Standard Membrane Bioreactor Computations
Standard Membrane Bioreactor Computations
Table A.1 Influent design flowrates and maximum monthly loading rates.
Influent flowrates
Design flux for peak-day flow based on influent flowrate 30.5 LMH*
Air scour rate for flows up to maximum monthly flowrate 10 seconds on/30 seconds off
Air scour rate for peak-day flowrate 10 seconds on/10 seconds off
Maximum allowable solids flux to the membrane surface at the net flux of the system 325 g/m 2 ·h
Membrane area A m2
(A.1)
In practice, the membrane surface area requirements for all flow conditions and operating scenarios would be assessed
against the net flux at those conditions to determine the scenario that drives design of the membrane system. For the current
example, the peak-flow condition drives the membrane system surface area requirements.
(A.2)
(A.3)
This number of large units requires 4.5 large membrane subunits per membrane tank. The membrane basin is sized to allow
installation of five large membrane subunits as a provision for further expansion. Thus, the actual spare membrane area
available is 22%.
© McGraw-Hill Education. All rights reserved. Any use is subject to the Terms of Use, Privacy Notice and copyright information.
3.10. Membrane Permeability
Permeability is used as a measurement for determining when a cleaning cycle is needed. Permeability is measured as the
temperature-corrected flux divided by the transmembrane pressure (TMP) and, therefore, simultaneously provides information
about both membrane flux and TMP, which are critical operating parameters. The membrane manufacturer recommends a
maximum typical operating TMP of 0.4 bar. At a temperature-corrected instantaneous flux value of 41.1 LMH at peak-day flow,
the minimum allowable membrane permeability is 102.8 LMH/bar.
5.0. REFERENCE
Water Environment Federation; American Society of Civil Engineers; Environmental and Water Resources Institute (2009)
Design of Municipal Wastewater Treatment Plants, 5th ed.; WEF Manual of Practice No. 8; ASCE Manual of Practice and
Report on Engineering No. 76; McGraw-Hill: New York.