H :8L, SFDDF\ JF5ZJF N[JFDF\ VFJX[P
GM\Wv$ ov 0FDZ ov HIFZ[ SFDDF\ JF5ZJF 0FDZ .HFZNFZ wJFZF ,FJJFGM CMI tIFZ[ T[ 0FDZ .HFZNFZ[ VM., ZLOF.GZLDF\YL 5{;F
EZL tIF\YL H ;LWM BZLNJFGM ZC[X[PVF V\U[ .HFZNFZ[ 5]ZL SZJFGL XZTM GLR[ D]HA ZC[X[P s!f .HFZNFZ 0FDZ SIF\YL ,FjIF T[ V\U[G]\
AL, V;,DF\ SFP.P G[ ZH] SZJFG]\ ZC[X[P sZf ZLOF.GZLGF U[85F; 56 AL, ;FY[ ;FD[, SZJFGF ZC[X[P s#f 0FDZ H[ 8[gSZDF\ ,FJJFDF\
VFJ[ T[ 8[gSZGM JFCG G\AZ ATFJJFGM ZC[X[P s$f 0FDZ p5Z .HFZNFZzLG[ V[0JFg; 5[D[g8 VYJF ;LSIM0¶ V[0JFg; D/L XSX[ GCLP
s5f .HFZNFZ[ ZH] SZ[, V;, AL,DF\ 0FDZGM U|[0 s SJM,L8L V\U[ f p<,[B CMJM HM.V[P VF V\U[ .HFZNFZ[ 0FDZGF U|[0 V\U[G]\ 8[:8
ZLh<8 q U|[0 V\U[G]\ 5|DF65+ ZH] SZJFG]\ ZC[X[P s&f .HFZNFZ[ 0FDZGL VFJS qJ5ZFX q ART V\U[G]\ ZHL:8Z %,Fg8 q ;F.8 p5Z
lGEFJJFG]\ ZC[X[P s DFPDPlJP5lZ5+ S|DF\S V[;P8LPVFZ q!_)* q (Z q C TFPZ*v!!v)* VG[ Z!v!!v)( f
Note 5 : The person or firm submitting the tender should see that the rates in the above schedule are filled
up by the Engineer-in-charge the issue of the form prior to the submission of the tender.
8[g0Z ZH] SZGFZ jIlST S[ 5[-LV[ 8[g0Z ZH] SZTF\ 5C[,F\ T[G[ VF5JFDF\ VFJTF\ OMD¶DF\ CJF,FGF .HG[Z[ p5ZGL VG];]lRDF\
NZ EZL VF%IF CMI T[GL BFTZL ,[JL
Notes 6 : Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in
addition to schedule 'B' and the specification attached to the contract agreement form.
SM. SFD DF8[ SMg8=FS8ZG[ lJGF D]<I[ 5]ZM 5F0JFGM DF,;FDFG VG];]lRvB T[DH SMg8=FS8ZGF SZFZ ;FY[ HM0[,L lJUTMGL
IFNL p5ZF\T VG];]lR vS DF\ H6FJJ]\P
- 48 -
SCHEDULE ' B'VG];]lRvB
Notes 1 - All work shall be carried out as per Public Works Department Handbook and other specifications
of Division or as directed.
GM\W v! ov AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Notes 2 - All the columns is Schedule should be filled in ink and the total of the entries in the last column
should be struck by the contractor under his signature.
GM\W vZ ov VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJL
Notes 3 - Rates quoted include clearance of site (prior commencement of work and at its close ) in all
respects and hold good for work under all conditions, site, moisture, weather etc.
GM\W v# ov 8F\S[,F NZDF\4 :Y/GL s SFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[ f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[P VG[ T[ NZ TDFD
5lZl:YlT 4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD DF8[ VD,DF\ ZC[X[P
Note 4 - To be continued on additional sheets, if found necessary.
GM\W v$ ov H~Z H6FI JWFZFGF SFU/M HM0L RF,] ZFBJ]P
Time Schedule, for completion of different designated parts of the work and rate of liquidated to be paid
by the Contractor, if he fails to complete the part of work within stipulated time limit is as detailed below :
Percentage of time of the total Percentage of work Rate of liquidated damages per
time limit day
1 2 3
Earth Work
25% 16% 0.1%
50% 50% 0.1%
75% 75% 0.1%
100% 100% 0.1%
Road work
25% 25% 1%
50% 50% 1%
75% 75% 1%
100% 100% 1%
Building Work
25% 10% 0.1%
50% 40% 0.1%
75% 80% 0.1%
100% 100% 0.1%
Bridge work
25% 10% 1%
50% 40% 1%
75% 80% 1%
100% 100% 1%
(As corrected vied B & CD GR. No. TNC - 1091 - IB - 10/(11) - C , dated 29-6-92)